100% found this document useful (3 votes)
702 views3 pages

Aashto T 195-67 (2007)

Uploaded by

dody indra praja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (3 votes)
702 views3 pages

Aashto T 195-67 (2007)

Uploaded by

dody indra praja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
‘Standard Method of Test for Determining Degree of Particle Coating of Asphalt Mixtures AASHTO Designation: T 195-67 (2007) ASTM Designation: D 2489-02 7 ‘SCOPE aa, ‘This mato covers the tena ofthe degre of parle cating in an spat mx on he tsi the percnage of couse agro prls thee completely cone Dtemiation of te prentage of cose paricls for varying ling tines may be ose fo exblah te est. ‘xing time reqe to preduesttctan cot of he gabe fro ive ef colons. hs tml pes ominrs oti gpg mortal mim epg 12. ‘The vals stdin ST nis ae o be eared a testa. REFERENCED DOCUMENTS 2a AASHTO Sundari: 18M, Wie Cloth Sieve for Texting Papen 1 T 16S, Sampling Bituminous avg Mises "APPARATUS 3A Seer. in) 475. ose conforming 2. 32. Sopwich For tckng eal ig ie. — as. Themometer—Wits age fom 10 1 20444C (501400). aA. Semple Soe 36. Semple Trae. ‘SAMPLING 4a Bath Plan—Perit hepato ope tan eased ming time pr ach (med bya stopwatch 42, Contos Hon Eni ming ine by wo flowing Soma AASHTO 43. 44, 54 32, 53, Tee Pog Mil Comes rag it Oupt, (5) o ‘Samples valde en athe spb ming pla, mmecitely afer charge ftom the po ‘ly rom tres aoa skonde of mre (See 158) ‘The moat of terial equi to perfor the esis proms 23 1036kg (58). PROCEDURE ‘Sieve cash material mest, while i sil oon 9 Sn yi) seve for material with nna larger thas 9am (lin). For mail witha ti sf 9.5 ma (Ginn) ores ces 4.5m Nor 4) shoves Tae ssa age enough tye Yeoromn 200 ad ‘So coarse partes ened ot the 9m Ciein) or 475m (No 4 sev, Do not oveoad tte sieves if necnay see he sample avo ore operations. Shaking shold be ede 0 {Ttseum 1 prove! eowing of nrotd prices ac the pails on aclenserice na ane pri ye, an tt eouning immed. ‘Vey carefily examine each rile under det nit, orrcent ih, rir iat ion, Ieven ny speck of uncoated stone ate, casa the parce "parally ‘ucsred"Ifcomplely cated, casify the particle a "roll cated” CALCULATION ‘The rege compton allows: No.of Completely Con Pats «100, Percent of Contd Parties = ley Cone Pai REPORT ‘apo te flog infra: “ye lant ocontino Typeofmie Ming ine the ere 0 mi xing tempeh eres C6) escent of conte parle the pet pete. ‘PRECISION AND BIAS Prison -No pression dati Tez ARSHTO 02 Bias—Snc ther ae mo accepted reference matrilitbefr determining the bit fh test ‘neta, statement of bis presented. KEYWORDS ot pba asphalt ising plan coating: mixing ine; pug il co Ties ASHTO

You might also like