Construction Quality Report

The document appears to be a log of Non-Conformance Reports (NCRs) for quality control issues at a construction site called Fontana Towers-Juffair. It lists 34 NCRs from June 27, 2010 to November 11, 2010 relating to issues like plaster and paint quality, tile work, safety violations, and more. The status of each NCR is noted as accepted, rejected or pending. The log tracks ongoing quality control and construction issues at the site over a period of several months.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
317 views14 pages

Construction Quality Report

The document appears to be a log of Non-Conformance Reports (NCRs) for quality control issues at a construction site called Fontana Towers-Juffair. It lists 34 NCRs from June 27, 2010 to November 11, 2010 relating to issues like plaster and paint quality, tile work, safety violations, and more. The status of each NCR is noted as accepted, rejected or pending. The log tracks ongoing quality control and construction issues at the site over a period of several months.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 14

FONTANA TOWERS - JUFFAIR

S.NO. DESCRITION Date STATUS

NCR-001 Plaster & Paint Works Quality 27.06.2010 Rejected


NCR-002 Tiles Work at 10th Floor 28.06.2010 Rejected
NCR-003 Tiles Installation 04.07.2010 Accepted
NCR-004 Using unapproved materials 07.07.2010 Accepted
NCR-005 Shaft Block 05.07.2010 Accepted
NCR-006 Flexible Duct Connection for Diffuser 07.07.2010
NCR-007 House Keeping and Safety Violation 12.07.2010 Rejected
NCR - 008 Duct Wooden Sleeves 17.07.2010 Accepted
NCR-009 Inspection Request 19.07.2010 Accepted
NCR-011 Quality of the Block wall 26.07.2010 Rejected
NCR-012 Tiles Work without Bonding work 26.07.2010 Accepted
NCR-013 Tiles Protection 26.07.2010 Accepted
NCR-014 Lack of Supervision 29.07.2010 Rejected
NCR-015 Using the Mixer Machine 29.07.2010 Accepted
NCR-016 Hoist Lift Shaking 29.07.2010 Rejected
NCR-017 Lack of Coordination 29.07.2010 Rejected
NCR-018 Balcony Water Proofing 29.07.2010 Rejected
NCR-019 Safety Violation 29.07.2010 Rejected
NCR-020 Filling the Blocks 02.08.2010 Rejected
NCR-021 Balcony Upstand 05.08.2010 Accepted
NCR-022 Ceiling Framing 17.08.2010
NCR-023 Using unapproved water proofing material 11.08.2010 Accepted
NCR-024 Water Proofing 25.10.2010
NCR-023(A) Safety Violation on Site 02.11.2010
NCR-024(A) Wasting Material 02.11.2010
NCR-025 Plaster Quality 31.10.2010
NCR-026 Balcony Upstand Work Inspection 31.10.2010
NCR-027 Quality of work 31.10.2010
NCR-028 Stoppage of Work 31.10.2010
NCR-029 Kithen Ceiling 31.10.2010
NCR-030 Safety Violation on Site 03.11.2010
NCR-030 (A) Site House Keeping 07.11.2010
NCR-031 Lack of Work Coordination 08.11.2010
NCR-032 Water Proofing Quality 08.11.2010
NCR-033 Closing the Gypsum Board 21.11.2010
Re
Referen from
Date v Submittal Description & Location DIS. to SBIC Status
ce SBIC
no.

01.11.10 WIR 139-10 0 Wall Tile layout @ toilet type D, flat C, 11th floor tower B part 3 WL TL 01.11.10 03.11.10 A
01.11.10 WIR 140-10 0 Wall Tile layout @ toilet type D, flat N, 11th floor tower A part 2 WL TL 01.11.10 02.11.10 A
01.11.10 WIR 141-10 0 Wall Tile layout @ toilet type j g & e, flat A, 10th floor tower A part 1 WL TL 01.11.10
01.11.10 WIR 142-10 0 Wall Tile layout @ toilet type j & g, flat P, 11th floor tower B part 4 WL TL 01.11.10 02.11.10 A
01.11.10 WIR 138-10 0 Wall tile layout @ toilet type a b g j and d, flat o, 11th floor tower b part 4 WL TL 01.11.10 02.11.10 c
01.11.10 WIR 147-10 0 Wall tile layout @ toilet type J, 11th floor tower b part 3, flat c WL TL 01.11.10 02.11.10 A
01.11.10 WIR 144-10 0 Wall tile layout @ toilet type F & c, flat f and e, 7th floor tower A part 1 WL TL 01.11.10 02.11.10 A
01.11.10 WIR 146-10 0 Wall tile layout @ Toilet Type J, flat A & B, 7th floor tower A part 1 WL TL 01.11.10 02.11.10 A
01.11.10 WIR 145-10 0 Wall Tile Layout @ toilet type j, flat I & J, 7th floor tower A part 2 WL TL 01.11.10 02.11.10 C
02.11.10 WIR 121-10 0 All work above ceiling excluding toilet and main door area prior to closegypsum sheet flat C D G and H, 7th gyp 02.11.10 02.11.10 C
02.11.10 WIR 121-10 0 Rush and level point prior to start plaster, ground floor tower A part 1 & 2 Pl 02.11.10 03.11.10 A
02.11.10 WIR 119-10 0 All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat A B E and F gyp 02.11.10 02.11.10 C
02.11.10 WIR 120-10 0 All work above ceiling excluding toilet and main doorarea prior to close gypsum sheet flat I j m & n, 7th floor gyp 02.11.10 04.11.10 C
02.11.10 WIR 122-10 0 All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat k l o & P gyp 02.11.10 02.11.10 C
02.11.10 WIR 143-10 0 Floor Tyle layout, flat F, 8th floor tower A part 1 fl tl 02.11.10 04.11.10 C
02.11.10 WIR 145-10 0 alum 02.11.10 08.11.10 C
02.11.10 WIR 149-10 0 Wall tile layout @ toilet type C & F, Flat I and J, 7th floor tower Apart 2 WL TL 02.11.10 03.11.10 B
03.11.10 WIR 136-10 0 Floor tile Layout, flat O, 8th floor tower B part 4 Fl TL 03.11.10 04.11.10 B
03.11.10 WIR 108-10 0 Floor Tile Layout, Flat L, 11th Floor Tower B part 4 Fl TL 03.11.10 04.11.10 B
03.11.10 WIR 155-10 0 GI Lintel Plaster Works, 20th Floor Tower B Part 3 & 4 PL 03.11.10 06.11.10 A
03.11.10 WIR 156-10 0 GI Lintel Plaster Works, 21st Floor Tower B Part 3 & 4 PL 03.11.10 04.11.10 A
03.11.10 WIR 152-10 0 Wall Tile layout @ Toilet type A B G & J, Flat P, 17th floor towr B Part 4 WL TL 03.11.10 04.11.10 A
03.11.10 WIR 153-10 0 Wall tile Grouting @ Toilet Type A B G & J, Flat A, 16th Floor, Tower A part # 1 TL GRT 03.11.10 04.11.10 B
03.11.10 WIR 157-10 0 Rebars & Shuttering for lintel works @ GF, GF tower A&B Part 1& 3 LNTL 03.11.10 04.11.10 B
03.11.10 WIR 113-10 0 All works above ceiling excluding toilet & main door area prior to close gypsum sheet flat C,D,G, & H, 6th fl gyp 03.11.10 04.11.10 C
03.11.10 WIR 114-10 0 All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat K,L, O & P, 6th floor tower B pa 03.11.10 04.11.10 C
03.11.10 WIR 154-10 0 Wall tile grouting @ toilet type A B G &J, Flat O & P, 16th Floor tower B Part 4 TL GRT 03.11.10 04.11.10 B
03.11.10 WIR 14 1 5-29th Floor motion sensor installation complete with conduiting and wiring modification (Motion sensor sup MEP 03.11.10
04.11.10 wir 158-10 0 Wall tile layout @ toilet type A B G & J, Flat N, 16th Floor Tower A part # 2 WL TL 04.11.10 04.11.10 A
04.11.10 WIR 159-10 0 GI Lintel plaster works, 22nd floor tower A, part # 1 & 2 Pl 04.11.10 04.11.10 B
04.11.10 wir 160-10 0 G I LINTEL WORKS AND BLOCK INSTALLATION PRIOR FOR PLASTERING INCLUDING PASSAGE AREA LNTL 04.11.10 06.11.10 C
04.11.10 wir 161-10 0 G I LINTEL WORKS AND BLOCK INSTALLATION PRIOR FOR PLASTERING INCLUDING PASSAGE AR LNTL 04.11.10 06.11.10 C
06.11.10 WIR 106-10 0 Floor Tile Layout, Flat P, 9th floor tower B part 4 Fl TL 06.11.10 06.11.10 B
06.11.10 WIR 151-10 0 Floor Tile Layout, Flat N, 7th floor tower A part 2 Fl TL 06.11.10 06.11.10 B
06.11.10 WIR 150-10 0 Floor Tile Layout, Flat J, 11th floor tower A part 2 Fl TL 06.11.10 06.11.10 B
06.11.10 WIR 133-10 0 All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat c d g and h gyp 06.11.10 06.11.10 C
06.11.10 WIR 132-10 0 All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat I j m & n, 8th fl gyp 06.11.10 06.11.10 C
06.11.10 WIR 131-10 0 All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat AB E & F 8th fl gyp 06.11.10 06.11.10 C
06.11.10 WIR 134-10 0 All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat K L O & P 8th f gyp 06.11.10 06.11.10 C
06.11.10 WIR 16 Rev. 0 0 5th floor db to flatwise megger value/insulation resistance teast(Megger value report attached in the DB elec DB 06.11.10 08.11.10 B
06.11.10 WIR 168-10 0 Floor Tile Layout, flat C, 11th floor tower B, part 3 fl tl 06.11.10 06.11.10 B
06.11.10 WIR 167-10 0 Floor Tile Layout, flat D, 11th floor tower B, part 3 fl tl 06.11.10 06.11.10 B
06.11.10 WIR 171-10 0 Water proofing water rest @ wet area, 6th floor Tower A& B part 1 2 3 & 4 WP 06.11.10
06.11.10 WIR 164-10 0 Wall tile layout @ Toilet type A B & E, flat P, 9th floor tower B part 4 WL TL 06.11.10 07.11.10 C
06.11.10 WIR 162-10 0 Wall tile layout @ toilet type K, lat E, 11th floor tower A part 1 WL TL 06.11.10 08.11.10 B
06.11.10 WIR 166-10 0 Wall tile layout @ toilet type E, flat P, 5th floor towr B part 4 WL TL 06.11.10 07.11.10 A
06.11.10 Wir 169-10 0 Floor Tile Layout, flat O, 11th floor towr B part 4 fl tl 06.11.10 06.11.10 B
06.11.10 Wir 170-10 0 Floor Tile Layout, flat P, 11th floor towr B part 4 fl tl 06.11.10 06.11.10 B
06.11.10 WIR 172-10 0 Rebars & Shuttering for lintel works @ GF, GF tower A&B Part 1& 3 LNTL 06.11.10 08.11.10 A
06.11.10 WIR 165-10 0 Wall tile layout @ toilet type F, flat F, 9th floor tower A part 1 WL TL 06.11.10 06.11.10 B
06.11.10 WIR 163-10 0 Rebars & Shuttering for con. Seat on swimming pool 4th floor swimming pool part 5 Shuttering rebars 06.11.10 08.11.10 B
07.11.10 WIR 174-10 0 Prepertaion for balcony upstand concreting works flat F & G, 16-23 flor, tower A part 1 & 2 Civil 07.11.10 08.11.10 B
07.11.10 WIR 178-10 0 Wall Tile layout @ toilet type J, flat D, 9th floor tower B, part # 3 WL TL 07.11.10 08.11.10 B
07.11.10 Wir 177-10 0 Wall Tile layout @ toilet type C, flat E, 11th floor tower A, part # 1 WL TL 07.11.10 08.11.10 B
07.11.10 WIR 176-10 0 Wall tile layout @ toilet type C, flat L, 11th floor tower B part 4 WL TL 07.11.10 08.11.10 B
07.11.10 WIR 175-10 0 Wall Tile layout @ toilet type C, Flat E & I, 10th floor tower A part 1 WL TL 07.11.10 08.11.10 B
07.11.10 WIR 173-10 0 Floor tile layout, Flat P, 16th floor tower B, part 4 fl tl 07.11.10
08.11.10 WIR 17 0 5th floor db to flatwise megger value/insulation resistance test(Megger value report attached in the DB elecb DB 08.11.10 08.11.10 B
08.11.10 WIR 105-10 0 Floor tile layout, flat O, 9th floor tower B part 4 fl tl 08.11.10 08.11.10 B
08.11.10 WIR 179-10 0 Floor tile layout, Flat A, 16th Floor Tower A part 1 fl tl 08.11.10
08.11.10 WIR 179-10 1 Floor tile layout, Flat A, 16th Floor Tower A part 1 fl tl 08.11.10 08.11.10 C
08.11.10 WIR 197-10 0 Wall tiles prior for grouting @ toilet type A & B, 10th floor tower A part 1 WL TL 08.11.10
08.11.10 WIR 196-10 0 Wall tiles prior for grouting @ toielt type A B E J & E, flat A, 10th floor tower A part 1 WL TL 08.11.10
10.11.10 WIR 126-10 0 Floor Tile Layout, Flat H, 11th floor Tower B part # 3 fl tl 10.11.10 10.11.10 B
10.11.10 WIR 107-10 0 Floor Tile Layout, Flat G, 11th floor Tower B part # 3 fl tl 10.11.10 10.11.10 B
10.11.10 WIR 18 rev. 0 0 6th floor DB to flatwise Megger value/Insulation resistance test (Megger value report attached herwith fo db 10.11.10 11.11.10 B
10.11.10 WIR 19 rev. 0 0 6th floor DB to flatwise Megger value/Insulation resistance test (Megger value report attached herwith fo db 10.11.10 11.11.10 B
10.11.10 wir 213-10 0 G I LINTEL PLASTER WORKS, 23RD FLOOR TOWER A&B PART 1 2 3 & 4 LNTL 10.11.10 11.11.10 B
10.11.10 wir 215-10 0 WALL TILES LAYOUT @ TOILET TYPE D& F, FLAT F, 16TH FLOOR TOWER A PART 1 WL TL 10.11.10 10.11.10 A
10.11.10 wir 208-10 0 Wall tiles layout @ toilet type F, flat G, 09th floor tower B part 3 WL TL 10.11.10 10.11.10 B
10.11.10 WIR 207-10 0 Wall tiles layout@ toilet type f, flat f, 10th floor tower A part 1 WL TL 10.11.10 10.11.10 A
10.11.10 WIR 206-10 0 Wall tiles layout @ toilet type K, flat I, 10th floor tower A part 2 WL TL 10.11.10 10.11.10 A
10.11.10 WIR 209-10 0 Wall tiles layout @ toilet type g, flat pI, 07th floor tower b part 4 WL TL 10.11.10 13.11.10 A
10.11.10 WIR 205-10 0 Floor tiles layout , Flat K, 11th floor tower B part 4 Fl TL 10.11.10 10.11.10 a
10.11.10 WIR 203-10 0 GI Lintel and blockwork installation prior for plastering flat C D G & H, 11th floor tower B part 3 LNTL 10.11.10 11.11.10 A
10.11.10 WIR 202-10 0 G I LINTEL AND BLOCKWORK INSTALLATION PRIOR FOR PLASTERING FLAT K L O & P 10TH FLOR BL WRK 10.11.10 11.11.10 A
10.11.10 wir 199-10 0 Bathroom water proofing preperation flat a& b, 16th floor tower A part 1 WP 10.11.10 11.11.10 B
10.11.10 WIR 204-10 0 Gi Lintel and blockwork installation prior for plastering Flat K.L o & P, 11th floor tower B part 4 LNTL 10.11.10 11.11.10 B
11.11.10 WIR 222-10 0 Wall tile layout flat L, Type K, 11th floor tower B part 4 WL TL 11.11.10 11.11.10 A
11.11.10 WIR 221-10 0 Bathtub installation at master bathroom flat O type A, 5th floor tower B part 4 WL TL 11.11.10 13.11.10 B
11.11.10 WIR 220-10 0 Wall tile layout flat L, Type K, 11th floor tower B part 4 WL TL 11.11.10 11.11.10 A
11.11.10 WIR 219-10 0 Wall tile layout flat J, Type F, 10th floor tower A part 2 WL TL 11.11.10 11.11.10 A
11.11.10 WIR 218-10 0 Wall tile layout flat H, Type C, 11th floor tower B part 3 WL TL 11.11.10 13.11.10 B
11.11.10 WIR 217-10 0 Wall tile layout flat A, Type J & G, 12th floor tower A part 1 WL TL 11.11.10 11.11.10 A
11.11.10 WIR 216-10 0 Balcony upstand rebar work prior for concreting Flat B C N & o Rebar 11.11.10 13.11.10 B
11.11.10 WIR 214-10 0 Floor tiles layout works, flat B, 16th floor tower A part # 1 fl tl 11.11.10 13.11.10 B
10.11.10 WIR 223-10 0 Wall tile prior for grouting Flat E Type K, 11th floor tower A part 1 WL TL 11.11.10 11.11.10 B
13.11.10 WIR 217-10 0 Wall tiles layout @ toilet type F & D WL TL 13.11.10
13.11.10 WIR 216-10 0 Block work layout @ 3rd floor, 3rd floor parking area part # 5(SNT BACK) BL WRK returned 13.11.10 B
13.11.10 WIR 200-10 0 rebar an shuttering for con. Seat @ swimming pool area, 4th floor swimming pool part 5 Rebar returned
13.11.10 WIR 198-10 0 Rust coat and point level, GF tower B part 4 Civil 13.11.10 13.11.10 A
13.11.10 WIR 21 0 7th floor DB to flatwise megger value /insulation resistane test, 7th floor tower b db 13.11.10 15.11.10 b
13.11.10 WIR 218-10 0 GI lintel and block work installation prior for plastering, 11th floor tower A part 1 & 2 LNTL 13.11.10 13.11.10 B
13.11.10 WIR 222-10 0 Wall tiles layout @ toilet type J& B, flat n, 9th floor tower A part 2 WL TL returned
13.11.10 WIR 221-10 0 Wall tiles layout @ toilet type J& B, flat n, 10th floor tower A part 2 WL TL returned 13.11.10 B
13.11.10 WIR 220-10 0 Wall tiles layout @ toilet type A B J& G, flat B, 12th floor tower A part 1 WL TL returned
13.11.10 WIR 219-10 0 Wall tiles layout @ toilet type E & B, flat A, 12th floor tower A part 1 WL TL returned
14.11.10 WIR PI-64 0 PPR pressure testing @ 10 bar pressure, 26th floor tower A & B PL 14.11.10 15.11.10 A
14.11.10 WIR 236-10 0 Block work layout @ 3rd floor, 3rd floor parking area part # 5 BL WRK 14.11.10 14.11.10 A
14.11.10 WIR 200-10 0 rebar an shuttering for con. Seat @ swimming pool area, 4th floor swimming pool part 5 Rebar 14.11.10 14.11.10 B
14.11.10 WIR 232-10 0 Wall tiles layout @ toilet type J& B, flat n, 9th floor tower A part 2 WL TL 14.11.10 14.11.10 C
14.11.10 WIR 233-10 0 Wall tiles layout @ toilet type J& B, flat n, 10th floor tower A part 2 WL TL 14.11.10 14.11.10 A
14.11.10 WIR 234-10 0 Wall tiles layout @ toilet type A B J& G, flat B, 12th floor tower A part 1 WL TL 14.11.10 14.11.10 A
14.11.10 WIR 235-10 0 Wall tiles layout @ toilet type E & B, flat A, 12th floor tower A part 1 WL TL 14.11.10 14.11.10 A
14.11.10 WIR 240-10 0 Wall tiles layout @ toilet type J, flat P, 10th floor tower B part 4 WL TL 14.11.10 15.11.10 a
14.11.10 WIR 171-10 0 Water proofing water test @ wet Area, 6th floor tower A & B part 1 2 3 4 WP 14.11.10 14.11.10 c
14.11.10 WIR 237-10 0 Wall tiles layout @ toilet type C & K, flat I, 12th floor tower A, part 2 WL TL 14.11.10 15.11.10 A
14.11.10 WIR 239-10 0 Wall Tiles layput @ toilet type J, Flat O, 10th floor tower B part 4 WL TL 14.11.10 15.11.10 A
14.11.10 WIR 238-10 0 Wall tiles layout @ toilet type A & B, Flat D, 12th floor tower B part 3 WL TL 14.11.10 15.11.10 A
14.11.10 WIR 20 0 7th Floor DB to flatwise Megger value/Insulation resistance test in the db -elcb&mcbs will be fixed after inst DB 14.11.10 15.11.10 b
14.11.10 wir 241-10 0 WATER PROOFINGWATER TEST @ WET AREA, 7TH FLOOR TOWER A AND B PART 1 2 3 & 4 WP 14.11.10 15.11.10 C
14.11.10 WIR 244-10 0 WATER PROOFINGWATER PG LEAK TEST, 5TH FLOR TOWER A &b, PART 1 3 & 4 WP 14.11.10 14.11.10 A
15.11.10 WIR 249-10 0 Blockwork layout @ 4th floor, 4th floor panorama area BL WRK 15.11.10 15.11.10 A
15.11.10 WIR 245-10 0 Wall tiles layout @ toilet type D, flat B, 12th floor Tower A part 1 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 246-10 0 Wall tile layout @ toilet type A & D, Flat N, 10th floor Tower A part 2 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 248-10 0 Wall tiles layout @ toilet type J, flat D, 12th floor Tower B part # 3 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 247-10 0 Wall tiles layout @ toile type A & J, flat C, 12th floor tower B part 3 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 258-10 0 STEEL WORK @ SLOPE OF SWIMMING POOL TO START CONCRETING AREA, 4TH FLOOR SP PART Sw pool 15.11.10 21.11.10 A
15.11.10 WIR 242-10 0 Floor tiles layout works, flat o, 16th floor tower B part 4 Fl TL 15.11.10 15.11.10 B
15.11.10 WIR 250-10 0 Wall tiles layout @ toilet type G, Flat D, 12th floor tower B part 3 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 251-10 0 Wall tiles layout @ toilet type B & G, Flat C, 12th floor tower B part 3 WL TL 15.11.10 15.11.10 C
15.11.10 WIR 252-10 0 Wall tiles layout @ toilet type D, flat B, 10th floor tower A part 1 WL TL 15.11.10 20.11.10 a
15.11.10 WIR 253-10 0 Wall tiles layout @ toilet type D, flat B, 10th floor tower A part 1 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 255-10 0 Wall tiles layout @ toilet type K, Flat L, 12th floor Tower B part # 4 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 256-10 0 Wall tiles layout @ toilet type G, flat N, 10th floor tower a, part 2 WL TL 15.11.10 15.11.10 A
15.11.10 wir 257-10 0 Wall tiles layout @ toilet type j, flat P, 09th floor tower b, part 4 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 254-10 0 Wall tiles laout @ toilet type k & Gm flat e, 12th floor tower A, part 1 WL TL 15.11.10 15.11.10 A
15.11.10 WIR 171-10 2 WATER PROOFING WATER TEST @ WETAREA, 6TH FLOOR TOWER a & b PART 1 2 3 & 4 WP 15.11.10 20.11.10 c
15.11.10 WIR 22 0 8TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, 8TH FLOOR TWR A DB 15.11.10 21.11.10 B
15.11.10 WIR 146-10 1 Inspection for rusting bolts cleaning and rust removing in tower B 14 floor east elev and north elevation SG7 alum 15.11.10 20.11.10
15.11.10 WIR 147-10 1 Inspection for rusting bolts application of wash primer in Tower B 14th floor east elev and north elev SG7b/L alum 15.11.10 21.11.10 A
16.11.10 WIR 148 stage inspection for alum structural framing tower A SG08/r/r & L West Elev 27-29flr, 12-14& 04-06 on Grid alum 16.11.10 22.11.10 B
20.11.10 ME-32 0 installation of ceiling mounted exhaust fan in laundry room, 16th floor part 3 tower b civil 20.11.10 23.11.10 B
20.11.10 WIR 259-10 0 GI lintel and block work installation prior for plastering, flat A B E F I J M & N, 12th floor tower A part 1 & 2 LNTL 20.11.10 21.11.10 A
20.11.10 WIR 263-10 0 Wall tiles layout @ toilet type A B G & J, flat M, 10th floor tower A, part WL TL 20.11.10 21.11.10 B
20.11.10 WIR 267-10 0 All worksabove ceiling prior closing gypsum sheet ceiling flat k l o p 5th floor tower B part 4 gyp
20.11.10 WIR 266-10 0 All worksabove ceiling prior closing gypsum sheet ceiling flat k l o p 5th floor tower B part 4 gyp
20.11.10 WIR 262-10 0 Wall tiles layout @ toilet type A B G j flat A 17th floor tower A part # 1 WL TL 20.11.10 21.11.10 C
20.11.10 WIR 261-10 0 Wall tiles layout @ toilrt type F & D flat j, 16th floor tower A par t2 WL TL 20.11.10 21.11.10 C
20.11.10 WIR 260-10 0 Wall tiles layout @ toilrt type C E K flat I, 16th floor tower A par t2 WL TL 20.11.10 C
20.11.10 WIR 171-10 0 Water proofing water rest @ we area @ toilet type G D J flat C N & M, 6th floor tower A & B part 2 & 3 WP 20.11.10 21.11.10 C
20.11.10 WIR 149-10 0 Stage inspection for aluminium structural framing in tower B SG07 /c/l/l west elev 15-17 02-04 on grid Q alum 20.11.10 22.11.10 B
20.11.10 WIR 150-10 0 Stage inspection for aluminium structural framing in tower B SG07B/c/R/R east elev 14-24 02-04 on grid J alum
20.11.10 WIR 151-10 0 Stage inspection for aluminium structural framing in tower B SG07B/c/R/l east elev 15-27 14-16 on grid J alum 20.11.10 22.11.10 B
20.11.10 WIR 225-10 0 Floor tiles layout works, flat C, 12th floor tower B part 3 Fl TL 20.11.10 21.11.10 B
20.11.10 wir 265-10 0 All worksabove ceiling prior closing gypsum sheet ceiling flat I em & n 5th floor tower A part 2 gyp 20.11.10 25.11.10 c
20.11.10 WIR 264-10 All worksabove ceiling prior closing gypsum sheet ceiling flat AB E & F 5th floor tower A part 1 gyp 20.11.10 25.11.10 c
21.11.10 WIR 243-10 0 Dry area gypsum ceiling closing works, flat a b e f I j m& N, 16th floor tower A part 1 & 2 gyp 21.11.10 23.11.10 C
21.11.10 WIR 38 0 16th floor DB to flatwise Megger value /Insulation resistance test (megger value report attached herewith) i DB 21.11.10 22.11.10 B
22.11.10 WIR 276-10 0 Wall tiles layout @ toilet type A, flat P, 12th floor Tower B par 4 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 275-10 0 Wall Tiles layout @ toilet type K, Flat H, 12th floor Tower B, part 3 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 268-10 0 Wall Tiles layout @ toilet type A, Flat A, 12th floor TowerA, part 1 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 271-10 0 Wall Tiles layout @ toilet type A b j e & D, Flat O, 12th floor TowerB, part 4 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 272-10 0 Wall Tiles Layout @ Toilet Type F, Flat K, 9th floor tower B part 4 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 270-10 0 Wall Tiles Layout @ Toilet Type C, Flat L, 12th floor tower B part 4 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 269-10 0 Wall Tiles Layout @ Toilet Type E, Flat M, 10th floor tower A part 2 WL TL 22.11.10 22.11.10 A
22.11.10 WIR 281-10 0 Wall Tiles Layout @ Toilet Type A B G & J, Flat A, 17th floor tower A part 2 WL TL 22.11.10 23.11.10 A
22.11.10 WIR 153-10 1 Stage inspection for Aluminium structural framing SG07A/R Tower A west elevation from 27-29 floor, 06-11 alum 22.11.10 23.11.10 B
22.11.10 WIR 152-10 1 Stage inspection for Aluminium structural framing SG07A/R Tower A west elevation from 27-29 floor, 02-04 alum 22.11.10 23.11.10 B
22.11.10 WIR 154-10 1 Stage inspection for Aluminium structural framing SG07A/R Tower b west elevation from 25-29 floor, 14-16 alum 22.11.10 23.11.10 B
22.11.10 WIR 155-10 1 Stage inspection for Aluminium structural framing SG07A/R Tower b west elevation from 25-29 floor, 02-04 alum 22.11.10 23.11.10 B
22.11.10 wir PI-65 0 fire fightng riser testing, 15 bar pressure FF 22.11.10 23.11.10 B
22.11.10 wir 23 0 8TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, elcb & mcb's will be fixed aft megger 22.11.10
22.11.10 WIR 24 0 9TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, in the db elcb & mcb's will bemegger 22.11.10
22.11.10 wir 277-10 0 water proofing & leak test @ toilet type a b cd cd, e, f, g & k, flat a b e f I j m& N, 8th floor tower a, part 1&2 WP 22.11.10
22.11.10 wir 284-10 0 GI LINTEL PLASTER WORKS, 24TH FLOOR TOWER a & b PART 1 & 2 LNTL 22.11.10 23.11.10 A
22.11.10 wir 288-10 0 Fire sealent application @ passages & inside the flat, excluding fire dumper area flat a b m n c d o & p, 7th fire damper 22.11.10 25.11.10 B
22.11.10 wir 279-10 0 Fire sealent application @ passages inside the flat, excluding fire dumper area, flat A B M N C D O & O,P, 6 fire damper 22.11.10 23.11.10 C
22.11.10 WIR 280-10 0 Fire sealent application @ passages inside the flat, excluding fire dumper area, flat A B M N C D O & P, 8th fire damper 22.11.10 25.11.10 B
22.11.10 WIR 278-10 0 Fire sealent application @ passages inside the flat excluding fire damper area flat a b m n c d O & o, P, 5th fire damper 22.11.10 24.11.10 C
22.11.10 WIR PI-65 0 Fire fighting riser testing 15 bar pressure FF 22.11.10
23.11.10 WIR 282-10 0 Floor Tiles Layout, Flat N, 16th Floor Tower A, part 2 Fl TL 23.11.10 23.11.10 B
23.11.10 WIR 283-10 0 Floor Tiles Layout, Flat K, 16th Floor Tower B, part 4 Fl TL 23.11.10 23.11.10 B
23.10.10 WIR 156 0 INSPECTION FOR RUSTING BOLTS APPLICATION OF EPOXY PRIMER IN TOWER B 14TH & 15TH FLOORalum
EA 23.11.10 23.11.10 B
23.10.10 wir 25 0 9TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, in the db elcb & mcb's will be DB 23.11.10
23.10.10 wir 291-10 0 Wall tiling installation @ kitchens flat c d g j k l o & P, 5th floor towr B WL TL 23.11.10 25.11.10 C
23.10.10 WIR 289-10 0 GI lintel block work installation prior for plastering flat c d g h k l o & P, 12th floor tower B part 3& 4 BL WRK 23.11.10 24.11.10 A
23.10.10 WIR 273-10 0 Floor tiles layout, flat F, 12th floor tower A Part 1 Fl TL 23.11.10 24.11.10 B
23.10.10 WIR 293-10 0 Wall tiling installation @ kitchens Flat C D G H k L O P, 6th floor tower B part 3 & 4 WL TL 23.11.10 25.11.10 C
23.10.10 WIR 292-10 0 Wall tiling installation @ kitchens, flat A B E F I J M & N, 6th floor tower A part 1& 2 WL TL 23.11.10 25.11.10 C
23.10.10 WIR 290-10 0 Wall tiling installation @ Kitchens Flat A, B E,F I, J M & N, 5th floor tower A part 1 & 2 WL TL 23.11.10 25.11.10 C
23.10.10 WIR 230-10 0 Floor Tiles Layout, Flat G & H, 12 floor tower B Part 3 Fl TL 23.11.10 24.11.10 B
23.10.10 wir 231-10 0 Floor Tiles Layout, Flat k& L, 12 floor tower B Part 3 Fl TL 23.11.10 24.11.10 B
23.10.10 WIR 228-10 0 Floor Tiles Layout, Flat A & b, 12 floor tower A Part 1 Fl TL 23.11.10 24.11.10 B
23.10.10 Wir 226-10 0 Floor Tiles Layout, Flat D, 12 floor tower B Part 3 Fl TL 23.11.10 25.11.10 B
23.10.10 WIR 302-10 0 Block work layout @ 3 rd floor, 3rd floor tower A & B, Part 6 BL WRK 23.11.10 25.11.10 B
23.10.10 WIR 301-10 0 Block work layout @ 2nd floor, 2rd floor tower A , Part 1& 2 BL WRK 23.11.10 24.11.10 B
24.11.10 WIR 305-10 0 Wall Tiles Layout @ Toilet type D, Flat C, 12th Floor Tower B, Part 3 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 306-10 0 Wall Tiles layout @ Toilet Type F, Flat G, 12th Floor Tower B Part # 3, WL TL 24.11.10 25.11.10 A
24.11.10 WIR 307-10 0 Wall Tiles layout @ Toilet Type A B E J & G, Flat M, 09th Floor Tower A Part # 2 WL TL 24.11.10 25.11.10 C
24.11.10 WIR 308-10 0 Wall Tiles layout @ Toilet Type G, Flat N, 09th Floor Tower A Part # 1 WL TL 24.11.10 25.11.10 C
24.11.10 WIR 309-10 0 Wall Tiles Layout @ Toilet Type A B & J, Flat B, 17th Floor Tower A Part 1 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 310-10 0 Wall Tiles Layout @ Toilet Type D & F, Flat J, 16th Floor Tower A Part 2 WL TL 24.11.10 25.11.10 B
24.11.10 WIR 39 0 16th floor DB to flatwise Megger value /Insulation resistance test (megger value report attached herewith) i DB 24.11.10
24.11.10 WIR 298-10 0 Wall Tiles Layout @ Toilet Type F, Flat J, 6th Floor Tower A, Part # 2 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 297-10 0 Wall Tiles Layout @ Toilet Type F, Flat F, 6th Floor Tower A, Part 1 WL TL 24.11.10 25.11.10 C
24.11.10 WIR 300-10 0 Wall Tiles Layout @ Toilet Type J, Flat M, 6th Floor Tower A, Part 2 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 299-10 0 Wall Tiles Layout @ Toilet Type J, Flat M & N, 7th Floor Tower A Part # 2 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 294-10 0 Wall Tiles Layout @ Toilet Type F, Flat F, 12th Floor Tower A Part 1 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 295-10 0 Wall Tiles Layout @ Toilet Type E, Flat P, 11th Floor Tower B part 4 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 304-10 0 Wall Tiles Layout @ Toilet Type C E & K, Flat I, 16th Floor Tower A part # 2 WL TL 24.11.10 25.11.10 B
24.11.10 WIR 303-10 0 Wall Tiles Layout @ Toilet Type C E & K, Flat E, 16th Floor Tower A part # 1 WL TL 24.11.10 25.11.10 A
24.11.10 WIR 312-10 0 Rush coat & point level @ Ground Floor, Ground Floor Tower B part 3 & 4, GF Tower B Part 3& 4 alum 24.11.10 25.11.10 B
24.11.10 WIR 296-10 0 Floor Tiles Layout, Passage Area, 5th Floor Tower A part 1 & 2 Fl TL 24.11.10 25.11.10 B
25.11.10 WIR 297-10 0 wall TILES LAYOUT @ TOILET TYPE F, FLAT F, 6TH FLOOR TOWER A PART 1 WL TL 25.11.10
25.11.10 WIR 314-10 0 wall TILES LAYOUT @ TOILET TYPE C, FLAT H, 12TH FLOOR TOWER B PART 3 WL TL 25.11.10
25.11.10 WIR 313-10 0 wall TILES LAYOUT @ TOILET TYPE G, FLAT M&n, 09TH FLOOR TOWER A PART 2 WL TL 25.11.10
25.11.10 WIR 157 0 INSPECTION FOR RUSTING BOLTS APPLICATION OF EPOXY PRIMER IN TOWER B 14TH & 15TH FLOORalum
EA 25.11.10
25.11.10 wir 311-10 0 FLOOR TILES LAYOUT, FLAT I, 16TH FLOOR, TOWER a PART # 2 Fl TL 25.11.10
FONTANA Project
(MAR) MATERIAL APPROVAL REQUEST

Referenc to
# Date Rev. Submittal Description & Location from Status
e consult
1 08.09.10 A-16-10 0 Hilti Fire Stop System CP 606 DSE
2 08.09.10 D-0015 0 Hilti Fire Stop System CP 606 (with sample material) SBIC
3 14.09.10 A-14-10 0 Panoramic Glass DSE
4 11.10.10 A-17-10 0 panaromic glazing steel structure, hilti sweitzerland dse
5 12.10.10 MAC-001-10 0 Wall & Ceiling Paint (Jutton), colour cahrt and data sheet Dev-const Dev-const b
6
7 18.10.10 MAC-002-10 0 water proofing for bathrooms and balconies Dev-const Dev-const b
8 20.10.10 MAC-003-10 0 Rockwool for installation back of the aluminium cladding
9 23.10.10 MAC-002-10 1 water proofing for bathrooms and balconies Dev-const Dev-const b
10 25.10.10 MAC-004-10 Aluminium welding on aluminium pipe handrailing for l shape balcony deep sea
11 28.10.10 AC-30 0 Fire Damper (ModelAFD3), air master catalogue enclosed
12 31.10.10 MAC-002-10 water proofing for bathrooms and balconies, golden care construction caluse A, letter f Dev-const Dev-const b
13 31.10.10 MAC-005-10 Fiber mesh for use with toilets water proofing (alyaf ts163+), bathrooms & toilets, alyaf Dev-const Dev-const a
14 31.10.10 MAC-006-10 Fire damper (moel AFD3). As per drawings, air master, uae, clause e, catalogue 50% ( Dev-const Dev-const b
15 04.11.10 MAC-007-10 0 GI profiles for gypsum ceiling Dev-const Dev-const a
16 08.11.10 MAC-008-10 0 Sigma acrylic primer sealer, walls floors in the typical floors and car parking floors,sigma ksa skyline trading cor b
17 23.11.10 DAC-005-10 0 Drawing & Document, window cleaning system, elevations of the towers
18 23.11.10 MAC-010-10 0 Submittalfor fire stop application, al mahroos bsc dev-cons dev-cons b
19 23.11.10 MAC-011-10 0 Fire Damper (Model -AFD3) dev-cons dev-cons b
20 24.11.10 DAC/s-28-10 0 Submission of structural calculations for typical panels
21 24.11.10 MAC-012-10 0 Sanitary services products, axis-arepro dev-cons dev-cons a
22 25.11.10 dac-006-10 0 Drwing INTERNal doors details@ tyical floors, frm 5th to 29th typical floors
return
date

14.10.10

18.10.10

23.10.10

31.10.10
31.10.10
31.10.10
06.11.10
09.11.10

25.11.10
23.11.10

25.11.10
(DAR) DRAWING / DOCUMEN

# Date Transmittal # Drawing # Rev.


1 28.06.10 DEEP-1016 0
2 08.07.10 sbic-1086 emco/c-323/elp-01 0
3 10.07.10 sbic-1086 emco/c-323/EM-01
jana-1090
4 25.07.10 dse/sbic/320/2010 0
5 26.07.10 deep-1018 0
6 12.08.10 DEEP-1019 1
7 15.08.10 Gulf-1003 GLBO10-MP05 0
8 DEEP-1020 0
1 17.08.10 BUKA-0001 BUKAMAL 0
10 17.08.10 0
11 17.08.10 0
12 17.08.10 0
13 23.08.10 EMCO - 1103 EMCO/C-323/ELP-01 0
14 29.08.2010 DEEP-1021 DEEP-1021/ BR-01 BR--02 0
15 29.08.2010 DEEP-1022 DEEP-1022/ PE-01 & PE-02 0
16 01.09.2010 SBIC-1099 -R AR-0025-10 3
17 01.09.2010 SBIC-1101 AR-0026-10 0
18 07.09.2010 EMCO-1104 EMCO-1104 0

19 07.09.2010 BU-KA-001 r BU-KA-001 r 1

20 07.09.2010 SBIC-1102 SBIC-1102 0


21 21.10.10 DAC/s-23-10 DAC/s-23-10 0
22 16.10.10 + 0
23 27.10.10 DAC/S-24-10(Returned) DAC/S-24-10
24 04.11.10 DAC-002-10 DAC-002-10 0
25 09.11.10 DAC-003-10 DAC-003-10 0
26 20.11.10 DAC-004-10 DAC-004-10 0
27 24.11.10 DAC/s-28-10 DAC/s-28-10
FONTANA PROJECT
) DRAWING / DOCUMENT APPROVAL CERTIFICATE

from
Description & Location to SBIC Status Disc
SBIC
STRUCTURAL CALCULATIONS FOR PANARAMIC GLAZING 28.06.10 sameer
generator electrical room layout (GF) 08.07.10
Modification flats ("6l, 7e&11H)electrical layout 10.07.10 kumar

structural calculations for steel support for cladding wings 25.07.10 socotec
struction calculationsfor typical curtain walls 26.07.10
STRUCTURAL CALCULATIONS FOR PANARAMA GLAZING 12.08.2010
Main Swimming Pool - Balance Tank 15.08.10
Design and Structural Calculation for Mast. 15.08.10
Garbage chute system Plans Block 1 & 2
Garbage chute system Section 1 & 2
Garbage chute system Details A
Garbage chute system Details B
generator electrical room layout (GF) Rev-E
Balcony Railing Elev.Plan & Details
Panaromic Elev, Plan & Details
Tiles Layout of ApartmentS @ Typical Floors. 01.09.10
Emco/C-324/AC-07 HVACon
Internal Stair case details ducting layoutFloors
Penthouse (5th to 15th floor ) 01.09.2010
Rev-4
GC-001Garbage chute system planlayout
Block(116th
& 2 toRev-1 07.09.10
Emco/C-324/AC-06 HVAC ducting 29th floor)
GC-002
Rev-2 Garbage Chute system section block 1 & 2 07..09.10
GC-003
AR-0027-10Garbage chute system
to AR-0037-10 Details
Typical floorAToilets
Rev-1 Tile Details
GC-004 Garbage chute System details B
(Typ.A,B,C,E, 07.09.10
D,H,F ,J & k)
FIN preliminary drawing and details 21.10.10
PH low level lighting layout,PH upper level lighting layout, PH lo 24.10.10 b
Curtain wall/ Cladding wings elevations and sectional details(Returned)
PENTHOUSE SWIMMING POOL DETAILS (HARD AND SOFT 06.11.10 C
electrical layout flat 7e, modification
ladies pool fittings and pipe work layout dev-const
Submission of structural calculations for typical panels