BOR LOG BO1
P0
COCHI
N
CLIENT MBITS PROJECT NAME PO2 PROJECT NUMBER PO2
DATE STARTED 8/16/14 GROUND ELEVATION 0 m MSL HOLE SIZE 70 mm
COMPLETED 8/19/14
AT TIME OF DRILLING --
DRILLING METHOD ROTARY DRILLING AT END OF DRILLING 0.00 ft / Elev 0.00 ft approx. 0.3m below GL
GROUND WATER LEVELS: AFTER DRILLING --
SPT N VALUE
20 40 60 80
PL MC LL
MATERIAL DESCRIPTION
20 40 60 80
FINES CONTENT (%)
0.0 20 40 60 80
Ordinary soil
Clayey soil
SPT 1-0-0
1 (0)
Sandy clay
SPT 1-1-1
14
2 (2)
2.5
SPT 1-1-1
16
3 (2)
Medium sand(Gray)
SPT 3-2-4
19
4 (6)
5.0
SPT 3-8-8
22
5 (16)
7.5 SPT 6-8-14
15
6 (22)
SPT 5-9-15
18
7 (24)
10.0
Clay with light sand
SPT 2-3-4
35