Rencana Anggaran Biaya (Rab) Pelaksanaan Kegiatan Fisik 100 % Jenis Kegiatan Besar Bantuan Lokasi Sumber Dana

The document is a budget plan for building a waste processing facility. It includes a list of materials, their quantities, unit prices, and total costs. The total budget is Rp. 32,016,000. It will be constructed at Kp. Cisaladah RW.05 using funds from the 2020 Raksa Desa program. The facility will measure 4 meters by 6 meters.

Uploaded by

ricky torres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views8 pages

Rencana Anggaran Biaya (Rab) Pelaksanaan Kegiatan Fisik 100 % Jenis Kegiatan Besar Bantuan Lokasi Sumber Dana

The document is a budget plan for building a waste processing facility. It includes a list of materials, their quantities, unit prices, and total costs. The total budget is Rp. 32,016,000. It will be constructed at Kp. Cisaladah RW.05 using funds from the 2020 Raksa Desa program. The facility will measure 4 meters by 6 meters.

Uploaded by

ricky torres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

RENCANA ANGGARAN BIAYA (RAB )

PELAKSANAAN KEGIATAN FISIK 100 %

Jenis Kegiatan : Pemb. Bangunan Tempat Pengolahan Sampah


Volume : 1 Unit Besar Bantuan : Rp. 32.016.000
Lokasi : Kp. Cisaladah RW.05
Sumber Dana : Raksa Desa Tahun 2020
Volume : 4 x 6 m' (1 unit)

Harga Satuan
No. URAIAN Volume Satuan RAKSA DESA ( Rp )
( Rp )

1 Belanja Barang
1 Prasasti Kegiatan 1.0 Bh Rp 450,000 Rp 450,000
2 Papan Proyek 1.0 Bh Rp 250,000 Rp 250,000
3 Ember 3.0 Bh Rp 15,000 Rp 45,000
4 Benang 3.0 Bh Rp 15,000 Rp 45,000
5 Sekop 1.0 Bh Rp 85,000 Rp 85,000
6 Ayakan Pasir 1.0 Bh Rp 80,000 Rp 80,000
7 Alat Pembakaran Sampah 1.0 Unit Rp 7,500,000 Rp 7,500,000
8 Roll cat 2.0 Bh Rp 20,000 Rp 40,000
Sub Total (1) Rp 8,495,000

2 Biaya Perencanaan dan Pelaporan


1 Survay 1.0 ls Rp 300,000 Rp 300,000
2 Pembuatan Desain 1.0 ls Rp 300,000 Rp 300,000
3 Pembuatan RAB 1.0 ls Rp 300,000 Rp 300,000
4 ATK 1.0 ls Rp 200,000 Rp 200,000
5 Dokumentasi 1.0 ls Rp 200,000 Rp 200,000
6 Transport TPKD 5.0 Org Rp 150,000 Rp 750,000

Sub Total (2) Rp 2,050,000

3 Belanja Modal
1 Semen Portland 35.00 Zak Rp 70,000 Rp 2,450,000
2 Pasir pasang 7.00 M3 Rp 250,000 Rp 1,750,000
3 Pasir urug 3.00 M3 Rp 200,000 Rp 600,000
4 kayu 5/10 1.00 M3 Rp 1,500,000 Rp 1,500,000
5 Balok Kayu 10/10 1.00 M3 Rp 1,500,000 Rp 1,500,000
6 Papan kayu 3/20 1.00 M3 Rp 1,500,000 Rp 1,500,000
7 Bata merah 2,500 Buah Rp 800 Rp 2,000,000
8 Asbes 180/80 40.00 lembar Rp 65,000 Rp 2,600,000
9 GRC Board 120 x 240 10.00 lembar Rp 85,000 Rp 850,000
10 Warmes 2.00 lembar Rp 535,500 Rp 1,071,000
11 Pintu 2.00 Buah Rp 500,000 Rp 1,000,000
12 Kaca 1.00 m2 Rp 50,000 Rp 50,000
13 Paku 5 3.00 Kg Rp 25,000 Rp 75,000
14 Paku 7 5.00 Kg Rp 25,000 Rp 125,000
15 Kunci tanam 2.00 Buah Rp 190,000 Rp 380,000
16 Engsel pintu 4.00 Buah Rp 25,000 Rp 100,000
17 Engsel jendela 2.00 Buah Rp 15,000 Rp 30,000
18 Kait angin 1.00 Buah Rp 15,500 Rp 15,500
19 Kunci selot 5.00 Buah Rp 6,500 Rp 32,500
20 Cat Kayu 5.00 Kg Rp 60,000 Rp 300,000
21 Cat Tembok 26.00 Kg Rp 35,000 Rp 910,000
22 Daun jendela 1.00 Buah Rp 200,000 Rp 200,000
23 Instalasi Listrik 1.00 Paket Rp 1,500,000 Rp 1,500,000
24 Kabel NYM 40.00 M' Rp 15,000 Rp 600,000
25 Lampu Neon 20 Watt 4.00 Buah Rp 38,000 Rp 152,000
26 Dudukan Lampu 4.00 Buah Rp 15,000 Rp 60,000
27 Saklar Tunggal 4.00 Buah Rp 15,000 Rp 60,000
28 Stop kontak 4.00 Buah Rp 15,000 Rp 60,000
Rp -
Sub Total (3 ) Rp 21,471,000
JUMLAH TOTAL Rp 32,016,000
-
Nagrog, 02 Februari 2020
Disetujui/Mengesahkan :
Kepala Desa Cicalengka Wetan Pelaksana Kegiatan

NANANG SUTRISNA, S.E RISNA RISNANDAR

Mengetahui/Menyetujui,
Tim Teknis Program Raksa Desa

ALIT ABDURACHMAN, ST
NIP. 19700606 199601 1 001
RENCANA ANGGARAN SWADAYA MASYARAKAT

Kegiatan : Bantuan Keuangan Program Raksa Desa T.A 2020


Jenis : Pembangunan Tempat Pengolahan Sampah
Volume :4m x6m
Lokasi : Kp.Cihantap RW.13
Besar Bantuan : Rp. 6,040,000

NO URAIAN VOLUME HARGA SATUAN JUMLAH


(Rp) (Rp)
1 2 3 4 5
1 BAHAN
a. Semen 2 zak 70,000 140,000

JUMLAH BAHAN 140,000

2 KONSUMSI
Makan dan Minum 10 hari 100,000 1,000,000

JUMLAH MAKAN MINUM 1,000,000

3 ONGKOS KERJA
b. Tukang 14 HOK 130,000 1,820,000
c. Pekerja 28 HOK 110,000 3,080,000

JUMLAH ONGKOS KERJA 4,900,000

6 Jumlah Swadaya 6,040,000

Nagrog, 02 Februari 2020


Disetujui/Mengesahkan :
Kepala Desa Nagrog Pelaksana Kegiatan

GUN GUN SUGANDA, S.Pd.I DEDI ZARKASIH

Mengetahui/Menyetujui,
Tim Teknis Program Raksa Desa
ALIT ABDURACHMAN, ST
NIP. 19700606 199601 1 001
RENCANA ANGGARAN BIAYA
BANTUAN INFRASTRUKTUR RAKSA DESA
DESA NAGROG KECAMATAN CICALENGKA
TAHUN ANGGARAN 2019

No.RAB : 37
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pembangunan Septictank bersama di RW.06
Waktu Pelaksanaan : 10 Hari
Lokasi : RW.06 Ciseupang
Volume :3mx3mx3m

Harga Satuan JUMLAH TOTAL


No. URAIAN Volume Satuan (Rp)
( Rp )

1 Belanja Barang
1 Prasasti Kegiatan 1.0 Bh Rp 450,000 Rp 450,000 Rp 450,000
2 Papan Proyek 1.0 Bh Rp 250,000 Rp 250,000 Rp 250,000
3 Ember kecil 4.0 Bh Rp 15,000 Rp 30,000 Rp 30,000
4 Ember Besar 6.0 Bh Rp 25,000 Rp 50,000 Rp 50,000
5 Benang 1.0 Bh Rp 11,000 Rp 11,000 Rp 11,000
6 Sekop 2.0 Bh Rp 85,000 Rp 85,000 Rp 85,000
7 Cangkul 5.0 Bh Rp 125,000 Rp 625,000 Rp 625,000
8 Ayakan Pasir 1.0 Bh Rp 80,000 Rp 80,000 Rp 80,000
Sub Total (1) Rp 1,581,000

2 Biaya Pencanaan dan Pelaporan


1 Survay 1.0 ls Rp 200,000 Rp 200,000 Rp 200,000
2 Pembuatan Desain 1.0 ls Rp 220,000 Rp 220,000 Rp 220,000
3 Pembuatan RAB 1.0 ls Rp 200,000 Rp 200,000 Rp 200,000
4 ATK 1.0 ls Rp 120,000 Rp 120,000 Rp 120,000
5 Dokumentasi 1.0 ls Rp 90,000 Rp 90,000 Rp 90,000
6 Transport TPKD 5.0 Org Rp 85,000 Rp 425,000 Rp 425,000

Sub Total (2) Rp 1,255,000

3 Belanja Modal
1 Semen Portland 30.00 Zak Rp 70,000 Rp 2,100,000 Rp 2,100,000
2 Batu belah 5.00 M3 Rp 250,000 Rp 1,250,000 Rp 1,250,000
3 Batu Resapan 4.00 M3 Rp 225,000 Rp 900,000 Rp 900,000
4 Pasir pasang 10.00 M3 Rp 250,000 Rp 2,500,000 Rp 2,500,000
5 Pasir cor 3.00 M3 Rp 300,000 Rp 900,000 Rp 900,000
6 Batu Split 2.00 M3 Rp 200,000 Rp 400,000 Rp 400,000
7 Urugan Kerikil 3,5 cm 2.10 M3 Rp 200,000 Rp 420,000 Rp 420,000
9 Papan kayu 3/20 0.50 M3 Rp 1,800,000 Rp 900,000 Rp 900,000
10 Bata merah 1,200 biji Rp 800 Rp 960,000 Rp 960,000
11 Paku 7 2.00 Kg Rp 20,000 Rp 40,000 Rp 40,000
12 Besi 10 12.00 btg Rp 103,000 Rp 1,236,000 Rp 1,236,000
13 Besi 6' 8.00 btg Rp 37,000 Rp 296,000 Rp 296,000
14 PIPA PVC - Class AW 4" 20.00 btg Rp 300,000 Rp 6,000,000 Rp 6,000,000
15 Knee PVC (SCJ) 4" 10.00 bh Rp 98,000 Rp 980,000 Rp 980,000
16 Pipa PVC 1" 1.00 bh Rp 22,000 Rp 22,000 Rp 22,000
17 Pas.Injuk 10.80 Kg Rp 25,000 Rp 270,000 Rp 270,000
18 Lem Pralon 1.00 kleng Rp 64,000 Rp 64,000 Rp 64,000

19 wire mesh M8 5.00 Lembar Rp 533,600 Rp 2,668,000 Rp 2,668,000


20 Kawat 5.00 Kg Rp 25,000 Rp 125,000 Rp 125,000

Sub Total (3) Rp 22,031,000 830000 Rp 425,000 Rp 1,581,000 Rp 7,268,000 Rp 3,870,000 Rp 3,827,000 Rp 7,066,000 24,867,000
Jumlah Total Rp 24,867,000
23,362,000
Nagrog, 15 Juli 2019 Rp 1,331,000 830000
Disetujui/Mengesahkan : 425000
Kepala Desa Nagrog Pelaksana Kegiatan 24,617,000
Rp 250,000

GUN GUN SUGANDA, S.Pd.I SULAEMAN

Mengetahui/Menyetujui,
Tim Teknis Program Raksa Desa

ALIT ABDURACHMAN, ST
NIP. 19700606 199601 1 001
RENCANA ANGGARAN SWADAYA MASYARAKAT

Kegiatan : Bantuan Keuangan Program Raksa Desa T.A 2019


Jenis : Pembangunan Septictank Bersama
Volume :3m x3mx3m
Lokasi : Kp.Ciseupang, RW.06
Besar Bantuan : Rp. 5,150,000

NO URAIAN VOLUME HARGA SATUAN JUMLAH


(Rp) (Rp)
1 2 3 4 5
1 BAHAN
a. Semen 2 zak 70,000 140,000
-
JUMLAH BAHAN 140,000

2 KONSUMSI
Makan dan Minum 10 hari 100,000 1,000,000

JUMLAH MAKAN MINUM 1,000,000

3 ONGKOS KERJA
b. Tukang 12 HOK 130,000 1,560,000
c. Pekerja 20 HOK 110,000 2,200,000

JUMLAH ONGKOS KERJA 3,760,000

4 ADMINISTRASI
Pembuatan Proposal &
Pelaporan ls ls 250,000

6 Jumlah Swadaya 5,150,000

Nagrog, 15 Juli 2019


Disetujui/Mengesahkan :
Kepala Desa Nagrog Pelaksana Kegiatan

GUN GUN SUGANDA, S.Pd.I SULAEMAN

Mengetahui/Menyetujui,
Tim Teknis Program Raksa Desa

ALIT ABDURACHMAN, ST
NIP. 19700606 199601 1 001