REPORT NO.
: LEPL-UT-1440-01
ULTRASONIC TEST REPORT DATE: 06/07/2019
PAGE NO.:
CLIENT: JSW STEEL COATED PVT. LTD. DRAWING NO.: ACCEPTANCE STD: SECTION VIII. DIV.I, App-12, UW-53
PROJECT: PRESSURE REDUCING SYSTEM (150NB) ITEM DESCRIPTION: PIPE JOINT PROCEDURE REF.:
SURFACE CONDITION: Grinding Machining As Welded After PWHT
LOCATION: SHOP SITE WELD THICKNESS: WELD REINFORCEMENT:
COUPLANT: BASE MATERIAL: THICKNESS:
CALIBRATION BLOCK: REFERENCE CALIBRATION BLOCK: TEST RANGE :
APPARATUS: APPARATUS SR. NO.: ULTRASONIC TECHNIQUE:
Test temperature °C / °F (Max.) Ref. reflector Attenuation correction
Transfer correction Path length Grass level
STANDARD SPEC: ASME SEC. V ARTICLE IV
Reference (dB)
PROBE: FREQUENCY: TYPE: SIZE: ANGLE:
Sensitivity Scan
Sketch
Results
Sr. Seam No./ Indication Permitted
Accepted Rejected Remarks
No. Identification Marks/Type Size (mm) Size (mm)
Notes:
EXAMINED BY EVALUATED BY WITNESSED BY
Signature
Name
Date
DESIGNATION UT Examiner (NDE Level II / III) AI/IBR
Exhibit No.: 20.04, Rev-00, Dated: 10.07.2012