obit 1 Huawei BTS PAT Document Page 1 of 14
We tore _ Al ,
Ver. 2018-03-21
t-i LIA El
&HAW i S - a
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Preliminary Inspection
BTS Installation
INSPECTION DATE: 201c1 )05 1 16
PAT REQUEST REFERENCE:
Major - Affects human safety, equipment safety, service quality and long term operations
Minor - Does not affect human safety and/or equipment
Te iSric,6A1
MOBITEL
bi e Page 2 of 1 4
Huawei BTS PAT Document
We C.: r, Always.
Ver. 2018-03-21
UA. El
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Major
Not
or OK Comment
OK
Minor
1.00 Earthing
Feeder cable earth connected to ECB at 90 bend,
1.01 Major
within lm (Vertical rise)
Feeder cable earth within lm from bottom feeder
1.02
connector
Major .1 I A
If vertical feeder length >30m additional feeder
1.03 Major
cable earth connected to ECB at every 30m level ti 1 h
Feeder cable earth within lm from top feeder
1.04 Major Ni A
connector
If horizontal feeder length >20m additional feeder
1.05 cable earth connected to ECB at every 20m Major
distance t
1.16
Horizontal outdoor cable ladder should be earthed
Major ..,,-
using 35mm2 cable and lug
Outdoor cable ladder support should be earthed
1.17 using Cu tape. Support pole needs to be connected Major ''''
`
by nut & bolt
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
Sri Lanka
I" iecom
bi el
MOBITEL
Huawei BTS PAT Document Page 3 of 14
We (-Ore- Ahvor,
Ver. 2018-03-21
A 1 et
HU
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
1.18 Tower ECBs are earthed using 35mm2 earth cable Major t3 ('A
RRU DC power cable shield should be earthed at
1.19 Major 't
the BTS end
RRU should be earthed using 16mm2 earth cable to ..7
1.20 Major
ECB
2.03 Cabinet door can be opened and closed easily Major ....v
1
41
6 Ver. 2018-03-21
H LAM/El
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Ver. 2018-03-21
HuAvvel
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Sector A/P/W
4.03 Top jumper type Minor Sector B/Q/X
Sector C/R/Y
Sector A/P/W
4.04 Bottom jumper type Minor
Sector B/Q/X
Sector C/R/Y
Sector A/P/W
4.05 Top jumper length Minor
Sector B/Q/X
Sector C/R/Y
Sector A/P/W
4.06 Bottom jumper length Minor
Sector B/Q/X
Sector C/R/Y
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
Sri Lanka
Teiecom
obi tel
MOBITEL
Huawei BTS PAT Document Page 6 of 14
We Cart, Alw ff--
Ver. 2018-03-21
H LLANVIE I
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Sector A/P/W
4.07 Feeder clamping (Distance < 1.5m) Major
Sector B/Q/X
Sector C/R/Y
Sector A/P/W
4.08 Fibre clamping (Distance < 2m) Major L/
Sector B/Q/X
Sector C/R/Y
Sector A/P/W
4.09 Feeder/fibre labelling Major ‘-v
Sector B/Q/X
Sector C/R/Y
Sector Al/P1/W1 . ..
feeder/fibre inlet & other cable openings are Sector A2/P2/W2 ..
4.10 sealed properly using durable UV-resistant Major ,.../ Sector Bl/Q1/X1 ..
products Sector B2/Q2/X2 ..
Sector C1/R1/Y1 . ..
Sector C2/R2/Y2 .
GPS antenna installation and cable routing are
4.11 done properly (Using clamps when fixing to tower Major
member and cable ladder)
Sector A/P/W
4.14 Antenna at correct tower leg Major Sector B/Q/X
Sector C/R/Y
Sector A/P/W
4.15 Antenna at correct height Major Sector B/Q/X
Sector C/R/Y
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
T e 1 gict.0ib
f
MOBITEL
' bi te! Page 7 of 14
We Core_ Alw _
Huawei BTS PAT Document
Ver. 2018-03-21
HUA et
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Lat: 1, 1 QS 7 N
4.21 GPS verification (Check by LMT) Major
Long: /9 ' 9 64 7 .E
5.00 External Alarm Test
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
Sri Lanka
T eca m
MOBITEL
ite! Page 8 of 14
We Lore- Airway,
Huawei BTS PAT Document
Ver. 2018-03-21
H IJAVVil
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
Tei• sriLant
c rri
MOBITEL
' '.obitel Huawei BTS PAT Document Page 9 of 14
We Gorr- Alwayx_
4*4 Awe/
Ver. 2018-03-21
9.09 BBU Type ..9 <1 ( 0 . S/N 2-10 2-3 t 0 t") 7016 II-B.4v 052
Type . S/N '2.- I 0 2-3) Vt4 PM LV.3.L.D.Zk
9.10 UPEU Type . S/N
Type .S/N -
Type . S/N
9.11 FAN
Type . S/N
9.13 WMPT _
Type - . S/N
Ver. 2018-03-21
HUAWEI
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
_
9.19 UTRP Type - . S/N
9.37 Monitoring Module (SMU) TypeS M I) Q?:.D. ... . S/N 2 14)3/c)61-Rx 61 k-g0 0 2.1 C-4
- -\.-
9.38 User Interface Module (UIM) Type . S/N
Major - Affects human safety, equipment safety, service quality and long term operations
Minor - Does not affect human safety and/or equipment
Te I6rc 1
1-il
'.o bitel
MOBITEL
Huawei BTS PAT Document Page 11 of 14
v....Ai—a,—
Ver. 2018-03-21
A Et
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
9.40 Battery
Type S/N A 1, 4 13 0000 L9
Type S/N
Type S/N
Type S/N
Type S/N
Type S/N
Type S/N
Type S/N .._,
Type S/N
10.00 Miscellaneous
10.01 Black UV-resistant ties are used for outdoor Minor ,.....—
cable fastening
10.02 Site is clean Minor-----
10.03 Retain the additional engineering materials Minor •-- Bonding tapes, insulation tapes etc.
for future use
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
T e 1 sricizonm
MOBITEL
°bite! Page 12 of 14
We Core. Alway...
Huawei BTS PAT Document
Ver. 2018-03-21
fri LJAVVel
Site I D Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Ver. 2018-03-21
H UA Et
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Major —Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
isricLanka
T Otll
°bite!
MOBITEL
Huawei BTS PAT Document Page 14 of 14
We c..— Aiwrekty._
Ver. 2018-03-21
H UAWEI
Site I D Project Stage
Regional 0 & M Head: Ramesh Sanjaya
BTS check list shall be verified and attached with this document.
Following conditions will be checked before issuing the FAC other than the contractual FAC obligations.
+ Battery performance test will be carried out by Mobitel after 2 months period and if the
performances are low, Huawei is responsible to address the issues
+ If the Bit Error Rate too high appears in 2 months period because of the El cable from TX
devices to BBU, then Huawei is responsible to address the issue (Mobitel will perform the
test for fault identification)
+ If the Packet Loss too high appears in 2 months period because of the FE cable from TX
devices to BBU, then Huawei is responsible to address the issue (Mobitel will perform the
test for fault identification)
❖ The values of VSWR & DTF between 1.3-1.4 & 1.04-1.05 respectively will be re-tested by
Mobitel after 2 months period and if the values are further increased, Huawei is responsible
to clear issues related to VSWR & DTF at that time
+ External Alarm Test should be according the finalization monitoring solution
+ The period is calculated from the date of the accepted PAT
Site ID: tA N1 L V
Frequency Band: Cr
Date:
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
v, 06' $; fe 50
Sri Lanka
ec om
MOBITEL
obitel Huawei NodeB/eNodeB PAT Document 1 of 3
We Cane. Always.
Test Record
SN Item Sub Item Actual Record (If no test, please
Requirements
remark)
Phase to Neutral
Turn off the power for the cabinet and 2:r2 . .v
AC power on securely fix all boards. Power on AC
power switch Neutral to Earth
o-2 ..V
Load BBU 53 . V
Equipment 1.Measure the supply voltage before
1 connecting the power cord to the Load RRU_1 U/L...53 . 2- V
power on
equipment (-43.2V to -55.2VDC) Load RRU _2 U/L 53 -1 V
RRU and BBU Load RRU 3 U/L 5 3 - 2-- V
power on
2. Measure the supply voltage after BBU V
connecting the power cord to the RRU 1 U/L V
equipment (-43.2V to -55.2VDC <BBU>
<RRU>) RRU_2 U/L V
RRU_3 U/L V
If using SO U/L li 1 0 VSWR
VSWR test by The value should be less than or
LMT
fibre SiU/L 1 '1 C. VSWR
equal to 1.3
optical
S2 U/L 1"? 0 VSWR
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
gicisvi
Te MOBITEL
Mobitel Huawei NodeB/eNodeB PAT Document 2 of 3
W Care. A/ways.
Ver. 2018-03-21
I-1 A et Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
At UE connection mode and near the site Measure from INOC or RNC
(NodeB): CPICH_RSCP > -85 dBm remotely dBm
At UE connection mode and near the site Measure from INOC or RNC
Signal quality (NodeB): CPICH_Ec/Io > -8 dB remotely dB
(Optional)
At UE connection mode and near the site
Measure remotely .....dBm
(eNodeB): RSRP > -90 dBm
Alarm Check whether there are existing major This is to confirm that the
4 Alarm query
query alarms in NodeB/eNodeB NodeB/eNodeB alarms are visible
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
Sri Lanka
Te ecom MOBITEL
Mobitel Huawei NodeB/eNodeB PAT Document 3 of 3
We Care. Always.
Ver. 2018-03-21
Awe' Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Major or
OK Not OK Comment
Minor
8.00 External Alarm Test by LMT
‘)/%4-.4
For Mobitel For 1441-awei prkvec+ For Sub Contractor
Name: QLame: Name: j,
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
Te%c
*L61-ii
Direct Implementation Project - Equipments Inventory
RRU/MRFU6
BBU1 kr. _._ ___
BBU 2)02-3,0v4/676t/b1-2052:-/ 6 in 42t-2 /
BBU2
CC1 —
CC
_
CC2
_
FS1
FS
FS2 .._
UBPG1 —
UBPG
UBPG2 —
BPC BPC1 —
BPC2 —
BPL BPL1 —
BPL2 ..---
—
GTMU UK 71
-r- 1:1
4,19-1V ,2CYr 1-1 0 6 5 .4s- 5 616 le...20o 11-7 3 — arnALvi
GTMU2
of3t3e3 ___
WerBP1 2io305-7,51-1014-7-001q10 I.,- — AriA I., Li /
WBBP
WBBP2
DTMU DTMU1
Collected From Installed At/Returned to
Item Serial number
WH Site ID WH Site ID
DDPU1
DDPU2
DDPU3
DDPU 900
DDPU4 /
DDPU5
DDPU6
DDPU1 ,-
,-
DDPU2 Z
DDPU3
DDPU 1800
DDPU4
DDPU5
DDPU6
BBU 3806
WRFU
PSU
Mw IDU
Other
---'----------
--------
_--------------
.----"'
Remarks
ei-c› Ve.:\Afine V\ 0 7) IA S „DB 1-0
WOM'en \ (X, to cAre_k_t9L.A. Ge_
Removal Name
Signature
Date
Ver. 2018-03-21
HU WEI
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
BTS check list shall be verified and attached with this document.
Following conditions will be checked before issuing the FAC other than the contractual FAC obligations.
+ Battery performance test will be carried out by Mobitel after 2 months period and if the
performances are low, Huawei is responsible to address the issues
+ If the Bit Error Rate too high appears in 2 months period because of the El cable from TX
devices to BBU, then Huawei is responsible to address the issue (Mobitel will perform the
test for fault identification)
❖ If the Packet Loss too high appears in 2 months period because of the FE cable from TX
devices to BBU, then Huawei is responsible to address the issue (Mobitel will perform the
test for fault identification)
+ The values of VSWR & DTF between 1.3-1.4 & 1.04-1.05 respectively will be re-tested by
Mobitel after 2 months period and if the values are further increased, Huawei is responsible
to clear issues related to VSWR & DTF at that time
+ External Alarm Test should be according the finalization monitoring solution
+ The period is calculated from the date of the accepted PAT
Site ID: tA L
;o ‘,
1
Site Name: ktvaLo, 9 ° -11 /4A
Major —Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment