0% found this document useful (0 votes)
167 views1 page

Project: Non-Conformance Report: Error: Reference Source Not Found

This document appears to be a non-conformance report (NCR) template used for construction projects. The template includes sections for describing the non-conformance, proposed corrective and preventive actions, sign-offs from the contractor and consultant, and distribution. It provides a standardized format for documenting and resolving issues that arise during a construction project.

Uploaded by

g3neps
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
167 views1 page

Project: Non-Conformance Report: Error: Reference Source Not Found

This document appears to be a non-conformance report (NCR) template used for construction projects. The template includes sections for describing the non-conformance, proposed corrective and preventive actions, sign-offs from the contractor and consultant, and distribution. It provides a standardized format for documenting and resolving issues that arise during a construction project.

Uploaded by

g3neps
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Employer: Consultant / Engineer: Contractor:

Error: Reference source not found

PROJECT :
NON-CONFORMANCE REPORT
From: NCR NO:
To: Date:
Non-Conformance details: Area:

Signature: Date:
Proposed corrective & Preventive action:

For Main Contractor: Date:


Comments:

Received by Main Contractor:


For Consultant Date: Date:
NCR Close out:

Main Contractor: Date: Consultant: Date:


Distribution:

You might also like