The document reports on tests of a tapered duct system at two positions. In test position 1, the duct tapers from 14° to 21° and flow rate, velocity, static head, dynamic head and total head are measured at six locations along the duct. In test position 2, the duct tapers from 21° to 14° but no data is reported. Graphs show the relationship between distance in the duct and measured head values for three tests in position 1.

Uploaded by

irfan bashir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views9 pages

Lab Bernoulli

The document reports on tests of a tapered duct system at two positions. In test position 1, the duct tapers from 14° to 21° and flow rate, velocity, static head, dynamic head and total head are measured at six locations along the duct. In test position 2, the duct tapers from 21° to 14° but no data is reported. Graphs show the relationship between distance in the duct and measured head values for three tests in position 1.

Uploaded by

irfan bashir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Position 1: Tapering 14° to 21°

Static Total
Test Volume
Time (sec) Head Head
section (Liter)
(mm) (mm)
h 256 251
1 Input Data
h2 205 250
h3 156 250
9.5 60
h4 98 247
h5 42 240
h6 125 152

h1 179 184
h2 167 184
h3 156 184
3.5 60
h4 144 184
h5 130 183
h6 145 163

h1 170 167
h2 152 184
h3 136 184
5.5 60
h4 118 184
h5 99 183
h6 124 163

Position 2: Tapering 21° to 14°


Static Total
Test Volume Time
Head Head
section (Liter) (sec)
(mm) (mm)
h1
h2
h3
h4
h5
h6

h1
h2
h3
h4
h5
h6

h1
h2
h3
h4
h5
h6
Measured
Distance Static Dynamic Calculated
Test Flow Area Flow Rate Velocity Total
Test No. into duct Head Head Total Head
Section (m²) (m³/s) (m/s) Head
(m) (m) (m) (m)
(m)
h1 0 4.90E-04 0.323 0.256 0.005 0.261 0.251
h2 0.06028 1.50E-04 1.056 0.205 0.057 0.262 0.250
h3 0.06868 1.10E-04 1.439 0.156 0.106 0.262 0.250
1 1.58E-04
h4 0.07318 9.00E-05 1.759 0.098 0.158 0.256 0.247
h5 0.08108 7.90E-05 2.004 0.042 0.205 0.247 0.240
h6 0.14154 4.90E-04 0.323 0.125 0.005 0.130 0.152
h1 0 4.90E-04 0.119 0.179 0.001 0.180 0.184
h2 0.06028 1.50E-04 0.389 0.167 0.008 0.175 0.184
h3 0.06868 1.10E-04 0.530 0.156 0.014 0.170 0.184
2 5.83E-05
h4 0.07318 9.00E-05 0.648 0.144 0.021 0.165 0.184
h5 0.08108 7.90E-05 0.738 0.130 0.028 0.158 0.183
h6 0.14154 4.90E-04 0.119 0.145 0.001 0.146 0.163
h1 0 4.90E-04 0.187 0.170 0.002 0.172 0.167
h2 0.06028 1.50E-04 0.611 0.152 0.019 0.171 0.184
h3 0.06868 1.10E-04 0.833 0.136 0.035 0.171 0.184
3 9.17E-05
h4 0.07318 9.00E-05 1.019 0.118 0.053 0.171 0.184
h5 0.08108 7.90E-05 1.160 0.099 0.069 0.168 0.183
h6 0.14154 4.90E-04 0.187 0.124 0.002 0.126 0.163
h1 0 4.90E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h2 0.06028 1.50E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h3 0.06868 1.10E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
4 #DIV/0!
h4 0.07318 9.00E-05 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h5 0.08108 7.90E-05 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h6 0.14154 4.90E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h1 0 4.90E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h2 0.06028 1.50E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h3 0.06868 1.10E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
5 #DIV/0!
h4 0.07318 9.00E-05 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h5 0.08108 7.90E-05 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h6 0.14154 4.90E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h1 0 4.90E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h2 0.06028 1.50E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h3 0.06868 1.10E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
6 #DIV/0!
h4 0.07318 9.00E-05 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h5 0.08108 7.90E-05 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
h6 0.14154 4.90E-04 #DIV/0! 0.000 #DIV/0! #DIV/0! 0.000
Test 1

0.300

0.250

0.200
Head

0.150
(m)

0.100

0.050

0.000
0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160

Distance to Duct
(m)

Static Head Dynamic Head Calculated Total Head Measured Total Head
(m) (m) (m) (m)
Test 2

0.200

0.180

0.160

0.140

0.120
Head

0.100
(m)

0.080

0.060

0.040

0.020

0.000
0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160

Distance to Duct
(m)

Static Head Dynamic Head Calculated Total Head Measured Total Head
(m) (m) (m) (m)
Test 3

0.200

0.180

0.160

0.140

0.120
Head

0.100
(m)

0.080

0.060

0.040

0.020

0.000
0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160

Distance to Duct
(m)

Static Head Dynamic Head Calculated Total Head Measured Total Head
(m) (m) (m) (m)
Test 4

1.000

0.900

0.800

0.700

0.600
Head

0.500
(m)

0.400

0.300

0.200

0.100

0.000
0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160

Distance to Duct
(m)

Static Head Dynamic Head Calculated Total Head Measured Total Head
(m) (m) (m) (m)
Test 5

1.000

0.900

0.800

0.700

0.600
Head

0.500
(m)

0.400

0.300

0.200

0.100

0.000
0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160

Distance to Duct
(m)

Static Head Dynamic Head Calculated Total Head Measured Total Head
(m) (m) (m) (m)
Test 6

1.000

0.900

0.800

0.700

0.600
Head

0.500
(m)

0.400

0.300

0.200

0.100

0.000
0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160

Distance to Duct
(m)

Static Head Dynamic Head Calculated Total Head Column J


(m) (m) (m)