SR - No Description Unit Nos Sides L W D/H Remarks Quantity SFT

This document provides a summary of plaster work and waterproofing quantities for various areas labeled EV-1 through EV-10a, minarets, dome areas, and a water tank. It includes the item description, unit, number of sides, length, width, depth/height, and total square footage for each item. The grand totals provided are 21,820.40 square feet for ceiling plaster work and 5,075.96 square feet for waterproofing.

Uploaded by

Malik Bilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views2 pages

SR - No Description Unit Nos Sides L W D/H Remarks Quantity SFT

This document provides a summary of plaster work and waterproofing quantities for various areas labeled EV-1 through EV-10a, minarets, dome areas, and a water tank. It includes the item description, unit, number of sides, length, width, depth/height, and total square footage for each item. The grand totals provided are 21,820.40 square feet for ceiling plaster work and 5,075.96 square feet for waterproofing.

Uploaded by

Malik Bilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Sector-A Plaster Work (Labour Rate)

Quantity
Sr.No Description Unit Nos Sides L W D/H Sft Remarks

EV-1 Sft 1 1 50.00 27.00 1350.00

EV-2 Sft 2 1 23.50 27.00 1269.00

EV-3 Sft 2 1 11.83 15.00 354.90

EV-4 Sft 2 1 34.50 24.00 1656.00

EV-5 Sft 2 1 12.50 15.00 375.00

EV-6 Sft 2 1 13.25 30.00 795.00

EV-7 Sft 2 1 78.00 20.00 3120.00

EV-7a Sft 2 1 50.00 14.00 1400.00

EV-8 Sft 2 1 13.25 30.00 795.00

EV-9 Sft 2 1 11.25 30.00 675.00

EV-10 Sft 1 1 46.50 17.00 790.50

EV-10a Sft 1 1 24.00 15.00 360.00

Minarates Sft 4 1 24.00 63.00 6048.00

Dome areas Sft 1 1 2400.00

Water Tank Sft 1 4 12.00 9.00 432.00

Grand Total Of Ceilling Plaster (item No-04) 21820.40 Sft


WATER PROOFING

Quantity
Sr.No Description Unit Nos Sides L W D/H Sft Remarks

EV-1 Sft 1 1 50.00 27.00

EV-2 Sft 2 1 23.50 19.00 893.00

EV-3 Sft 1 1 11.83 12.00 141.96

EV-4 Sft 2 1 34.50 2.00 138.00

EV-5 Sft 2 1 12.50 12.00 300.00

EV-6 Sft 2 1 13.25 30.00

EV-7 Sft 2 1 78.00 20.00

EV-7a Sft 2 1 50.00 14.00

EV-8 Sft 2 1 13.25 30.00

EV-9 Sft 2 1 11.25 22.00 495.00

EV-10 Sft 1 1 46.50 17.00

EV-10a Sft 1 1 24.00 9.50 228.00

Minarates Sft 4 1 24.00 27.00 2592.00

Dome areas Sft 1 1

Water Tank Sft 1 4 12.00 6.00 288.00

Grand Total 5075.96 Sft