INITIAL SCREENING
FOR
TANK CLEANING, REPAIR & PAINTING
SERVICES
GENERAL BID SLATE
Contents:
1. Information for Contractors
2. Initial Screening Questionnaire
-1-
Tank Cleaning, Repair & Painting Services
Pre-Qualification Questionnaire
INFORMATION FOR CONTRACTORS
The Saudi Arabian Oil Company (Saudi Aramco) hereby solicits initial screening for the work
described below.
Title: General Bid Slate for Tank Cleaning, Repair & Painting Services
Location of Work: Kingdom of Saudi Arabia
Brief Description of Work:
The work to be performed under this work type shall be for, Tank Cleaning, Repair & Painting
Services as requested by Saudi Aramco. The work shall include but not limited to:
1. Removal of sludge from tanks
2. Hydrojetting of tank internals for inspection of internals, shell and coating
3. Mechanical repairs of tanks
4. Hydro-test where necessary
5. Removal and replacement of anodes and associated brackets and fixings
6. Tank internal and external abrasive blasting
7. Tank internal and external coating
8. Provision of all required internal and external scaffolding
9. Scaffolding Inspection.
Pre-qualification Requirements:
Interested contractors that can demonstrate successful and verifiable contract experience and
capabilities in this type of work are requested to complete the initial screening questionnaire
(Exhibit A,B, and C) and submit it in a PDF format via email to the below Contracting
Department Representative:
Name: Zainab Alkhalas
Email: Zainab.Alkhalas@aramco.com
Tel: 013-874-1156
To be considered, contractor must have sufficient specialized experience in this type of
work and adequate numbers of qualified manpower and equipment.
A Saudi Aramco Pre-qualification Evaluation Team will evaluate all submittals fairly and in
accordance with the applicable evaluation criteria. This will include verification of contractor
information and visits to contractor work sites.
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
-2-
Tank Cleaning, Repair & Painting Services
Pre-Qualification Questionnaire
EXHIBIT "A"
WORK EXPERIENCE
Please list down the tank cleaning, repair and painting contracts that you have completed with
oil/gas or chemical companies within the past 5 years (you can list both completed and ongoing
projects whether you are the primary or sub-contractor). Please list only contracts that are
directly related to the scope of work of this General Bid Slate as detailed in the description of
work earlier.
Start of Client Name/
Prime
Contract Contact
Contractor End of
Contra Contract Brief Work Value (year) Person Info.
or Contract
ct No. Title Description (SAR MM) “Business e-
Subcontract (year)
mail/ phone
or
no.”
Service, Sand Blasting, 267,708.00 21-05-18 08-10-18 Saudi Electricity
Repair/Servic
Painting and Leak SAR Company,
1 e and Prime
repairing work of Qurayah KSA
Maintenance
Diesel Storage Tank
118,000.00 09.04.2017 16.07.2017 Babcock Borsig,
2 SAR Saudi Arabia
10
EXHIBIT "B"
MANPOWER RESOURCES
Please fill in the below table with your current manpower resources
Saudi Aramco: Company General Use
-3-
Tank Cleaning, Repair & Painting Services
Pre-Qualification Questionnaire
Number
No. Manpower Category Presently
Employed
1. Operation Manager
2. Certified Safety Officer
3. Planner / Scheduler
4. Multi-Craft Foreman
Certified Welder, Pipe & Structural (Carbon
5.
Steel)
Certified Welder, Pipe & Structural (Stainless
6.
Steel)
7. Pipefitter/ Fabricator/ Metalsman
8. Certified Coating Applicator
9. Certified Abrasive Blaster
10. Certified Hydrojetting Operator
11. Certified Rigger II
TOTAL
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
-4-
Tank Cleaning, Repair & Painting Services
Pre-Qualification Questionnaire
EXHIBIT "C"
EQUIPMENT
Please fill in the below table with your current equipment resources
No. Equipment Type Number
1. Welding Machine (400 amp)
2. Oxy-acetylene cutting set
3. Arc gouging equipment
Abrasive blasting machine (including pot, nozzle hoses
4.
& attachments) complete (5,000 to 10,000 psi)
Airless spray painting unit (including hoses, filter/air
5.
drying units & attachments) complete
6. Air Compressor (750 cfm)
Hydrojetting unit, Truck mounted with all necessary
7. accessories & attachments. Pressure & fitted with
automatic shut-off valve. (5,000 to 10,000 psi)
8. Vacuum Tanker (4,000 US Gallon)
TOTAL
Saudi Aramco: Company General Use
-5-