GLENCORE TECHNOLOGY
EMPLOYEE ASSESSMENT
AND
OBSERVATION LOG BOOK
Employee Name Site
Employee No Date Issued
Competent Yes No Date Completed
Reason not
completed
Completed on Revision Date
1
GLENCORE TECHNOLOGY
TABLE OF CONTENTS
NO DESCRIPTION PAGE
CP Cover page 1
ToC Table of Contents 2
AQ Assessment Questionnaire 3 - 11
1 Grinding Disc Markings & Rotation 12 - 13
2 Hydraulic Power Pack Inspection 14
3 Mill Disassembly 15 - 16
4 Removal of Discs from the Shaft 17 - 18
5 Installation of Discs onto the Shaft 19 - 20
6 Disc/Hub Rebuild Procedures 21 - 22
7 Disassemble 23
8 Gland Inspection 24
9 Gland Assembly 25
10 Gland Packing Adjustment 26
11 Gland Housing Installation 27
12 Gland Housing Removal 28
13 Gland Disassembly 29
14 Drive end flange inner liner replacement 30 - 31
15 Dismantle and Rebuild the Rotor 32
16 Shell Liner Measuring 33
17 Remove or Rotate a Used Shell Liner 34
18 Install a New Shell Liner 35
19 Low Speed Coupling Check 36
20 High Speed Coupling Check 37
21 Mill Shaft Bearing Check 38
22 Main Shaft Removal 39 - 40
23 Main Shaft Installation 41 - 42
IOH Inspection/Observation History 43
PTO 1–2-3 43
PTO 4–5–6–7-8 44
PTO 9 – 10 – 11 – 12 - 13 45
PTO 14 – 15 – 16 – 17 – 18 - 19 46
PTO 20 – 21 – 22 - 23 47
2
GLENCORE TECHNOLOGY
Maintenance Questionnaire Assessment
Employee Section Date
Empl. No. ID Number
Assessor Competent Not Yet Competent
Name
Acc. No
Plant Outlay (Place correct number next to correct component)
No Question Answer C NYC
1 Isa charger water tank
Motor
Isamill
Motor lubricating system
Isamill bearing lubricating system
Sieve bend (Mill Feed)
Gearbox lubricating gearbox
Isa charger screen(Media)
Liquid resistance starter
Gland water tank
2 Write down the required P.P.E you 1) __________________________
must wear before plant
maintenance in the answer column. 2) __________________________
Required P.P.E (8) 3) __________________________
4)___________________________
5)___________________________
6)___________________________
7)___________________________
3
GLENCORE TECHNOLOGY
8)___________________________
Plant Outlay (Place correct number next to correct component)
No Question Answer C NYC
3 Feed pumps
Discharge tank
Isa charger
Feed tank
Media hopper
Discharge pump
Isamill Chamber Main Components (Place correct number next to correct component)
No Question Answer C NYC
4 Non Drive Flange (NDE)
Displacement body
Shell Liner Shell
Rotor
Shaft/Key
Grinder disk
4
GLENCORE TECHNOLOGY
Spacer
Drive End Flange (DE)
Shell Liner
No Question Answer C NYC
5 What is the “GOLDEN RULE”
before doing maintenance on Do a complete lockout procedure.
the Isamill Plant?
Wear the correct P.P.E
Use the correct tools
6 When would you do a risk
assessment on the plant? During stripping of the Isamill
components
Before doing any maintenance
After maintenance is completed
7 What are the factors to be
considered in the risk 1) ____________________________
assessment process?
____________________________
Write in short your own words
in the answer column. 2)_____________________________
_____________________________
3)_____________________________
_____________________________
4) _____________________________
_____________________________
5) _____________________________
_____________________________
6) _____________________________
_____________________________
7) _____________________________
_____________________________
5
GLENCORE TECHNOLOGY
No Question Answer C NYC
8 What is the reason for doing a Assess all hazard conditions
risk assessment?
Minimizing hazards
Prevention of personal injuries.
9 What special service tools are Hydraulic power pack
supplied with the mill to aid in
handling the components? Heavy duty screw driver
Shaft lifting swiveling eye bolts
Shell/Mill frame swiveling eye bolts
Shaft support jack DE, c/w jacking
handle
Carpenter hammer
Shaft support jack NDE, c/w jacking
handle
Disc/rotor installation device
Ring spanner
Displacement body wear plate
assembly lifting tool
Shaft end cap hex keys
Wooden mallet
Flange liner alignment bolts
Disc hub lifting tool
Shell liner lifting tool
Shell liner measuring tool
10 Is it important to keep tools free Yes keep the tools free from rust
from grease and oil during use?
No lubricate moving components
Yes to prevent tools from slipping
6
GLENCORE TECHNOLOGY
No Question Answer C NYC
11 Are any employees allowed to Yes the foreman in charge
operate the crane during the
lifting of Isamill components? Any employee to speed up the work
Only a competent certified
employee under DMR 18(11)
12 Is it important to know the S.W.L No will be safe for any load lift
of crane, slings, shackles and
eye bolt? Yes, to safely lift components
Only the crane operator has to know
that.
13 Why is it important to use a soft It is stronger than chains and wire
sling when lifting Isamill rope
components?
Prevent damage to Isamill
components
Can lift more weight
14 Is it important to de-pressurise Yes
the Isamill system before
maintenance? No
15 From what height must you use 1.5m
Fall Arrest equipment as
prescribed by the Occupational 2m
Health and Safety Act?
3m
16 Is it important to give clear and Yes very important
understandable instructions to
fellow employees during Isamill No the other person know what to do
maintenance?
No that is why we have induction
sessions
17 Is it important to do a lockout No not necessary hydraulics don’t
procedure on the Hydraulic work
power pack after extraction of
the Isamill grinder shell? Yes prevent anybody operating the
Hydraulic pack
No persons know not to use the
Hydraulic pack during maintenance
7
GLENCORE TECHNOLOGY
No Question Answer C NYC
18 When must inspections be done Before maintenance starts on a daily
on P.P.E, Tools, and Lifting basis
equipment?
During maintenance
After completion of maintenance
19 When doing inspection on the grinder discs, what would the following markings
represent,
Use the letters at the bottom and place it in the correct box on the left side.
A B C D E F
No Question
20 What is the minimum disc width for:-
Mill Size New Size Answer C NYC
M5,000 90mm
21 What is the minimum disc diameter for:-
Mill Size New Size Answer C NYC
M5,000 1200mm
8
GLENCORE TECHNOLOGY
9
GLENCORE TECHNOLOGY
22 What is the minimum flange liner thickness for:-
Mill Size New Size Answer C NYC
M5,000 30mm
23 What is the minimum shell liner thickness for:-
Mill Size New Size Answer C NYC
M5,000 30mm
24 What would you do if you find any Report it to the safety officer to
hazardous, notices or decals have it replaced
damage on the plant or machinery?
Will not be necessary to report
it, is not a hazardous risk
Plant and machines is built to
be safe
25 Is it important to work in groups, Yes it helps to prevent
pairs or to have a spotter during unforeseen hazards to a fellow
work operations? worker
No it prevents other workers
from doing their job
Sometimes it is necessary to
use other workers
26 Are you allowed to do any Yes if necessary
modifications on the machine?
Only the manufacturer of such
machine
Small modifications is allowed
27 Before cleaning the machine with Cover or seal all openings that
water or other cleaning agents........ should be protected from
moisture due to safety or
operational reasons. Especially at
risk are electric motors and
switch cabinets
Cover all openings to the
grinder discs and shaft for rust
Cover the rotor and
displacement body
10
GLENCORE TECHNOLOGY
No Question Answer C NYC
28 Is it safe to walk under a suspended No
load?
Yes
Yes to take a quick shortcut
29 Is it wise to use a tagline while lifting Yes
mill components?
No
Sometimes
30 A chain or wire rope slings is safer Yes it won’t break easy
and stronger to lift grinding wheels?
Chain or wire rope slings don’t
slide easy
No it will damaged internal mill
components
31 Will you double check the grinder No not necessary the grinder
shell inside for any tools left inside wheels will grind it to small pieces
before closing the grinder shell
assembly? Yes tools would damage
internal components at startup
Will not cause any damaged to
internal components
32 How would you know which side is By the motor position
the Non Drive End (NDE)?
No motor fitted on the side
No Direct Entry
33 Would you Lock the Hydraulic Yes
Power Pack wheels preventing it
from moving? No
If standing on a gradient
34 Which calculation would you use to
determine the grinding disc D = C/π
diameter?
D = 2hr
D = R/π
11
GLENCORE TECHNOLOGY
No Question Answer C NYC
35 What is the last action you would Take measurements of the final
take before closing the mill? closing conditions of the mill
components. Fill in the mill
maintenance log and determine
the hours to the next day.
Measurements of the shaft end
cap
Take measurements of the
displacement body
36 What must be done with rot able To be sent back to the relevant
items? fabricators
Place in store
Discard it
37 What is the torque of the Disc Hub connecting bolts.
38 What is the Torque of the Shaft End Cap Bolts
39 What Grease is used to lubricate the Shaft?
40 Why is it important to clean the parts before installing them onto the
IsaMill Shaft?
41 How Many Discs are there on the shaft.
42 How Many rings of packing are in the Gland?
43 When do you know when to replace a Disc.?
44 How many types of discs are there and how many of each type.
45 How many positions can the shell Liner be positioned.
12
GLENCORE TECHNOLOGY
_______________________________ ___________________________
Observer Signature Employee Signature
END OF QUESTIONNAIRE ASSESSMENT
TASK OBSERVATION / INSPECTION
Date: _______________________________ Time: ______________________________
Site Name: _Las Bambas____________ Observer name: __Glenn Martin_______
Employee observed: ________________________________________________________
13