The document outlines the tasks, resources, durations, and schedule for a conveyor belt project. It includes 27 separate tasks related to hardware development, operating system development, drivers, utilities, and system integration. Tasks will be performed by various resources including design, development, documentation, assembly/test, and purchasing teams. All tasks are scheduled to begin on October 1, 2020 and estimated to take 1 day to complete.

Uploaded by

Hafiz Rashid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views2 pages

Part 1 WBS

The document outlines the tasks, resources, durations, and schedule for a conveyor belt project. It includes 27 separate tasks related to hardware development, operating system development, drivers, utilities, and system integration. Tasks will be performed by various resources including design, development, documentation, assembly/test, and purchasing teams. All tasks are scheduled to begin on October 1, 2020 and estimated to take 1 day to complete.

Uploaded by

Hafiz Rashid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Task Name Resource Names Duration Start Oct 4 '20

W T F S S M T W T
1 Conveyor Belt Project 1 day? Thu 10/1/20 8:00 AM
2 Hardware Development,Design 1 day? Thu 10/1/20 8:00 AM
3 Hardware Design Design,Development 1 day? Thu 10/1/20 8:00 AM Design,Development
4 Hardware documentation Design,Documentation 1 day? Thu 10/1/20 8:00 AM Design,Documentation
5 Prototypes Assembly/Test,Development 1 day? Thu 10/1/20 8:00 AM Assembly/Test,Development
6 Order circuit boards Purchasing 1 day? Thu 10/1/20 8:00 AM Purchasing
7 Assemble proproduction Models Assembly/Test,Development 1 day? Thu 10/1/20 8:00 AM Assembly/Test,Development
8 Operating System 1 day? Thu 10/1/20 8:00 AM
9 Kernel specifications 1 day? Thu 10/1/20 8:00 AM
10 Drivers 1 day? Thu 10/1/20 8:00 AM
11 Disk drivers Assembly/Test,Development 1 day? Thu 10/1/20 8:00 AM Assembly/Test,Development
12 Serial 1/0 drivers Development 1 day? Thu 10/1/20 8:00 AM Development
13 Memory management Development 1 day? Thu 10/1/20 8:00 AM Development
14 Operating system documentation Design,Documentation 1 day? Thu 10/1/20 8:00 AM Design,Documentation
15 Network Interface Development 1 day? Thu 10/1/20 8:00 AM Development
16 Utilities 1 day? Thu 10/1/20 8:00 AM
17 Utilities Specifications Development,Design 1 day? Thu 10/1/20 8:00 AM Development,Design
18 Routine utilities Development 1 day? Thu 10/1/20 8:00 AM Development
19 Complex utilities Development 1 day? Thu 10/1/20 8:00 AM Development
20 Utilities documentation Design,Documentation 1 day? Thu 10/1/20 8:00 AM Design,Documentation
21 Shell Development 1 day? Thu 10/1/20 8:00 AM Development
22 System Integration 1 day? Thu 10/1/20 8:00 AM
23 Architectural decisions Design 1 day? Thu 10/1/20 8:00 AM Design
24 Integration first phase Assembly/Test,Development 1 day? Thu 10/1/20 8:00 AM Assembly/Test,Development
25 System hard/software test Assembly/Test 1 day? Thu 10/1/20 8:00 AM Assembly/Test
26 Project documentation Documentation,Development 1 day? Thu 10/1/20 8:00 AM Documentation,Development
27 Integration aaceptance testing Assembly/Test,Development 1 day? Thu 10/1/20 8:00 AM Assembly/Test,Development
Task Inactive Summary External Tasks

Split Manual Task External Milestone

Milestone Duration-only Deadline

Summary Manual Summary Rollup Progress

Project Summary Manual Summary Manual Progress

Inactive Task Start-only

Inactive Milestone Finish-only

You might also like