Construction Cost Calculation
Builtup Area
70000ft 2
Approx Cost Per Square Feet
Rs2200.
Calculation of Cost | Approx amount of cost for given construction
is 1540,00,000.00 Rs.
Approximate cost on various work of material as per thumb rule
Cement (16.4 %)252,56,000.00 Rs.
Sand (12.3 %)189,42,000.00 Rs.
Aggregate (7.4 %)113,96,000.00 Rs.
Steel (24.6 %)378,84,000.00 Rs.
Finishers(16.5%)254,10,000.00Rs.
(Paint (4.1 %) + Tiles (8.0 %) + Bricks (4.4 %))
Fittings(22.8%) 351,12,000.00 Rs.
(Window (3.0 %) + Doors (3.4 %) + Plumbing (5.5 %) + Eletrical (6.8 %) + Sanitary (4.1 %))
TOTAL COST1540,00,000.00 Rs.
To complete this construction in 18
monthstimeline money required is as below
Quantity of material required for given construction area
Quantity of material required for 70000ft2
Cement28000.00 Bags
Sand57120.00 Ton
Aggregate 42560.00 Ton
Steel280000.00Ton
Paint12600.00lt
Bricks560000.00Pcs.
Flooring 91000.00 ft
Approximate cost on various work of material to complete
the construction
for 70000 ft2
Total Cost
=Builtup area×Approx cost per sq. ft.=Builtup area×Approx cost per sq. ft.
=70000×2200=70000×2200
=154000000.00 Rs.=154000000.00 Rs.
Amount of Cement Required
=Builtup area×0.4=Builtup area×0.4
=70000×0.4=70000×0.4
=28000.00 Bags=28000.00 Bags
Cement Amount
=16.4100×Total cost=16.4100×Total cost
=16.4100×154000000.00=16.4100×154000000.00
=25256000.00 Rs.=25256000.00 Rs.
Note: Amount of cement required per 1 ft2 = 0.4 bags & 16.4%
Amount of Sand Required
=Builtup area×0.816=Builtup area×0.816
=70000×0.816=70000×0.816
=57120.00 Ton=57120.00 Ton
Sand Amount
=12.3100×Total cost=12.3100×Total cost
=12.3100×154000000.00=12.3100×154000000.00
=18942000.00 Rs.=18942000.00 Rs.
Note: Amount of sand required per 1 ft2 = 0.816 ton & 12.3%
Amount of Aggregate Required
=Builtup area×0.608=Builtup area×0.608
=70000×0.608=70000×0.608
=42560.00 Ton=42560.00 Ton
Aggregate Amount
=7.4100×Total cost=7.4100×Total cost
=7.4100×154000000.00=7.4100×154000000.00
=11396000.00 Rs.=11396000.00 Rs.
Note: Amount of aggregate required per 1 ft2 = 0.608 ton & 7.4%
Amount of Steel Required
=Builtup area×4=Builtup area×4
=70000×4=70000×4
=280000.00 Ton=280000.00 Ton
Aggregate Amount
=24.6100×Total cost=24.6100×Total cost
=24.6100×154000000.00=24.6100×154000000.00
=37884000.00 Rs.=37884000.00 Rs.
Note: Amount of steel required per 1 ft2 = 4 ton & 24.6%
Amount of Paint Required
=Builtup area×0.18=Builtup area×0.18
=70000×0.18=70000×0.18
=12600.00 lt=12600.00 lt
Note: Amount of paint required per 1 ft2 = 0.18 lt. & 4.1%
Amount of Paint Required
=Builtup area×8=Builtup area×8
=70000×8=70000×8
=560000.00 Pcs.=560000.00 Pcs.
Flooring
=Builtup area×1.3=Builtup area×1.3
=70000×1.3=70000×1.3
=91000.00 Sq. ft.=91000.00 Sq. ft.
Finishers
=16.5100×Total cost=16.5100×Total cost
=16.5100×154000000.00=16.5100×154000000.00
=25410000.00 Rs.=25410000.00 Rs.
Note: Paint (4.1 %), Tiles (8.0 %), Paint (4.4 %)
Fittings
=22.8100×Total cost=22.8100×Total cost
=22.8100×154000000.00=22.8100×154000000.00
=35112000.00 Rs.=35112000.00 Rs.
Note: Window (3.0 %), Doors (3.4 %), Plumbing (5.5 %), Eletrical (6.8 %), Sanitary (4.1 %)
Construction Cost Estimator Calculator
Thumb rule for calculation; Average cost of construting a resedential ternament region may very from Rs.
800/Sq. ft. - Rs. 2,500/Sq. ft. depending open quality of material.
This cost includes entire cost of labour and material from excavation to fitting of doors and window with
eletrical wiring and plumbing cost.
This cost excludes eletrical and plumbing accessories, any cost of painting other than whitewashing and
furniture works.
So, by above thumb rule Approx Cost of Construction of Midium Specification = 1000 * 900 = Rs.
9,00,000 Where, 1000 is builtup area and 900 is As per thumb rule assumed value.
Condition: Actual cost depends upon structure and architectural drawing and actual site condition
Further more to get an approximat estimat of various quantities required for 1000 sq. ft. built-up area we
can use following thumb rule.
Thumb Rule of Quantities of Material for 1000 sq. ft.
Cement = 400 bags
Sand = 51 Cubic meter or 81,600 kg. or 81.6 Ton (Assume density = 1600 kg/m 3)
Aggregate = 38 Cubic meter or 60,800 kg. or 60.8 Ton (Assumption density = 1600 kg/m 3)
Steel = 4 kg/sq. ft. = 4000 kg/1000 sq. ft.
Paint = 180 lt.
Bricks = 8 Bricks/sq. ft. = 8000 Bricks/1000 sq. ft.
Flooring = 1300 sq. ft. = 325 No. of Tiles
Condition: Actual quantities depend upon architecture and structural drawings.
Thumb rule are derived from observing more than 500 construction costs of input have been taken
from various reference matrerials.
Further more approximat cost on various work or material is as below as per thumb rule.
Total Cost = 9,00,000 Materials,
Cement = 16.4% = 1,47,600 Rs.
Sand = 12.3% = 1,10,700 Rs.
Aggregate = 7.4% = 66,600 Rs.
Steel = 24.6% = 2,21,400 Rs.
Finishers=16.5%=1,48,500Rs.
(Paint = 4.1% + Tiles = 8.0% + Bricks = 4.4%)
Fittings=22.8%=2,05,200Rs.
(Window = 3%, Doors = 3.4%, Plumbing = 5.5%, Eletrical = 6.8%, Sanitary = 4.1%)
Total Cost = 9,00,000 Rs. / 1000 sq. ft. Construction area