India is the world's sixth largest energy consumer accounting for about 3.5% of the world's
total annual energy consumption. The thermal, hydro and nuclear energy are the major
sources of generation of electricity in India.
The Ministry has several undertakings/ organizations operating under it. They may be
classified as follows:-
Statutory bodies which include:-
    Central Electricity Authority- is an attached office of the Ministry and assists it in
     all technical matters. CEA is responsible for overall planning and technical
     coordination as well as supervision of standard programmes of entire electricity
     sector of the country. It specifies the technical and safety requirements for
     construction, operation and maintenance of electrical standards and electrical lines.
     It is also involved in formulating the 'National Electricity Plan' in accordance with the
     National Electricity policy', once in five years.
    Central Electricity Regulatory Commission - has been constituted in order to:-
     (i) regulate the tariff of generating companies owned or controlled by the Central
     Government; (ii) regulate the tariff of generating companies other than those owned
     or controlled by the Central Government, if such generating companies enter into or
     otherwise have a composite scheme for generation and sale of electricity in more
     than one State; (iii) regulate the inter-State transmission of energy including tariff of
     the transmission utilities; (iv) grant licences for inter-State transmission and trading;
     and (v) advise the Central Government in formulation of National electricity policy
     and tariff policy.
    State Electricity Regulatory Commission - have been constituted in order to:- (i)
     determine the tariff for generation, supply, transmission and wheeling of electricity,
     whole sale, bulk or retail sale within the State; (ii) issue licences for intra-State
     transmission, distribution and trading; and (iii) promote generation of electricity from
     renewal sources of energy etc.
    Appellate Tribunal for Electricity - has been constituted for the purpose of
     hearing cases against the orders of the Regulatory Commissions and the
     Adjudicating officer.
    Damodar valley corporation- is the first multi-purpose river valley project of the
     Government, set up for the unified development of Damodar Valley region spread
     over the States of West Bengal and Jharkhand. Its objectives are:- (i) flood control
     and irrigation; (ii) water supply and drainage; (iii) generation, transmission and
     distribution of electrical energy; (iv) afforestation and control of soil erosion; and (v)
     promotion of industrial, economic and general well-being of the people.
    Bhakra Beas Management Board - has been constituted for the administration,
     maintenance and operation of Bhakra Nangal Project. It manages the facilities
     created for harnessing the waters impounded at Bhakra and Pong in addition to
     those diverted at Pandoh through the BSL Water Conductor System. It has also been
     assigned the responsibility of delivering water and power to the beneficiary States in
     accordance with their due/ entitled shares.
Public Sector Undertakings, which include:-
   Power Grid Corporation of India Ltd. (POWERGRID) - is the Central
    transmission utility of India which possesses one of the largest transmission network
    in the world. It has been set up with the mandate 'to establish and operate Regional
    and National Power Grids to facilitate transfer of power within and across the regions
    with reliability, security and economy on sound commercial principles'. It is
    responsible for all the existing and future transmission projects in the Central sector.
   National Thermal power corporation- is the largest thermal power generating
    company of India and has been identified as one of the Navratnas. It has been set up
    with the objective of planning, promoting and organizing an integrated development
    of thermal power in the country.
   National Hydro-Electric Power Corporation - has been set up in order to
    harness the vast hydro, tidal and wind potential of the country to produce cheap/
    pollution-free and inexhaustible power. It covers all aspects such as investigation,
    planning, designs, construction, operation and maintenance of hydroelectric, tidal
    and wind power projects.
   North Eastern Electric Power Corporation limited - has been set up with the
    objective of developing the large power potential of the North Eastern (NE) region of
    the country by installing hydro and thermal power plants so as to ensure optimum
    utilization of commissioned generation projects. It aims to plan, design, operate and
    maintain power stations in the NE region.
   Rural Electrification Corporation - has been set up with the objective of financing
    and promoting rural electrification projects all over the country. The projects cover
    electrification of villages, including tribal villages and Dalit Bastis, energisation of
    pump sets, provision of power for small, agro-based and rural industries, lighting of
    rural households and street lighting. REC provides financial assistance to State
    Electricity Boards, State Government Departments and Rural Electric Cooperatives.
   Power Finance Corporation (PFC) - function as the prime development financial
    institution dedicated to the growth and overall development of the power sector. It
    provides financial assistance/ services for power projects in the form of project term
    loan, lease financing, direct discounting of bills, short term loan, consultancy
    services, etc.
   Neyveli Lignite Corporation Limited: Neyveli Lignite Corporation Limited is
    a Central Public Sector Undertaking engaged in lignite mining and power
    generation
Autonomous Bodies, which include:-
   Central power research laboratory - serve as a National Laboratory for
    undertaking applied research in electric power engineering, besides functioning as
    an independent National Testing and Certification Authority for electrical equipment
    and components so as to ensure reliability and develop new products.
   National power training Institute - functions as the National Apex body for the
    human resource development of the power sector personnel in India. Its headquarter
    is located in Faridabad (Haryana). It operates on all India basis through its five
    Regional Power Training Institutes located at Neyveli (Tamil Nadu), Durgapur (West
    Bengal), Badarpur (New Delhi), Nagpur (Maharashtra) and Guwahati (Assam). They
    are fully equipped with the latest state-of-the-art training infrastructure and having
    expert faculties with long years of professional and teaching background.
   Bureau of energy efficiency - has been set up to develop policies and strategies
    within the overall framework of Energy Conservation Act 2001. It aims to promote
    energy saving measures and in turn reduce energy intensity (i.e. energy consumed
    per unit product/services, practice and procedure) of Indian economy.
Joint Venture Corporations, which include:-
   Satluj jal vidyut nigam limited - is a joint venture of the Government of India and
    the Government of Himachal Pradesh, set up with the objective to plan, promote,
    organize and execute hydro-electric power projects in the Satluj river basin in the
    Himachal Pradesh.
   Tehri Hydro Development Corporation (THDC) - is a joint venture of
    Government of India and Government of Uttar Pradesh, set up with the objective to
    plan, promote, organize, execute, operate and maintain hydro power projects in
    Bhagirathi- Bhilangna Valley in Uttar Pradesh.
                              Installed Capacity
      Sector                 MW             %age
      State Sector           82,026.05      52.5
      Central Sector         51,867.63      34.0
      Private Sector         33,183.68      13.5
      Total                  1,67,077.36
Fuel Wise break up
         Fuel                                      MW            %age
         Total Thermal                             108362.98     64.6
                                     Coal          89,778.38     53.3
                                     Gas           17,384.85     10.5
                                     Oil           1,199.75      0.9
         Hydro (Renewable)                         37,367.40     24.7
         Nuclear                                   4,560.00      2.9
         RES** (MNRE)                              16,786.98     7.7
         Total                                     1,67,077.36
                                                          As on 30/11/12
**Renewable Energy Sources (RES) include SHP, BG, BP, U&I and Wind Energy
SHP= Small Hydro Project, BG= Biomass Gasifier, BP= Biomass Power,
U & I=Urban & Industrial Waste Power, RES=Renewable Energy Sources
The installed capacity figures as on 30.06.2010 in respect of RES is based on statement
dated 02.11.10 from Ministry of Renewable Energy (MNRE) where cumulative Grid
interactive power installed capacity has been indicated as 17174.60 MW. Reconciliation of
installed capacity of Hydro capacity resulted in transfer of 135 MW from conventional to
SHP-RES and retrieval of installed capacity of 67.20 from SHP-RES to conventional Hydro
has resulted in net addition of 67.8 MW to SHP under RES. Also 30 MW of capacity in the
nature of Waste Heat Recovery Power Plant at Goa Energy Private Limited under U&I
category of RES Out of this installed capacity due to wind - (374.636 MW) and small hydro
(110.79 MW) appearing in captive capacity has been deducted to arrive at installed
capacity of utilities in respect of RES.(17174.60-485.43+67.8+30=16786.98)
GENERATION INSTALLED CAPACITY (MW) OF POWER UTILITIES IN STATES/UTS
                                                                                         As on
30/11/12
State/UT                      MODE WISE BREAKUP
(Utilities)             THERMAL            NUCLEAR        HYDRO RES            TOTAL
               COAL     GAS   DIESEL TOTAL                (Renewable) (MNRE)
STATE SECTOR
A & N ISLAND  0.00      0.00     40.05   40.05     0.00   0.00      5.25       45.30
ANDHRA PRADESH4382.50   0.00     0.00    4382.50   0.00   3695.53   190.83     8268.86
ARUNACHAL PRD.0.00      0.00     15.88   15.88     0.00   0.00      78.55      94.43
ASSAM         60.00     239.00   20.69   319.69    0.00   100.00    27.11      446.80
BIHAR         530.00    0.00     0.00    530.00    0.00   0.00      54.60      584.60
CHANDIGARH    0.00      0.00     0.00    0.00      0.00   0.00      0.00       0.00
CHHATISGARH   2060.00   0.00     0.00    2060.00   0.00   120.00    19.05      2199.05
D & N HAVELI  0.00      0.00     0.00    0.00      0.00   0.00      0.00       0.00
DAMAN & DIU   0.00      0.00     0.00    0.00      0.00   0.00      0.00       0.00
DELHI         385.00    800.40   0.00    1185.40   0.00   0.00      0.00       1185.40
GOA           0.00      0.00     0.00    0.00      0.00   0.00      0.05       0.05
GUJARAT       4440.00   892.72   17.28   5350.00   0.00   772.00    29.90      6151.90
HARYANA       3410.00   25.00    3.92    3438.92   0.00   884.51    70.10      4393.53
HIMACHAL PRD. 0.00         0.00      0.13     0.13       0.00      393.60    337.82     731.55
JAMMU & KASHMI0.00         175.00    8.94     183.94     0.00      780.00    129.33     1093.27
JHARKHAND     1190.00      0.00      0.00     1190.00    0.00      130.00    4.05       1324.05
KARNATAKA     2220.00      0.00      127.92   2347.92    0.00      3599.80   594.55     6542.27
KERALA        0.00         0.00      234.60   234.60     0.00      1881.50   142.83     2258.93
LAKSHADWEEP   0.00         0.00      9.97     9.97       0.00      0.00      0.00       9.97
MADHYA PRADESH2807.50      0.00      0.00     2807.50    0.00      1703.66   11.76      4522.92
MAHARASHTRA   7295.00      672.00    0.00     7967.00    0.00      2884.84   257.73     11109.57
MANIPUR       0.00         0.00      45.41    45.41      0.00      0.00      5.45       50.86
MEGHALAYA     0.00         0.00      2.05     2.05       0.00      156.00    31.03      189.08
MIZORAM       0.00         0.00      51.86    51.86      0.00      0.00      36.47      88.33
NAGALAND      0.00         0.00      2.00     2.00       0.00      0.00      28.67      30.67
ORISSA        420.00       0.00      0.00     420.00     0.00      2061.92   64.30      2546.22
PONDICHERRY   0.00         32.50     0.00     32.50      0.00      0.00      0.00       32.50
PUNJAB        2630.00      25.00     0.00     2655.00    0.00      2230.23   222.55     5107.78
RAJASTHAN     3615.00      443.80    0.00     4058.80    0.00      987.96    30.25      5077.01
SIKKIM        0.00         0.00      5.00     5.00       0.00      0.00      47.11      52.11
TAMIL NADU    2970.00      523.20    0.00     3493.20    0.00      2122.20   85.55      5700.95
TRIPURA       0.00         148.50    4.85     153.35     0.00      0.00      16.01      169.36
UTTAR PRADESH 4072.00      0.00      0.00     4072.00    0.00      524.10    25.10      4621.20
UTTRAKHAND    0.00         0.00      0.00     0.00       0.00      1252.15   132.92     1385.07
WEST BENGAL   4780.00      100.00    12.06    4892.06    0.00      977.00    143.40     6012.46
               47267.0                                             27257.0
Total State    0       4077.12 602.61 51946.730.00                 0       2822.32 82026.05
                                              MODE WISE BREAKUP
                           THERMAL                       NUCLEAR   HYDRO RES            TOTAL
State/UT(Utiliti                                                   (Renewable) (MNRE)
es               COAL      GAS       DIESEL TOTAL
CENTRAL SECTOR
DVC             3700.00    90.00     0.00     3790.00    0.00      143.20    0.00       3933.20
HP / NJPC JV    0.00       0.00      0.00     0.00       0.00      1500.00   0.00       1500.00
NEEPCO          0.00       375.00    0.00     375.00     0.00      755.00    0.00       1130.00
NEVEYLY LIG. COR2615.00    0.00      0.00     2615.00    0.00      0.00      0.00       2615.00
NHDC            0.00       0.00      0.00     0.00       0.00      1520.00   0.00       1520.00
NHPC            0.00       0.00      0.00     0.00       0.00      3767.20   0.00       3767.20
NTPC            25605.00   4017.23   0.00     29622.23   0.00      0.00      0.00       29622.23
NUCLEAR P CORP0.00         0.00      0.00     0.00       4560.00   0.00      0.00       4560.00
NTPC+ONGC       0.00       2220.00   0.00     2220.00    0.00      0.00      0.00       2220.00
TEHRI HYD CORP.0.00        0.00      0.00     0.00       0.00      1000.00   0.00       1000.00
              31920.0
Total Central 0       6702.23 0.00            38622.234560.00 8685.400.00               51867.63
PRIVATE SECTOR
A & N ISLAND  0.00         0.00      20.00    20.00      0.00      0.00      0.10       20.10
ANDHRA PRADESH0.00         2878.40   36.80    2915.20    0.00      0.00      530.76     3445.96
ARUNACHAL PRD.0.00         0.00      0.00     0.00       0.00      0.00      0.03       0.03
ASSAM          0.00     24.50   0.00         24.50     0.00        0.00         0.00      24.50
BIHAR          0.00     0.00    0.00         0.00      0.00        0.00         9.50      9.50
CHHATISGARH    1600.00 0.00     0.00         1600.00   0.00        0.00         199.90    1799.90
DELHI          0.00     0.00    0.00         0.00      0.00        0.00         1.05      1.05
GOA            0.00     48.00   0.00         48.00     0.00        0.00         30.00     78.00
SL. REGION             THERMAL                        Nuclear   HYDRO         R.E.S.@ TOTAL
GUJARAT        1640.00 2577.50 0.20          4217.70   0.00        0.00         1821.14 6038.84
NO.           COAL     GAS     DSL          TOTAL               (Renewable)   (MNRE)
HARYANA        0.00     0.00    0.00         0.00      0.00        0.00         35.80     35.80
1   Northern 0.00
HIMACHAL PRD. 23620.003813.26
                        0.00   12.99
                                0.00        27446.25
                                             0.00     1620.00
                                                       0.00     13622.75
                                                                   578.00     2777.32
                                                                                0.00    45466.32
                                                                                          578.00
2   Western
JAMMU         29290.507903.81
       & KASHMI0.00     0.00   17.48
                                0.00        37211.79
                                             0.00     1840.00
                                                       0.00     7447.50
                                                                   0.00       4918.28
                                                                                0.00    51417.57
                                                                                          0.00
3   Southern 19172.504690.78
JHARKHAND      360.00   0.00   939.32
                                0.00        24802.60
                                             360.00   1100.00
                                                       0.00     11299.03
                                                                   0.00       8517.55
                                                                                0.00    45719.18
                                                                                          360.00
4   Eastern
KARNATAKA     17635.38190.00
               1460.00 220.00 17.20
                                106.50      17842.58
                                             1786.50 0.00
                                                       0.00     3882.12
                                                                   0.00       344.41
                                                                                1842.94 22069.11
                                                                                          3629.44
    N.
KERALA         0.00     174.00  21.84        195.84    0.00        0.00         0.03      195.87
5   Eastern
LAKSHADWEEP   60.00
               0.00    787.00
                        0.00   142.74
                                0.00        989.74
                                             0.00     0.00
                                                       0.00     1116.00
                                                                   0.00       223.32
                                                                                0.75    2329.06
                                                                                          0.75
6   Islands   0.00
MADHYA PRADESH0.00     0.00
                        0.00   70.02
                                0.00        70.02
                                             0.00     0.00
                                                       0.00     0.00
                                                                   0.00       6.10
                                                                                232.60  76.12
                                                                                          232.60
MAHARASHTRA    2470.00 17384.8
                        180.00  0.00         2650.00   0.00        447.00       2316.15 5413.15
7   All India 89778.38
MIZORAM        0.00    50.00   1199.75
                                0.00        108362.98
                                             0.00     4560.00
                                                       0.00     37367.40
                                                                   0.00       16786.98167077.36
                                                                                0.00      0.00
ORISSA          600.00    0.00     0.00     600.00    0.00        0.00         4.30      604.30
PONDICHERRY     0.00      0.00     0.00     0.00      0.00        0.00         0.03      0.03
PUNJAB          0.00      0.00     0.00     0.00      0.00        0.00         73.08     73.08
RAJASTHAN       270.00    0.00     0.00     270.00    0.00        0.00         1132.20   1402.20
TAMIL NADU      250.00    503.10   411.66   1164.76   0.00        0.00         5130.04   6294.80
TRIPURA         0.00      0.00     0.00     0.00      0.00        0.00         0.00      0.00
UTTAR PRADESH   600.00    0.00     0.00     600.00    0.00        0.00         587.08    1187.08
UTTRAKHAND      0.00      0.00     0.00     0.00      0.00        400.00       0.05      400.05
WEST BENGAL     1341.38   0.00     0.14     1341.52   0.00        0.00         17.15     1358.67
Total       Pvt.10591.3                                        13964.6
Sector         8        6605.50 597.14 17794.020.00    1425.00 6       33183.68
               89778.3 17384.8 1199.7 108362.9         37367.4 16786.9 167077.3
TOTAL          8        5       5      8       4560.00 0       8       6
                                    Region wise break up
                            Capacity addition for the 11th Plan:
Type/Sector         Central        State          Private       Total
Thermal             24840          23301          11552         59693
Hydro               8654           3482           3491          15627
Nuclear             3380           0              0             3380
Total               36874          26783          15043         78700
                                     3380
                      15627
                                                    5969
                   Thermal    Hydro    Nuclear
TOTAL CAPACITY COMMISSIONED DURING 2008-09            (MW)
  SECTOR   THERMAL    HYDRO                   NUCLEAR   TOTAL
  CENTRAL  750        -                       -         750
  STATE    852.2      969                     -         1821.2
  PRIVATE  882.5      -                       -         882.5
  TOTAL    2484.7     969                     -         3453.7
 TOTAL CAPACITY COMMISSIONED               DURING 2009-10
 (MW)
  SECTOR     THERMAL         HYDRO            NUCLEAR      TOTAL
  CENTRAL    1740                             440          2180
  STATE      3079            39                            3118
  PRIVATE    4287            -                -            4287
  TOTAL      9106            39               440          9585
*COMMISSIONED-   Unit achieved full load
CAPACITY ADDITION TARGET FOR THE YEAR 2010-11
 SECTOR        THERMAL       HYDRO           NUCLEAR         TOTAL
 CENTRAL       6015          649             1220            7884
 STATE         6549.2        356                             6905.2
 PRIVATE       6191          461                             6652
 TOTAL         18755.2       1466            1220            21441.2
CAPACITY COMMISSIONED DURING 2010-11 as on 17 July 2010
 SECTOR     THERMAL          HYDRO            NUCLEAR      TOTAL
 CENTRAL    125              80               -            205
 STATE         1250           50              -             1300
 PRIVATE       735            -               -             735
 TOTAL         2110           130             0             2240
                               Public Sector Utilities:
   1. National Thermal Power Corporation:
                            NO. OF PLANTS             CAPACITY (MW)
NTPC Owned
Coal                                          15                        25,375
Gas/Liquid Fuel                                7                         3,955
Total                                         22                        29,330
Owned By JVs
Coal & Gas                                     5                         3,364
Total                                         27                        32,694
Regional Spread of Generating Facilities
     REGION                 COAL              GAS                  TOTAL
Northern                        8,015               2,312              10,327
Western                         6,360               1,293                7,653
Southern                        3,600                 350                3,950
Eastern                         7,400                   -                7,400
JVs                             1,424               1,940                3,364
Total                          26,799               5,895              32,694
NTPC has also formulated its business plan of capacity addition of about 1,000 MW thru
renewable resources by 2017. In addition, capacity addition of 301 MW through Solar PV
and Thermal by March 2014 has envisaged in line with National Solar Mission.
   2. National Hydro-Electric Power Corporation:
Beyond XIth Plan
                                                                                                     Updated On :-
27/07/2010
                                                                  Total
S No. Project                  Country/State       Capacity                  Status
                                                                  Capacity
                               Arunachal
1     Dibang                                       12 * 250 3000             Awating clearances
                               Pradesh
2     Kotli Bhel Stage - I B   Uttarakhand         4 * 80         320        Awating clearances
                                                   8          *
3     Kotli Bhel Stage - II    Uttarakhand                        530        Awating clearances
                                                   66.25
                               Jammu           &
4     Pakal Dul*                                   4 * 250        1000       Awating clearances
                               Kashmir
5     Kotli Bhel Stage - I A   Uttarakhand         3 * 65         195        Awating clearances
6     Teesta - IV              Sikkim              4 * 130        520        Awating clearances
7                              Jammu           &
      Kiru*                                        4 * 150        600        Awating clearances
                               Kashmir
                               Jammu           &
8     Kwar*                                        4 * 130        520        Awating clearances
                               Kashmir
                               Arunachal
9     Tawang-I                                     3 * 200        600        Awating clearances
                               Pradesh
10    Loktak Downstream*       Manipur             2 * 33         66         Awating clearances
                               Arunachal
11    Tawang-II                                    4 * 200        800        Awating clearances
                               Pradesh
12    Tipaimukh*               Manipur             6 * 250        1500       Awating clearances
                               Jammu           &
13    Kishenganga                                  3 * 110        330        Under Construction
                               Kashmir
                               Jammu           &                             Under    Survey   and    Investigation
14    Bursar                                       4 * 255        1020
                               Kashmir                                       Stage
                                                                             Under    Survey   and    Investigation
15    Karmoli Lumti Tulli      Uttarakhand         2 * 27.5       55
                                                                             Stage
                                                                             Under    Survey   and    Investigation
16    Garba Tawaghat           Uttarakhand         3 * 210        630
                                                                             Stage
                                                                             Under    Survey   and    Investigation
17    Chungar Chal             Uttarakhand         2 * 120        240
                                                                             Stage
                                                                             Under    Survey   and    Investigation
18    Lachen                   Sikkim              3 * 70         210
                                                                             Stage
                                                                             Under    Survey   and    Investigation
19    Goriganga-IIIA           Uttarakhand         3 * 40         120
                                                                             Stage
      Dhauliganga                                                            Under    Survey   and    Investigation
20                             Uttarakhand         3 * 70         210
      Intermediate                                                           Stage
                                                   Total          12466
* Under Joint Venture
Projects under category ‘Under Survey and Investigation Stage’ are for survey & investigation for
preparation of PFR/FR/DPR of the project for getting various statutory clearances. For preparation
of these reports, various hydrological, geological, meteorological, power potential studies etc are
carried out at the project site.
Projects under ‘Awaiting clearances’ category are awaiting various statutory clearances
from CWC / CEA / MOP / MOWR/PIB and investment sanction from Cabinet Committee on Economic
Affairs (CCEA) after preparation of DPRs.
    3. Nuclear Power Corporation India Limited:
              Project               Capacit     Expected Commercial
                                    y (MWe)            Operation
RAJASTHAN ATOMIC POWER              2 x 700     Unit 7 – Jun-2016
PROJECT                                         Unit 8 – Dec-2016
KAKRAPAR        ATOMIC       POWER 2 x 700      Unit 3 – Jun-2015
PROJECT                                         Unit 4 – Dec-2015
    4. North Eastern Electric Power Corporation limited:
Ongoing:
    1. TUIRIAL HYDRO ELECTRIC PROJECT ( 60 MW) Mizoram:
       Lot – IV (Hydro-Mechanical works): NIB floated on 03.11.10, and the last date for
       submission has been fixed on 07.01.2011. The bids shall be opened on the same
       day. Lot-V (EM works)
    2. KAMENG HYDRO ELECTRIC PROJECT (600 MW) Arunachal Pradesh:
       Commissioning schedule May, 2013( Revised)
    3. TRIPURA GAS BASED COMBINED CYCLIC POWER PROJECT, Tripura (101MW)
       Years of Commissioning / Completion Schedule - 36 months from the date of award
       (i.e. by July'2013) for Main Plant Work.
Future Projects:
Sl      NAME OF THE PROJECT                  COMMISSIONING SCHEDULE
No.
1       Kameng-I H.E. Project (1120          6 Years from the Date of CCEA Clearnce.
        MW), Ar. Pradesh
2       Mawphu H.E. Project (85 MW),         4.5 years from CCEA Clearnce.
        Meghalaya
3       Projects in Mizoram :
a       Lungreng H.E. Project ( 815MW)       Necessary action has been initiated for
b       Chhimtuipui H.E. Project ( 635       obtaining clearances of the Ministry of
        MW)                                  External Affairs, Ministry of Defense,
c       Mat H.E. Project ( 76 MW)            Home Ministry, Govt. of India.
4       Garo    Hills  Thermal    Power      36 months from CCEA Clearnce.
        Project (500 MW) Meghalaya
5       West Khasi Hills Thermal Power       32 months from CCEA Clearance.
        Project (240 MW) Meghalaya
6       Agartala Gas Turbine Plant-          30 months from Investment approved.
        Combined Cycle Conversion
        Project (52 MW), Tripura
     4. Tehri Hydro Development Corporation (THDC)
     Future Projects:
THDC proposes to add 2804 MW during XIIth Plan (2012-2017) in the Capacity Addition
Programme of MOP with the planned commissioning of following Projects:
1. Tehri Pumped Storage Plant            -   1000 MW
2. Vishnugad Pipalkoti HEP           -        444 MW
3. Kishau Multi Purpose Project      -       600 MW
4. Malari Jelam HEP                 -        114 MW
5. Jelam Tamak HEP                  -        126 MW
6. Karmoli HEP                      -        140 MW (*)
7. Jadhganga HEP                     -         50 MW (*)
8. Bokang Bailing HEP               -        330 MW (*)
(*) Under Wildlife clearance
     5. Satluj jal vidyut nigam limited
Future Projects:
Projects under Survey and Investigation and DPR Preparation
A. In the State of Himachal Pradesh
Sr. No. Project                               Installed Capacity
1.        Luhri HEP                           775 MW
2.        Dhaulasidh                          66 MW
B. In the State of Uttarakhand
Sr. No Project                                Installed Capacity
1.        Devsari HEP                         252 MW
2.        Naitwar Mori HEP                    60 MW
3.        Jakhol Sankri HEP                   51 MW
C. In the State of Manipur
Sr. No Project                                Installed Capacity
1.        Tipaimukh HEP*                      1500 MW
*This project will be developed by a joint venture company to be established in
which SJVN have agreed to take a 26% equity inerest, with NHPC Limited and State
of Manipur taking 69% and 5% equity interest respectively.
Future Plans
The SJVN proposes to add 5000 MW additional capacity by 2014-15. This would
require an additional investment of about Rs. 29,000 Crores which shall be met
mainly from internal accruals and loans from domestic /multi literal funding
agencies.
To achieve the target of setting up of additional 5000 MW SJVN is exploring the
possibilities of taking up new projects in Himachal Pradesh, Arunachal Pradesh,
Nepal and Bhutan.
Neyveli Lignite Corporation Limited:
Neyveli Lignite Corporation Limited is a Central Public Sector Undertaking engaged in
lignite mining and power generation
Future Plans:
    1. WIND POWER PROJECT IN TAMILNADU: NLC is in the process of setting up a 50MW
       capacity wind based power project in Tirunelveli District of Tamilnadu.
    2. Thermal Power Plant of 250 MW capacity with linked mine of 2.25 MTPA is proposed
       to be set up at Bithnok in Bikaner District, Rajasthan.
    3. BARSINGSAR EXTENSION POWER PROJECT (250 MW) AND HADLA & PALANA LIGNITE
       MINE (2.5 MTPA), Rajasthan
    4. 2 x 800 MW power plant with linked lignite mine of 13.5 MTPA at Jayamkondam in
       the State of Tamil Nadu
    5. COAL BASED THERMAL POWER PLANT IN ORISSA (4 X 500 MW)
                               List of Hydro projects under execution
                      (Excluding projects under Ministry of New & Renewable Energy)
                                                 *****
 Sl.         Name of Project         Unit           State/             Capacity          Likely
 No.                                 No.        Implem. Agency          (MW)          Commissioning
A. Projects as per 11th Plan Programme
       Central Sector
1      Parbati St. II                U-1 to    Himachal Pradesh/         800             1 2th P la n
       4x200= 800 MW                  U-4          NHPC
2      Chamera-III                   U-1 to    Himachal Pradesh/         231             2011-12
       3x77= 231 MW                   U-3          NHPC
3      Parabati-III                  U-1 to    Himachal Pradesh/         520             2011-12
       4x130= 520 MW                  U-4          NHPC
4      Kol Dam                       U-1 to    Himachal Pradesh/         800             2011-12
       4x200= 800 MW                  U-4          NTPC
5      Rampur                        U-1 to    Himachal Pradesh/         412             1 2th P la n
       6x68.67= 412 MW                U-6          SJVNL
6      Uri-II                        U-1 to    Jamm u & Kashmir/         240             2011-12
       4x60= 240 MW                   U-4           NHPC
7      Chutak                        U-1 to    Jamm u & Kashmir/          44             2011-12
       4x11=44 MW                     U-4           NHPC
8      Nimoo Bazgo                   U-1 to    Jamm u & Kashmir/          45             2011-12
       3x15=45 MW                U-3            NHPC
9      Koteshwar                U-1 to        Uttaranchal/           400         2010-12
       4x100= 400 MW             U-4            THDC
10     Loharinagpala            U-1 to        Uttaranchal/           600         1 2th P la n
       4x150=600 MW              U-4            NTPC
11     Tapovan Vishnugad        U-1 to        Uttaranchal/           520         1 2th P la n
       4x130=520 MW              U-4            NTPC
12     Teesta Low Dam-III       U-1 to       West Bengal/            132         2011-11
       4x33= 132 MW              U-4            NHPC
13     Teesta Low Dam-IV        U-1 to       West Bengal/            160         2011-12
       4x40= 160 MW              U-4            NHPC
14     Subansiri Lower          U-1 to     Arunachal Pradesh/       2000         1 2th P la n
       8x250= 2000 MW            U-8            NHPC
15     Kameng                   U-1 to     Arunachal Pradesh/        600         1 2th P la n
       4x150= 600 MW             U-4           NEEPCO
                                          Sub- total (Central):     7504
       State Sector
16     Uhl-III                  U-1 to     Himachal Pradesh/         100         1 2th P la n
       3x33.33= 100 MW           U-3     Beas Valley Power Corp.
                                              Ltd. (BVPC)
17     Swara Kuddu              U-1 to     Himachal Pradesh/         110         1 2th P la n
       3x36.6= 110 MW            U-3            HPPCL
18     Priyadarshni Jurala       U-6        Andhra Pradesh/          39          2010-11
       6x39= 234 MW                           APGENCO
19     Nagarujana Sagar TR      U-1 &       Andhra Pradesh/          50          2011-12
       2x25= 50 MW               U-2          APGENCO
20     Lower Jurala             U-1 to      Andhra Pradesh/          240         1 2th P la n
       6x40= 240 MW              U-6          APGENCO
21     Pulichintala             U-1 to      Andhra Pradesh/          120         2011-12
       4x30= 120 MW              U-4          APGENCO
22     Pallivasal               U-1 to          Kerala/              60          1 2th P la n
       2x30= 60 MW               U-2             KSEB
23     Bhawani Barrage II       U-1 &        Tam il Nadu/            30          2011-12
       2x15= 30 MW               U-2            TNEB
24     Bhawani Barrage III      U-1 &        Tam il Nadu/            30          2011-12
       2x15= 30 MW               U-2            TNEB
25     Myntdu                   U-1&         Meghalaya/              84          2011-11
       2x42= 84 MW               U-2           MeSEB
26     New Umtru                U-1&         Meghalaya/              40          2011-12
       2x20= 40 MW               U-2           MeSEB
                                           Sub- total (State):       903
       Private Sector
 Sl.          Name of Project   Unit             State/            Capacity      Likely
No.                              No.        Implem. Agency          (MW)      Commissioning
27     Karcham Wangtoo          U-1 to      Himachal Pradesh/        1000       2011-12
       4x250= 1000 MW            U-4            JKHCL
28     Budhil                   U-1 &      Himachal Pradesh/         70          2010-11
       2x35= 70 MW               U-2           LANCO
29     Malana-II                U-1 &      Himachal Pradesh/         100         2010-11
       2x50= 100 MW              U-2         Everest Power
30     Sorang                   U-1 &      Himachal Pradesh/         100         2011-12
       2x50= 100 MW              U-2     Himachal Sorang Power
31     Shrinagar                U-1 to        Uttarakhand/           330         2011-12
       4x82.5= 330 MW            U- 4     M /s G VK Industries
32     Maheshwar                U-1 to     M adhya Pradesh/          400         2011-12
       10x40= 400 MW            U-10           SMHPCL
33      Chujachen                            U-1&                Sikkim/                 99              2010-11
        2x49.5= 99 MW                         U-2                  Gati
34      Teesta- III                          U-1 to              Sikkim/                1200             2011-12
        6x200= 1200 MW                        U-6            T eesta U rja Ltd.
                                                           Sub- total (Private):         3299
                           Total ‘A’ (11th Plan):                                       11706
A-1 Additional Unit likely to commission in 11th Plan
25a     Myntdu                                U-1               Meghalaya/               42              2011-12
        1x42= 42 MW                                              MeSEB
B. Projects likely to give benefits beyond 11th Plan
        Central Sector
35      Kishanganga                          U-1 to         Jamm u & Kashm ir/           330             1 2th P la n
        3x110= 330 MW                         U-3                NHPC
36      Pare                                 U-1 to         Arunachal Pradesh/           110             1 2th P la n
        2x55= 110 MW                          U-2              NEEPCO
        State Sector
37      Baglihar-II*                         U-1 to              J&K/                    450             1 2th P la n
        3x150= 450 MW                         U-3               JKPDC
38      Kashang-I                                           Himachal Pradesh/            65              1 2th P la n
        65 MW                                                   HPPCL
39      Thottiyar                                               Kerala/                  40              1 2th P la n
        40 MW                                                    KSEB
        Private Sector
40      Tidong-I                             U-1 to         Himachal Pradesh/            100             1 2th P la n
        2x50= 100 MW                          U-2          M/s Nuziveedu Seeds
41      Phata Byung                                            Uttarakhand/              76              1 2th P la n
        76 MW                                                   M/s Lanco
42      Singoli Bhatwari                     U-1 to            Uttarakhand/              99              1 2th P la n
        3x33= 99 MW                           U-3         L& T U ttaranchal H ydro
                                                              power Limited
43      Teesta- VI                           U-1 to               Sikkim/                500             1 2th P la n
        4x125= 500 MW                         U-4                 LANCO
44      Rangit-IV                            U-1 to               Sikkim/                120             1 2th P la n
        3x40= 120 MW                          U-3           Jal Pow er corp. L td.
45      Jorethang Loop                                            Sikkim/                96              1 2th P la n
        2x48= 96 MW                                         M/s DANS Energy
46      Bhasmey                              U-1 to               Sikkim/                51              1 2th P la n
        3x17= 51 MW                           U-3            G ati Infrastructu re
                       Total ‘B’ (Beyond 11th Plan):                                    2037
                       Total- Under Execution:                                         13785
                     THERMAL UNITS TARGETED FOR COMMISSIONING IN THE YEAR 2010-11
                                       (Original Target and Actual Achieved)                            As On-31.10.10
      State     Project Name     Impl           Unit No       Targeted   Cap. (MW)   Commd. Cap. (MW)     Actual(A)/ Ant Comm.
                                Agency                                                                            Date
A.CENTRAL SECTOR
Rajasthan    Barsingsar        NLC                  U-2                  125                                      11/2010
             Lignite
                                                    U-1                   *                125                  28.06.10(A)
Haryana         Indira         APCPL                U-1                  500               500                  31.10.10(A)
                Gandhi TPP
UP              NCP Project    NTPC                 U-6                  490               490                  30.07.10(A)
                St-II,
WB              Mejia TPS      DVC                  U-1                  500               500                  30.09.10(A)
                Extn
                                                    U-2                  500                                      02/2011
                Durgapur       DVC                  U-1                  500                                      03/2011
               Steel TPS
                                          U-2       500           05/2011
               Farakka         NTPC       U-6       500           02/2011
               STPS- III
Chhattisgarh   Korba STPP      NTPC       U-7       500           11/2010
Jharkhand      Kodarma TPP     DVC        U-1       500           '03/2011
TN             Neyveli TPS-    NLC        U-1       250           02/2011
               II Exp.
AP             Simhadri        NTPC       U-3       500           01/2011
               STPP Extn.
Jharkhand      Maithon RB      DVC        U-1       525           02/2011
               TPP
Sub Total(A)                                       5890   1615
B.STATE SECTOR
Delhi          Pragati         PPCL       GT-1      250   250    24.10.10(A)
               CCGT – III
                                          GT2       250            12/2010
                                          GT-3      250            04/2011
                                          ST-1      250            06/2011
                                          GT-4      250            02/2011
                                          ST-2      250            05/2011
Gujarat        Surat Lignite   GIPCL      U-3*       *    125    12.04.10(A)
               TPP Extn.
                                          U-4 *      *    125    23.04.10(A)
               Hazira CCPP     GSECL       GT       223            03/2011
               Extn.
                                           ST       128            03/2011
               Pipavav CCPP    GSECL     Block-1    351            04/2011
Haryana        Rajiv Gandhi    HPGCL       U-2      600   600    01.10.10(A)
               TPS,Hissar
Karnataka      Raichur U-8     KPCL        U-8      250   250    26.06.10(A)
Rajasthan      Chhabra TPS     RRVUNL     U-2 *      *    250    04.05.10(A)
AP             Kakatiya        APGENCO     U-1      500   500    27.05.10(A)
               TPP
               Rayalseema      APGENCO    U-5       210           11/2010
               TPP St-III
        State     Project     Impl Agency     Unit No   Targeted Cap.   Commd. Cap.   Actual/ Ant Comm. Date
                   Name                                     (MW)           (MW)
UP              Parichha Extn UPRVUNL          U-5           250                             06/2011
                                               U-6           250                             06/2012
                Harduaganj      UPRVUNL        U-8           250                             03/2011
                Ext
                                               U-9          250                              04/2011
Maharashtra     Khaperkheda     MSPGCL         U-1          500                              02/2011
                TPS Expn.
                Bhusawal        MSPGCL         U-4          500                              03/2011
                TPS Expn.
WB              Santaldih TPP   WBPDCL         U-6          250                              12/2010
                Extn Ph-II
Tripura         Baramura        TSECL          GT*                          21             03.08.10(A)
                GT
Sub Total (B)                                               6012           2121
C.PRIVATE SECTOR
AP              Konaseema       Konaseema       ST          165             165            30.06.10(A)
                CCPP            gas Power
                                Ltd.
                Lanco           Lanco           ST          133             133            18.07.10(A)
                Kondapalli      Kondapalli
                Ph-II (ST)
Delhi           Rithala CCPP    NDPL           GT-1        35.75                             11/2010
                                               GT-2        35.75                             11/2010
                                                ST          36.5                             12/2010
Gujarat         Mundra TPP      Adani Power    U-3          330             330            02.08.10(A)
                Ph-I(U-3&4)     Ltd
                                               U-4          330                              11/2010
Maharashtra     JSW             JSW            U-1          300             300            24.08.10(A)
                Ratnagiri       Energy(Ratn
                TPP             agiri) Ltd
                                               U-2          300                              11/2010
                                               U-3          300                              11/2010
                                               U-4          300                              04/2011
                Wardha          WPCL           U-1           *              135            05.06.10(A)
                Warora          (KSK)
                Wardha                         U-2           *              135            10.10.10(A)
                Warora
Orissa          Sterlite TPP    Sterlite      U-2(Ist       600             600            14.10.10(A)
                                Energy Ltd.    Unit)
                                               U-1          600                              01/2011
Rajasthan       Jallipa-        Raj West       U-2          135             135            08.07.10(A)
                Kapurdi TPP     Power
                                Ltd.(JSW)
                                               U-3          135                              01/2011
                                               U-4          135                              02/2011
                                               U-5          135                              04/2011
                                               U-6          135                              06/2011
                                               U-8          135                              09/2011
UP              Anpara-C        Lanco          U-1          600                              01/2011
                                Anpara
                                Power Pvt.
                                Ltd.
                Rosa TPP        Rosa Power     U-2           *              300            28.06.10(A)
                Ph-1            supply
                                Co.Ltd (
                                Reliance)
Karnataka       Udupi TPP       UPCL           U-1         507.5            600            23.07.10(A)
                                               U-2         507.5                             01/2011
SubTotal (C )                                              5891            2833
Grand Total (A+B+C)                                        17793           6569
                         State Generation Board
Northern Region:
    1. Delhi:
    2. Punjab:
Hydel project:
    a) SHAHPUR KANDI HYDRO ELECTRIC PROJECT (168 MW) - This project is
       likely to be completed during 12th plan.
    b) SHAHPURKANDI EXTENSION (55.5 MW) - The Project is likely to be
       commissioned during 12th Plan.
Thermal Project:
Goindwal Sahib - 2X270 MW Coal Based Thermal Power Project - the 1 st unit is
scheduled for commercial operation on 31.01.2013 and 2 nd unit on 30.04.2013.
    3. Rajasthan:
Ongoing:
Sl.n                Project               Capacity      Commission
 o                                                          ing
                                                         Schedule
1      KALISINDH TPS UNIT-1                  600 MW        December
                                                                2011
2      KALISINDH TPS UNIT-2                  600 MW       March 2012
3      CHHABRA TPS PHASE 2 (UNIT-3)          250 MW        November
                                                                2011
4      CHHABRA TPS PHASE 2 (UNIT-4)          250 MW        December
                                                                2011
5      RAMGARH EXTN. PROJECT GT              110 MW        NOV 2011
6      RAMGARH EXTN. PROJECT ST               50 MW         FEB 2012
    Future Projects:
Sl.                 Project               Capacity      Commission
no                                                          ing
                                                         Schedule
1      CHHABRA TPS STAGE II (UNIT-5)           660 MW       30.11.2013
2      CHHABRA TPS STAGE II (UNIT-6)           660 MW       30.05.2014
3      SURATGARH TPS STAGE V (UNIT- 7)         660 MW       30.11.2013
4       SURATGARH TPS STAGE V (UNIT- 8)                660 MW       30.05.2014
Gas based Power plant:
Sl.                    Project                    Capacity       Commission
no                                                                   ing
                                                                  Schedule
1       Dholpuer Gas Thermal Power Station             330 MW         2013-14
        Stage-II
2       KOTA Gas Power Project                         330 MW         2013-14
3       Chabra Gas Power Project                       330 MW         2013-14
4       Ramgarh Gas Power Station(Stage                160 MW          2015-16
        -IV)
Coal based power plant:
Sl.                    Project                    Capacity       Commission
no                                                                   ing
                                                                  Schedule
1       Suratgarh    TPS    unit   9-10(Super          1320 MW         2015-16
        Critical)
2       Kalisindh TPS Unit 3-4 (Super Critical)        1320 MW         2015-16
3       Banswara TPS Unit I-II(Super Critical)         1320 MW         2016-17
    4. Himanchal Pradesh:
Projects which have been alloted/under process of allotment and expected to yield
benefit during the 12th Plan period
A) CENTRAL /JOINT SECTOR
    1. Khab-I – Satluj – 450mw - Allotted to SJVNL
    2. Khab-II - 186.00mw - Allotted to SJVNL
    3. Luhri - 750.00mw - Allotted to SJVNL
    4. Parbati-I - Beas 750.00mw - Allotted to NHPC
B) PRIVATE SECTOR
    S.no            Project             Basin       Capacity                 Status
                                                     (MW)
    1       Chanju-I                   Ravi       25              Allotted
2    Chanju-II      Ravi     17    Allotted
3    Bara Banghal   Ravi     20    Allotted
4    Bajoli-Holi    Ravi     18    Allotted
5    Kuther Ravi    Ravi     260   Allotted
6    Suil Ravi      Ravi     13    Under process of
                                   allotment
7    Sal-I Ravi     Ravi     6.5   Allotted
8    Bardang        Chenab   126   Under process of
                                   allotment
9    Chattru        Chenab   108   Allotted
10   Miyar          Chenab   90    Under process of
                                   allotment
11   Tinget         Chenab   81    Under process of
                                   allotment
12   Teling         Chenab   69    Under process of
                                   allotment
13   Tandi          Chenab   104   Under process of
                                   allotment
14   Rashil         Chenab   102   Under process of
                                   allotment
15   Gondhala       Chenab   144   Under process of
                                   allotment
16   Khoksar        Chenab   90    Under process of
                                   allotment
17   Ropa           Satluj   60    Under process of
                                   allotment
18   Mane Nadang    Satluj   70    Under process of
                                   allotment
19   Lara           Satluj   60    Under process of
                                   allotment
20   Bahairari      Satluj   5.5   Allotted
  21      Chango Yangthang     Satluj    140           Allotted
  22      Yangthang Khab       Satluj    261           Under process of
                                                       allotment
  23      Sumta Kathang        Satluj    130           Under process of
                                                       allotment
  24      Kut                  Satluj    24            Allotted
  25      Tidong-II            Satluj    60            Allotted
  26      Jangi thopan         Satluj    480           Allotted
  27      Thopan Porari        Satluj    480           Allotted
  28      Kilhi-Balh           Beas      7.5           Under process of
                                                       allotment
  29      Dhaula-Sidh          Beas      40            Allotted
  30      Shalvi               Yamuna    7             Under process of
                                                       allotment
  31      Rupin                Yamuna    39            Allotted
  5. Haryana:
Ongoing:
  •    1320 MW Mahatma Gandhi Thermal Power Project in Jhajjar Case-II -
       Power likely to be available from Dec., 2011
Future Projects:
  •    1500 MW Gas based Project at Faridabad.
  •    660 MW capacity additional super critical Thermal Unit at Yamuna
       Nagar as an extension of 2x300 MW DCRTPP, Yamuna Nagar.
  •    2800 MW (4x700 MW) Nuclear Power Plant in Distt. Fatehabad near
       Village Gorakhpur – Site stands identified by Nuclear Power
       Corporation of India. Govt. of India has approved the setting of this
       Nuclear Power Project in Haryana during October 2009
  6. Jammu and Kashmir:
Projects under construction: (State sector)
S.n                        Project                     Capacity
  o                                                     (MW)
1      Baglihar Stage-II                                         450
2      Pahalgam(3rd Unit)                                       1.50
3      Matchil                                                  0.35
4      Baderwah (3rd Unit)                                       0.5
5      Sanjak                                                   1.26
    7. Uttar Pradesh:
New Identified Projects
Schedule I – List of Tentative Small Hydro Projects (These details are
indicative. Capacity & Location of a particular SHP may change as per
assessment of Developer subject to approval of UPJVNL)
S
                             Capacity(
No Name of Project                         Distt                Canal
                              M.W)
.
1     Khairi                      3.75 Saharanpur     Hathini Kund Link Canal
                                                      Sharda Canal Hardoi
2     Madho-I                     3.75 Pilibhit
                                                      Branch
                                         Shahjahanp   Sharda Canal Hardoi
3     Madho-II                    2.50
                                         ur           Branch
      Shahjahanpur(Nahil                 Shahjahanp   Sharda Canal Hardoi
4                                 2.50
      )                                  ur           Branch
                                                      Ram Ganga Feeder
5     Ram Ganga                   3.20 Bijnore
                                                      Canal
6     Bansagar-I                12.00 Mirzapur        Adwa Meja Link Canal
7     Bansagar-II               10.00 Mirzapur        Adwa Meja Link Canal
8     Ken Branch-I                3.00 Banda          Ken Branch
9     Ken Branch-II               1.50 Banda          Ken Branch
10 Bandran                      10.50 Lalitpur        Dam toe
11 Karmnasa                       2.00 Chanduli       Dam toe
12 Sharda Sagar                   3.00 Pilibhit       Dam toe
                                                              Sharda Canal Hardoi
13 Dunda                             5.00 Pilibhit
                                                              branch
14 Malakpur Rehni                    4.00 Saharanpur          Eastern Yamuna Canal
15 Meja                              9.50 Mirzapur            Dam toe
                                    76.20
       Total
                                    M.W.
   8. Uttrankhand:
Future Plan:
S.no            Project            District        Capacity               Year of
                                                       (KW)             Completion
  1      Asiganga-III           Uttarkashi      9000               2012-13
  2      Dunao                  Pauri Garhwal   1500               2012-13
  3      Suwarigad              Uttarkashi      2000               2012-13
  4      Tankul                 Pithoragarh     12000              2012-13
  5      Sonegad                Uttarkashi      3000               2012-13
  6      Suringad II            Pithoragarh     5000               2012-13
  7      Urgam II               Chamoli         3800               2012-13
  8      Painagad               Pithoragarh     9000               2012-13
  9      Pilangad II            Uttarkashi      4000               2012-13
 10      Bhilangana-II- 2A      Tehri           24000              2012-13
 11      Bhilangana-II- 2B      Tehri           24000              2012-13
 12      Bhilangana-II- 2C      Tehri           24000              2012-13
Greensite Project allocated to UJVNL
                                Estimated                                          Completion
S.No.     Name of Project       Potential       District        River/Tributary     Schedule
                                 (MW)
  1.              Vyasi            120          Dehradun            Yamuna           May 2014
  2.             Lakhwar           300          Dehradun            Yamuna             2016
  3.              Kishau           660          Dehradun             Tons              2023
                                                                                  Work on hold
                                                                                  due          to
  4.           Pala Maneri         480          Uttarkashi         Bhagirathi     environment
                                                                                  issues in river
                                                                                  Bhagirathi
  5.           Bharon Ghati        381          Uttarkashi         Bhagirathi      Same as above
  6.        Bowla Nandprayag       300           Chamoli           Alaknanda           2016
  7.      Nand Pyayag Langasu      100           Chamoli           Alaknanda           2017
  8.              Tamak lata *             280         Chamoli          Dhauliganga   2016
  9.       Sirkari Bhyol Rupsiabagar       210        Pithoragarh        Goriganga
 10.              Sela Urthing             230        Pithoragarh       Dhauliganga
 11.              Taluka Sankri            140        Uttarkashi           Tons
 12.              Rishiganga I             70          Chamoli          Rishiganga
 13.              Rishiganga - II          35          Chamoli          Rishiganga
PROJECTS UNDER DEVELOPMENT (Up to 25 MW)
           S.No                     Name of project                 Capacity(MW)
       2               Asiganga I                             4.5
       3               Asiganga II                            3.0
       4               Kaliganga I                            4.0
       5               Kaliganga II                           6.0
       6               Kalidigad                              9.0
       7               Madhyamaheshwar                        15
       8               Sobla-I                                8
                       Total                                  53.0 MW
                                        Western Region
   1. Goa:
The Department does not have its own generation and purchases power from the
Central Sector Power Stations of the National Thermal Power Corporation. Besides
this, the department also purchases power of 16 Mw from Reliance Industries Ltd.,
Sancoale.
   2. Daman and DIU:
The UT of Daman & Diu does not have its own power generation. The bulk power
supply is drawn from the Central Sector Power Stations in Western Region through
GETCO Grid.
   3. Gujarat:
Following projects of GSECL are under implementation:
S.n          Project              Capacity (MW)             Commissioning
 o                                                             Date
1     Sikka TPS Extn             2*250                      Unit   2   - 06/12
                                                            Unit   3   - 08/12
2     Pipavav Energy Private     2*600                      Unit   1   - 08/13
      Limited                                               Unit   2   – 12/13
Following Projects are under various stages of Planning:
            1 4X800 MW     Coal Based Units at Kuchhadi, Dist. Porbandar
            2 2X800 MW     Coal Based Units at Sinor, Ta. Sinor, Dist. Vadodara
            3 2X800 MW     Coal Based Units at Dahej, Dist. Bharuch
            4 2X1000 MW    Gas Based Power Plants in North Gujarat
    4. Madhya Pradesh:
Thermal projects in planning stage:
      S.n            Project                 Capacity
       o
      1    Banasagar TPP             2 X 800 MW
      2    New Birsingpur TPS Distt: 2 X 500 MW or 1 X 500
               Umaria                                MW or 2 X 250 MW
        3      Amarkantak Extn Unit 6                1 X 250 MW
               Distt : Annupur
        4      Shahpura Project Distt -              1000 MW
               Jabalpur
        5      Shree Singaji TPP –I (Malwa TPP )     2*600 MW
State Projects in Planning Stage - Hydel Projects
         S.n                 Project                            Capacity
           o
         1      Sone HPS Distt Sidhi                   5X20MW
         2      Gandhi Sagar HEP Mandasaur             4X40MW
         3      Kanhan HPS Distt Chindwara             2X45MW
         4      Chambal Extn                           270 MW
                Stage-II
                (i) Devipura (120 MW)
                (ii) Jaitpura (40 MW)
                (iii) Gujjapura (40 MW)
                (iv) Barsala (70MW)
    5. Maharashtra:
Ongoing:
   •   Chandrapur TPS Unit 8 & 9 (2 x 500 MW) - Trial operation of Unit 8 is
       expected by Dec. 2012 followed by Unit 9 by March 2013.
   •   Parli TPS Unit 8 (1 x 250 MW - against existing 2 x 20 MW derated capacity
       units, netcapacity addition : 210 MW). Trial operation is scheduled by Jan.
       2012
   •   Koradi TPS Unit 8, 9 & 10 (3 x 660 MW - Unit 8 is against the existing 4 x 105
       MWderated capacity units - Net capacity addition 1560 MW). The Trial
       operation of Unit 8 is scheduled by Dec.2013 followed by Unit 9 by June
       2014and Unit 10 by Dec. 2014.
Future Projects:
1. Uran Gas Based Combined Cycle Power Plant (1220 MW): (Block-I : 406
MW, Block-II:
814 MW).The trial operation of Block I (406 MW) is expected by June 2013
followed by Block II (814 MW) by September 2013.
2. Bhusawal TPS Unit 6 (1 x 660 MW against existing 55 MW capacity
units at Paras &
Bhusawal - Net capacity addition: 550 MW): Trial operation is expected by June
2015.
3. Nashik TPS Unit 6 (1 x 660 MW against existing 2 x 125 MW derated
capacity units – Net
capacity addition - 410 MW) :
Future Projects through Joint Venture – 9240 MW:
   •   Latur Coal Based Unit 1&2 (2 x 660 MW) or Gas based CCPP Block-
       I & II (2 x 750
MW): the trial operation of the project is expected as under:
(i) Coal based: Unit 1 by June-2015 & Unit 2 by December- 2015 or
(ii) Gas based: Block-I by August 2013 and Block-II by November-2013.
Joint Venture through PPP (Public-Private Participation):
   •   Dhopawe TPS Project Unit – 1 to 3 (3 x 660 MW) :
   •   Dondaicha TPS Unit – 1, 2, 3, 4 & 5 (5 x 660 MW) :
   •   Coal based Thermal Power Project near Kanpa (Tal.Nagbhid, Dist.
       Chandrapur) (2x660 MW) - Planning stage
   •   Coal based Thermal Power Project in Gondia District (2 x 660 MW) -
       Planning stage
  6. Chhattisgarh:
Ongoing:
  •   Korba tpp west extension 500MW – Commissioning schedule 06/12
  •   Marwa tpp – 2*500MW Janjgar - chamba - Commissioning schedule Unit
      1 –sep 12, unit 2 – Nov 12
Future Projects:
                          Southern Region
  1. Andhra Pradesh:
Future Projects:
  •   Rayalaseema TPP Unit-6 (600 MW) - commission by September,
      2013.
  •   Gas based Station near Karimnagar (3x700 MW): 1st Block (700
      MW) will be completed by March, 2013.
  •   IGCC Plant at Vijayawada TPS (182 MW): Unit is programmed to
      commission by September, 2013.
  •   Sattupally TPS (600 MW): Unit is programmed to commission by
      March, 2014.
  •   Vadarevu TPP Stage-I (1600 MW)
  •   Srikakulam TPS (2400 MW)
  •   Polavaram HEP (12x80 MW): First four units will be commissioned
      by September, 2014 and the balance 8 units at an interval of 2 months
      thereafter.
  •   Nuclear Power Plant in Kadapa District JV with Apgenco with Npcil
  2. Karnataka:
Ongoing:
  •   Bidadi Combined Cycle Power Plant: 1400   MW – Unit is programmed to
      commission by 2013
  3. Kerela:
                                     ON GOING SCHEMES
                                     (Undertaken by KSEB)
      Sl. No.      Name of Project                        Power in MW Energy in MU
          1.       PALLIVASAL EXTENSION SCHEME            60           153.9
          2.       THOTTIYAR HEP                          40           99.0
          3.       POOZHITHODE SHEP                       4.80         10.97
          4.       RANNI-PERUNAD SHEP                     4.0          16.73
          5.       CHATHANKOTTUNADA-II SHEP               6.0          14.76
          6.       VILANGAD SHEP                          7.5          22.63
          7.       PEECHI SHEP                            1.25         3.315
          8.       SENGULAM AUGMENTATION                               85.0
                   SCHEME
          9.       ADYANPARA SHEP                         3.5          9.01
      PROJECTS TENDERED FOR IMPLEMENTATION BY KSEB
      Sl. No. Name of Project                           Power in MW   Energy in MU
      1         ATHIRAPILLY HEP                         163           233
      2              MANKULAM HEP                       40            82
      3         KARAPUZHA DAM TOE SHEP                  0.5           2.054
      4         ANAKKAYAM SHEP                          7.5           22.83
      5         PERUMTHENARUVI SHEP                     6.0           25.77
      6         BARAPOLE SHEP                    15               36
      PROJECTS IN PIPELINE
      Sl. No.    Name of Project                            Power in MW
      1          Kakkayam Small HEP                         3.0
      2          Poringalkuthu SHEP                         24.0
      3          Chimmony Small HEP                         2.5
      4          Sengulam Tail Race Project                 3.6
      5          Pazhassi Sagar HE Project                  20.0
      6          Chembukkadavu Stage III                    6.0
      7          Peruvannamoozhy                            7.0
      8          Upper Kallar Project                       2.0
      9          Peechad Project                            3.0
      10         Thumboormuzhi                              8.0
      11         Western Kallar                             5.0
      12         Koodam                                     4.5
      13         Chinnar                                    24.0
      14         Sengulam Extn. Scheme                      48.0
      15         Olikkal                                    4.5
      16         Poovaramthodu                              2.7
  4. Tamilnadu:
Ongoing:
NTPC-TNEB joint venture)
  •   Vallur Thermal Power Station: Unit III (500MW) - commission by Nov
      2012
  •   Udangudi Thermal Power Station:
      Unit I (800MW) - commission by Mar.2013
      Unit II (800MW)- commission by Sep.2013
Future:
  1. ETPS ANNEXE 1X 600 MW: commission by Jan 2014
  •       Establishment of Ennore SEZ project of 2x800MW coal based
          supercritical thermal power plant in the ash dyke of North
          Chennai (Kattupalli) :the project is scheduled to be completed by 2015-16.
  5. Pondicherry:
  The bulk power supply is drawn from the Central Sector Power Stations and
  other state electricity board. PPCL had had invited bidders to build a 500MW coal
  based project. The last date for the prequalification was July 2009.
                                         Eastern Region
  1. Bihar:
Ongoing:
  2. Barauni TPS Extension Under Bihar SEB: (2x250 MW) the project is scheduled
     to be completed by 2013-14
  3. Muzaffarpur TPS Extension - Under Kanti Bijlee Utpadan Nigam Ltd.- JV of
     Bihar SEB & NTPC Ltd.
          2x195 MW extension at Muzaffarpur TPS (2013-14)
          IPP Power-Stations under Case-2: Tariff based Bidding
      S.no            Project              Capacity         Expected Schedule
      1      Buxar Bijlee         2x660 MW   2015-16
             Company Pvt. Ltd. at
             Chausa, Buxar Dist.
      2      Lakhisarai Bijlee    2x660 MW   2015-16
             Company Pvt. Ltd. at
             Kajara, Lakhisarai.
      3      Pirpainti Bijlee     2x660 MW   2015-16
             Company Pvt. Ltd. at
             Pirpainti, Bhagalpur
             District
      IPP Power Stations (MOU Signed with BSEB)
      1         M/s Jas Infrastructure    2x660 MW    2014-15
                Capital Pvt. Ltd.,        +
                Nagpur at Banka           2x660 MW
                (Bhagalpur)
      2         M/s Vikas Metal &         500 MW      Firm has postponed their
                Power Ltd., Kolkata,                  project activities till the
                at Begusarai.                         allotment of coal block and
                                                  suitable land by BIADA.
   3       M/s Nalanda Power      4x500 MW in     2014-15
           Company Ltd.           two phases
           Kolkata at Pirpainti
           (Bhagalpur)
   4       M/s Adhunik Power &    2x500 MW in     2014-15
           Natural Resources      two phases
           Ltd., Kolkata, at
           Lakhisarai/Bhagalpur
           .
Other IPP projects approved by State Investment Planning Board (SIPB)
   S.n   Project                        Capacit Expected
   o                                    y       Schedule
   1     M/s Subhas Projects &          1200 M      13th Plan
         Marketing Ltd., Kolkata, at    W
         Lakhisarai.
   2     M/s IL&FS, New Delhi, at       500 MW      13th Plan
         Motipur (Muzaffarpur)
   3     M/s India Power Corporation    1650 M      13th Plan
         Ltd., Kolkata                  W
   4     M/s Cement Manufacturing       500 MW      13th Plan
         Company Ltd., Kolkata, at
         Kahalgaon (Bhagalpur)
   5     M/s Essar Power, Ranchi        1800 M      13th Plan
                                        W
   6     M/s Usha-Martin, New Delhi,    1200-       13th Plan
         at Kahalgaon (Bhagalpur)       1320
                                        MW
   7     M/s East-West Power            1000 M      13th Plan
         Generation Co. Ltd.,           W
         Maharashtra at Kahalgaon,
         Bhagalpur
   8     M/s Triton Energy Ltd.,        1320 M      13th Plan
         Gurgaon, Haryana, at Kochar,   W
         Aurangabad.
   9     M/s Krishak Bharti Co-         1320 M      13th Plan
         operative Ltd., New Delhi.     W
   10    NPCIL proposed for             4x700 M     -
         installation of 4x700 MW       W
         Nuclear Power Plant at
         Rajauli, Nawada District.
  2. Jharkhand:
New projects:
  1. 1000 MW thermal power plant at Patratu
  2. 1000 MW thermal power plant in Santhal Pargana region
  3. 1000 MW thermal power plant linked with Maurya coal block (210 MT) to be
     allocated to Jharkhand/JSEB under tariff based competitive bidding
Bihar State Hydroelectric Power Corporation Limited:
Ongoing Projects IN BIHAR:
S.n                       Project                      Capacity
  o
1      Bathnaha Phase-I Small Hydel Project         8 MW
2      Nirmali Small Hydel Project                  7 MW
3      Dhoba Small Hydel Project                    2x1000 KW
4      Katanya Small Hydel Project                  2x1000 KW
5      Mathauli Small Hydel Project                 2x400 KW
6      Barwal Small Hydel Project                   2x800 KW
7      Walidad Small Hydel Project                  1x700 KW
8      Dehra Small Hydel Project                    2x500 KW
9      Sipaha Small Hydel Project                   2x500 KW
Projects in Jharkhand:
  1.   North Koel Hydroelectric Project (2x12 MW)
  2.   Chandil Dam H.E. Project (2x4 MW)
  3.   Tenu-Bokaro Link Canal H.E.P. (1x1 MW)
  4.   Sadani Hydroelectric Project (2x500 KW)
  5.   Lower Ghaghari Small Hydroelectric Project ( 2x200 KW)
  6.   Netarhat Small Hydroelectric Project ( 1x40 KW)
  7.   Nindighagh Demo Hydroelectric Project (1x200 KW)
  8.   Jalimghagh Demo Hydroelectric Project (1x200 KW)
Planned Project:
  1. Kanhar Pumped – Storage Hydroelectric Project –
  2. Sankh Hydroelectric Project
Proposed Big Projects
  •    Sinafdar PSS (3 x 115 MW)
  •    Panchgotia PSS (3x75 MW)
  •    Telharkund PSS (4 x 100 MW)
    •   Hathiahdah- Durgawati PSS (8 x 200 MW)
    •   Indrapuri Reservour Project (450 MW)
    •   Kohira Dam Pumped Storage (3x38 MW)
    •   Dagmara Hydroelectric Power Project
    3. Orissa:
    Hydel Project Under construction:
            S.n       Project                  Capacity
            o
            1         Potteru Small HE         2 x 3 MW
                      Project
    Hydel project Identified for Future Implementation
           S.n                   Project                          capacity
             o
           1         Sindhol Complex
           a         Deogaon                            3 x 30 MW
           b         Kapasira                           3 x 30 MW
           c         Godhaneswar                        4 x 30 MW
           2         Middle Kolab Hydro Electric        285 MW
                     Project
           3         Tel Integrated Project             To be assessed during DPR stage
           4         Lower Vansadhara Project           To be assessed during DPR stage
           5         Balijori Hydro Electric Project    160 MW
           6         Salki Hydro electric Project       96 MW
           7         Khadago Project                    To be assessed during DPR stage
           8         Uttel & Roul Integrated Project    To be assessed during DPR stage
           9         Mahanadi-Brahmani River Link       150 MW
           10        Barmul Hydro Electric Project      60 MW
Private- Thermal projects:
S.n     Project                   Company              Capacity    Commissioning
o                                                                  Schedule
1       Kamalanga TPP             GMR Kamalanga        3*350       Unit 1 - 04/12
                                  Energy ltd                       Unit 2 – 06/12
                                                                   Unit 3 – 08/12
2       Derang TPP                JITPL                2*600       Unit 1 - 12/11
                                                                   Unit 2 – 02/12
3       Ind.Bharat      Energy    Ind.Bharat           2*350       Unit 1 - 12/11
        TPP                       Energy                           Unit 2 – 02/12
    4. West Bengal:
The West Bengal Power Development Corporation Ltd. 2 Units of 500 MW each-Unit
No.3 & 4
                                      North and Eastern region:
   1. Assam, Arunachal Pradesh, Meghalaya and Nagaland :
The government has envisaged to establish a number of small Hydel projects
   2. Tripura:
   •    Tripura CCPP Village :Palatana, Distt:Udaipur (Tripura) -OTPC (JV of ONGC,
        Tripura State and IL&FS) –
               Unit 1 – (363.3MW) – To be commissioned during 09/12
               Unit 2 – (363.3MW) – To be commissioned during 02/13
Proposed Capacity Addition in Generation
             105 MW CCGT Project at Chakmaghat.
             104 MW TGBPP at Manarchwak by NEEPCO.
             740 MW CCGT at Palatana by OTPC.
   3. Manipur:
New Proposals            :
A).   Proposed Micro Hydel Schemes to be implemented under Capital
Subsidy Programme.
The State Government proposes to implement/ investigate the following hydel
projects with different funding agencies. Investigation schemes for medium sized
projects are funded by Govt. of India as an Additional Plan Assistance through NEC.
The micro hydel schemes are subsidised by the Ministry of Non-Conventional
Energy Sources, Government of India. The projects not covered by the above will be
taken up under State Plan.
  Proposed       Micro        Hydel      Schemes   under   Capital   Subsidy   Programme
                                           Estimated
  Sl.      Name              of Capacity(K
                                           Cost(Rs. in Present status
  No.      Project              W)
                                           lakhs)
  1.       Gelnel - II         2 x 100       115.51        DPR prepared and submitted to
  2.       Tuipaki             2 x 250       256.59        Govt.
  3.      Haipi       2 x 50         91.80
  Total :             800            463.90       Clearance from Forest and
                                                  Environment
                                                  angles awaited for submission to
                                                  MNES
B).     Schemes proposed for survey and investigation
The following schemes are being taken up under the State Sector.
                     i) Medium/Small Hydro Electric Projects:
                                   Estimated
  Sl.    Name        of Capacity(K
                                   Cost(Rs. in Present status
  No.    Project        W)
                                   lakhs)
                                                    Under     Detail  Survey    and
  1.     Irang           4 x 15 MW    186.55        Investigation
                                                    (DSI) with NEC fund.
                                                    NEC fund is awaited for
                                                    completion            of
  2.     Tuivai          3 x 17 MW    131.29*
                                                    survey and investigation work.
                                                    * Revision is in progress.
                                                    NEC fund is awaited for starting
         Maklang-
  3.                     3 x 15 MW    243.00        survey
         Tuyungbi
                                                    and investigation work.
                      ii).   Mini/Micro Hydro Electric Projects:
                                       Estimated
  Sl.     Name       of Capacity
                                       Cost (Rs. in Present status
  No.     Project       (KW)
                                       lakhs)
          Chakpi/Phunch                              Pre-Feasibility Report (PFR)
  1.                    3 x 200        6.00
          ang                                        submitted to Govt. Detail
  2.      Chakpikarong   3 x 200       6.00          Survey           and
  3.      Irang          3 x 100       4.00          Investigation (DSI) is being
                                                     taken            up
  4.      Ijai           3 x 500       5.00          as soon as the financial health
  5.      Tupul          3 x 300       4.00          of             the
  Total :                3900          25.00         state permits.
   LONG TERM FORECAST AT POWER STATION BUSBARS (UTILITIES)
State                 Electrical Energy Requirement (GWh)             Peak Electric Load (MW)
                    2011 -2012 2016 - 2017       2021-2022     2011 -2012 2016 - 2017      2021-2022
Delhi                36292.545       52762.386    73481.328       6092.409     8728.832     12069.050
Haryana              38417.069       54304.879    73838.162       6839.158     9375.160     12557.464
Himachal Pradesh      9503.908       13135.520    17657.400       1611.109     2194.159      2906.958
Jammu & Kashmir      11202.446       15271.949    21282.743       2062.737     2789.568      3856.642
Punjab               60488.861       82571.657   107342.309      11000.469    14441.277     18351.770
Rajasthan            48915.759       67767.236    92376.811       8482.079    11404.490     15100.779
Uttar Pradesh        79267.680      110664.947   150157.415      13947.013    19622.530     26833.528
Uttarnanchal          8444.717       11667.894    16191.306       1533.337     2085.410      2849.272
Chandigarh            2308.347        3366.693      4440.158       419.542      602.307       782.095
Sub Total (NR)      294841.333      411513.161   556767.632      48136.901    66582.928     89912.790
Goa                   4582.911        6879.880      9082.496       721.306     1082.827      1429.498
Gujarat              85445.226      119083.096   156841.512      14373.742    19670.034     25446.677
Chhattisgarh         21784.878       33076.392    45115.620       3565.388     5374.867      7279.413
Madhya Pradesh       49338.498       70444.570    98986.680       8461.912    11772.241     16128.817
Maharashtra         125661.409      167226.739   219910.417      21953.740    28347.752     35944.127
D. & N. Haveli        5041.957        8204.128    12242.813        777.792     1265.600      1888.623
Daman & Diu           3004.817        4890.242      7842.185       552.088      857.119      1323.701
Sub Total (WR)      294859.697      409805.046   550021.724      47108.381    64348.650     84778.064
Andhra Pradesh       89032.490      132118.210   175590.124      14721.210    21845.290     28215.843
Karnataka            53539.620       79995.770   107470.552       8826.000    13092.380     17463.812
Kerala               19229.540       26331.640    36134.030       3528.050     4573.790      5916.364
Tamil Nadu           87221.910      134754.730   182825.156      14224.060    21975.660     29814.931
Pondicherry           4419.430        6867.800      9639.046       682.500     1060.600      1488.566
Sub Total (SR)      253442.990      380068.150   511658.908      40367.135    60432.580     80484.967
Bihar                19904.770       32857.080    58248.405       3607.000     5598.220      9567.426
Jharkhand            23408.480       36274.000    51741.061       4296.130     6604.000      9129.079
Orissa               27149.150       39095.650    63098.108       4459.000     6330.460     10074.098
West Bengal          41019.893       60228.010    84498.993       7406.850    10742.720     15071.881
Sikkim                  320.000        486.930       629.382        83.000      119.540       150.465
Sub Total (ER)      111802.293      168941.670   258215.949      19088.442    28400.908     42711.602
Assam                 7584.620       13052.660    24433.491       1443.000     2292.350      3984.588
Manipur                 931.890       1359.680      2336.809       203.000      269.940       444.598
Meghalaya             2101.000        2777.700      4015.131       428.290      542.030       751.391
Nagaland                698.000       1040.070      1505.358       152.000      222.340       318.821
Tripura               1229.000        1761.080      3180.264       282.000      386.610       666.135
Arunachal Pradesh       385.520        557.380       762.307       116.000      147.970       189.177
Mizoram                 398.481        594.690       763.662       115.249      161.750       196.033
Sub Total (NER)      13328.511       21143.260    36997.022       2536.610     3759.804      6179.947
Andman & Nicobar        343.590        536.570       779.450        76.910      118.940       131.660
Lakshadweep              40.130         58.190        67.548        11.450        16.610       19.277
Total (All India)   968658.543 1392066.048      1914508.233     152746.097 218208.593      298253.241
Top 10 states in terms of additional energy requirement in 2021-2022
compared to 2011 – 2012 is given below
S.n           State               Energy Requirement
  o                                     (GWh)
1    Tamilnadu                  95603.25
2    Maharashtra                94249.01
3    Andhra Pradesh             86557.63
4    Gujarat                    71396.29
5    Uttar Pradesh              70889.74
6    Karnataka                  53930.93
7    Madhya Pradesh             49648.18
8    Punjab                     46853.45
9    West Bengal                43479.1
10   Rajasthan                  43467.05
*based on 17th Electric Power   supply by CEA
States With a potential to Harness Hydel projects in large numbers
  1. Himachal Pradesh
  2. Punjab
  3. Uttarakhand
  4. Andhra Pradesh
  5. Kerala
  6. Entire eastern region (Bihar, Jharkhand, West Bengal, Orissa and
     Sikkim )
  7. Entire North eastern region (Assam, Arunachal Pradesh,
     Meghalaya, Tripura, Manipur, Nagaland and Mizoram)
Top 3 states in each region to come up with future projects
Northern region:
  1. Rajasthan
  2. Haryana
  3. Uttrakhand
Western Region:
  1. Maharashtra
  2. Gujarat
  3. Madhya Pradesh
Southern Region:
  1. Andhra Pradesh
  2. Tamil Nadu
  3. Karnataka
Eastern Region
  1. Bihar
  2. Jharkhand
  3. West Bengal and Orissa
North Eastern Region:
  1. Tripura
  2. Arunachal Pradesh and Manipur
     *Based on data available on respective state electricity board
12TH PLAN AND BEYOND
The Working Group on Power has recommended a plan size of about 82,200 MW for
12th Plan also. This would comprise hydro projects totaling about 30,000 MW,
thermal projects totaling 42,200 MW and nuclear projects of about 10,000 MW
capacities.