C P D A R O E 3 S B: Onstruction Roposal - Emolition ND Enovation F Xisting - Torey Uilding

The document is a construction proposal for demolition and renovation of an existing 3-story building. It provides a breakdown of the demolition, masonry, painting, electrical, and carpentry works needed and their associated costs totaling 1,503,317.00 PHP.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views2 pages

C P D A R O E 3 S B: Onstruction Roposal - Emolition ND Enovation F Xisting - Torey Uilding

The document is a construction proposal for demolition and renovation of an existing 3-story building. It provides a breakdown of the demolition, masonry, painting, electrical, and carpentry works needed and their associated costs totaling 1,503,317.00 PHP.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Blk 39 Lot 1 Northville 2, Bignay, Valenzuela City

Tel. # (02)8 939 0746 / Cel. # 0917 658 7655

CONSTRUCTION PROPOSAL – DEMOLITION AND RENOVATION OF


EXISTING 3-STOREY BUILDING
November 11, 2020

For the Project located at Baler St., San Francisco del Monte, Quezon City

Contractor proposes to furnish all labor, materials and services as listed below for the
above mention Project.

QTY DESCRIBED WORK, MATERIALS AND LABOR AMOUNT


     

1 Demolition Works ₱410,000.00


Removal of existing Non-Bearing Wall Partitions (Concrete,
1.1
Plywood & Drywall)
 
1.2 Removal of existing Ceiling  
1.3 Removal of stair case (Main Entrance)  
1.4 Removal/Hauling of all construction debris from site
2 Masonry Works ₱683,912.00 
2.1 Erection of New Partition Wall
Carry out masonry repairs to all internal and exterior wall
2.2 surrounds  
2.3 Relocation of staircase  
2.4 Slab repair and sealing for relocated staircase  
Carry out structural masonry repairs to all internal walls where
2.5
the masonry is cracked and blown  
3 Painting Works ₱409,405.00
All walls internal and exterior shall be cleaned and power
3.1
washed if needed, all cracks sealed with a masonry / tape sealer.  
All internal walls shall be patched where cracks are evident and
to be primed to with two coats BOYSEN® Permacoat™ Flat
3.2
Latex #701 and two coats of BOYSEN® Permacoat™ Latex as per
approve color  
All exterior walls shall be patched where cracks are evident and
to be primed to with two coats BOYSEN® Acrytex™ Primer
3.2
#1705 and two coats of BOYSEN® Acrytex™ Topcoat as per
approve color  
4 Electrical Works -
4.1 Reinstallation of all electrical outlets, switches and lights.  
5 Carpentry -
5.1 Make repairs to all clear storey windows  
5.2 Make repairs to all shutters and door openings  
     
     
  Material Subtotal  
  Material Tax  
  Labor Subtotal  
₱1,503,317.0
  TOTAL 0

This proposal shall be valid for 15 days

Submitted by: DECK HAVEN CONSTRUCTION

 
Derrick Noynay 
    November 11, 2020
Contractor Dated