Bor Log Bo1: Client Project Name Project Number

The document provides a bore log for a drilling project. It was drilled between August 16-19, 2014 with a 70mm hole size. Standard Penetration Tests were conducted at intervals down to 10 meters depth. The materials encountered included clayey soil, sandy clay, medium gray sand, and clay with light sand. Groundwater levels were not recorded.

Uploaded by

Dileep K Nambiar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views1 page

Bor Log Bo1: Client Project Name Project Number

The document provides a bore log for a drilling project. It was drilled between August 16-19, 2014 with a 70mm hole size. Standard Penetration Tests were conducted at intervals down to 10 meters depth. The materials encountered included clayey soil, sandy clay, medium gray sand, and clay with light sand. Groundwater levels were not recorded.

Uploaded by

Dileep K Nambiar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BOR LOG BO1

P0
COCHI
N

CLIENT MBITS PROJECT NAME PO2 PROJECT NUMBER PO2

DATE STARTED 8/16/14 GROUND ELEVATION 0 m MSL HOLE SIZE 70 mm

COMPLETED 8/19/14
AT TIME OF DRILLING --
DRILLING METHOD ROTARY DRILLING AT END OF DRILLING 0.00 ft / Elev 0.00 ft approx. 0.3m below GL
GROUND WATER LEVELS: AFTER DRILLING --

SPT N VALUE
20 40 60 80
PL MC LL
MATERIAL DESCRIPTION
20 40 60 80
FINES CONTENT (%)
0.0 20 40 60 80
Ordinary soil

Clayey soil
SPT 1-0-0
1 (0)

Sandy clay
SPT 1-1-1
14
2 (2)
2.5

SPT 1-1-1
16
3 (2)

Medium sand(Gray)

SPT 3-2-4
19
4 (6)
5.0

SPT 3-8-8
22
5 (16)

7.5 SPT 6-8-14


15
6 (22)

SPT 5-9-15
18
7 (24)

10.0

Clay with light sand


SPT 2-3-4

35