Burnt Bricks Wall With RCC Slab (6) Classroom School Bill of Quantity (BOQ)

This document provides a bill of quantities (BOQ) for the construction of a 6 classroom school building with burnt brick walls and reinforced concrete ceiling (RCC roof). The total estimated cost of the project is 4090054 Afghanis. The building will cover an area of 308 square meters. Items included in the BOQ are site preparation, foundation excavation, stone masonry for foundation and plinth, shuttering, steel reinforcement, and other construction materials and labor.

Uploaded by

wafiullah sayed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
313 views28 pages

Burnt Bricks Wall With RCC Slab (6) Classroom School Bill of Quantity (BOQ)

This document provides a bill of quantities (BOQ) for the construction of a 6 classroom school building with burnt brick walls and reinforced concrete ceiling (RCC roof). The total estimated cost of the project is 4090054 Afghanis. The building will cover an area of 308 square meters. Items included in the BOQ are site preparation, foundation excavation, stone masonry for foundation and plinth, shuttering, steel reinforcement, and other construction materials and labor.

Uploaded by

wafiullah sayed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 28

Burnt Bricks Wall with RCC Slab (6) Classroom School Bill of Quantity (BOQ)

ID-Number 05-0504-M0042-5a
Province: Logar
District: Khoshi
Village: Yawdin
Type of Project: (6) Class Room Burnt Brick wall with RCC Roof Estimated total project cost in Afs: 4090054
Built up area(m2 ): 308.00 Cost (m2) (Afs): 13,279.40
Date: / / Cost (m2) ($): 181.91
Bold items to be filled in by tendered (A1,A2. . Etc.). Light items are for cost estimation purposes only (by CDC, FP or OC)
Title Revised Unit Total Revised
No. A* Item Quantity Unit Unit cost Total cost Contribution
Norm per unit Cost Cost
Norm Afs Afs CDC, Afs
1.00 Site Preparation &Site clearance 474.51 m2 14.00 6,643.18 14.00 6,643.18 -
A1
1.01 0.04 Site preparation, clearing site est.. 18.98 md 350.00 6,643.18 350.00 6,643.18
Preparation of site for the project, preparation of hand tools and equipment
2.00 Foundation Excavation 794.02 m3 245.00 194,536.03 245.00 194,536.03 -
A2
2.01 0.7 Unskilled labor 555.82 md 350.00 194,536.03 350.00 194,536.03
The land is ordinary soil
3.00 Stone Masonry Work for Foundation (1:5) Mortar 218.40 m3 2,832.85 618,706.90 2,723.65 594,857.14 -
3.01 1.1 Stone including transportation 240.24 m3 700.00 168,171.39 700.00 168,171.39
3.02 0.378 Sand 82.56 m3 1,200.00 99,068.24 1,200.00 99,068.24
A3 3.03 91 Cement (M: 250) 19874.80 kg 9.00 178,873.20 7.80 155,023.44
3.04 80.5 water 17581.55 liter 0.50 8,790.78 0.50 8,790.78
3.05 0.5 Skilled labor on site 109.20 md 800.00 87,361.76 800.00 87,361.76
3.06 1 Unskilled labor on site 218.40 md 350.00 76,441.54 350.00 76,441.54
Stone should be crushed mountain stone, sand and water is clean, cement should not be more than 3 months old, the cement - sand proportion will be considered
4.00 Stone Masonry Work for Kursi(1:5) Mortar 23.21 m3 3,006.85 69,800.69 2,897.65 67,265.73 -
4.01 1.1 Stone including transportation 25.54 m3 700.00 17,874.70 700.00 17,874.70
4.02 0.378 Sand 8.77 m3 1,200.00 10,529.82 1,200.00 10,529.82
A4 4.03 91 Cement (M: 250) 2112.46 kg 9.00 19,012.18 7.80 16,477.22
4.04 80.5 water 1868.72 liter 0.50 934.36 0.50 934.36
4.05 0.56 Skilled labor on site 13.00 md 800.00 10,399.82 800.00 10,399.82
4.06 1.36 Unskilled labor on site 31.57 md 350.00 11,049.81 350.00 11,049.81
Stone should be crushed mountain stone, sand and water is clean, cement should not be more than 3 months old, the cement - sand proportion will be considered
A5 5.00 Total Shuttering 473.75 m2 250.00 118,436.90 250.00 118,436.90
6.00 Steel working (Bottom , Top ) 7683.375 kg 72.72 558,750.40 69.72 535,700.27 -
6.01 Steel bar 6 mm kg -
6.02 Steel bar 8 mm 1859.025 kg 60.00 111,541.50 57.00 105,964.43
6.03 Steel bar 10 mm 63 kg 60.00 3,780.00 57.00 3,591.00
6.04 Steel bar 12 mm 3875.55 kg 60.00 232,533.00 57.00 220,906.35
A6 6.05 Steel bar 14 mm 1732.5 kg 60.00 103,950.00 57.00 98,752.50
6.06 Steel bar 16 mm 136.5 kg 60.00 8,190.00 57.00 7,780.50
6.07 Steel bar 18 mm 16.8 kg 60.00 1,008.00 57.00 957.60
6.08 Steel bar 20 mm kg 60.00 - 57.00 -
6.09 0.007 Wire 1 mm 53.783625 kg 96.00 5,163.23 96.00 5,163.23
6.10 0.012 Skilled labour on site 92.2005 md 800.00 73,760.40 800.00 73,760.40
6.11 0.007 Unskilled labour on site 53.783625 md 350.00 18,824.27 350.00 18,824.27
The steel should be without rust, the tensile stress of steel is 2400 kg/cm2,
7.00 RCC of (Top , Bottom Ring Beam & Slab) 81.4 m3 7,057.50 574,591.06 6,577.50 535,511.54 -
7.01 0.435 Sand 35.42 m3 1,200.00 42,498.98 1,200.00 42,498.98
7.02 0.865 Gravel 70.42 m3 1,200.00 84,509.46 1,200.00 84,509.46
A7 7.03 400 Cement (M: 200, 1:1.5:3) 32566.27 kg 9.00 293,096.39 7.80 254,016.87
7.04 155 water 12619.43 liter 0.50 6,309.71 0.50 6,309.71
7.05 0.7 Skilled labour on site 56.99 md 800.00 45,592.77 800.00 45,592.77
7.06 3.6 Unskilled labour on site 293.10 md 350.00 102,583.74 350.00 102,583.74
7.07 water for curring 0.00 liter -
The thickness of the plastering should not be less than 1.5 cm, at least 10 days curing, sand and water is clean, cement is fresh
8.00 Burnt Brick Masonry Work for Wall 110.78 m3 5,832.75 646,169.59 8,566.75 949,050.33 -
8.01 520 Brick including transportation 57607.16 pcs 7.00 403,250.15 6.80 391,728.72
8.02 0.27 Sand 29.91 m3 1,200.00 35,893.69 12,000.00 358,936.95
A8 8.03 65 Cement (M: 120) 7200.90 kg 9.00 64,808.06 7.80 56,166.99
8.04 57.5 water 6370.02 liter 0.50 3,185.01 0.50 3,185.01
8.05 0.65 Skilled labor on site 72.01 md 800.00 57,607.16 800.00 57,607.16
8.06 2.1 Unskilled labor on site 232.64 md 350.00 81,425.51 350.00 81,425.51
Well Burnt Brick will be used, the Sand and Water is clean, the cement is not older than 3 months
9.00 Filling with soil and compaction 70.68 m3 265.50 18,766.36 115.50 8,163.90 -
A9 9.01 1 Soil 70.68 m 3 150.00 10,602.47 -
9.02 0.33 Unskilled labor on site 23.33 md 350.00 8,163.90 350.00 8,163.90
Soil filling should be well compacted
10.00 Filling from Bolder 15 cm of floor 47.76 m3 615.50 29,394.43 615.50 29,394.43 -
A10 10.01 1 500.00 23,878.50 500.00 23,878.50
Bolder 47.76 m3
10.02 0.33 Unskilled labor on site 15.76 md 350.00 5,515.93 350.00 5,515.93
Stone or gravel can be used for filling
11.00 Doors + windows for classrooms 88.04 m2 2,200.00 193,679.20 2,200.00 193,679.20 -
11.01 Window(1) 38.76 m2 2,200.00 85,272.00 2,200.00 85,272.00
11.02 Window(2) 5.88 2,200.00 12,936.00 2,200.00 12,936.00
A11 11.03 Window(3) 3.28 2,200.00 7,216.00 2,200.00 7,216.00
11.04 Door(1) 16.50 2,200.00 36,300.00 2,200.00 36,300.00
11.05 Door(2) 2.54 2,200.00 5,588.00 2,200.00 5,588.00
11.06 Door(3) 9.90 2,200.00 21,780.00 2,200.00 21,780.00
11.07 Door+Window(1) 11.18 2,200.00 24,587.20 2,200.00 24,587.20
The timber is the best quality available locally or near market, the hardware is China or Garman made
A12 12.00 Instalition of Burnt brick pieces ,T= (7-12) with all necessary work 33.32 m3 1,700.00 56,646.13 1,700.00 56,646.13

13.00 Chimney Cover 6.00 No 427.00 2,562.00 450.33 2,702.00 -


A13 13.01 0.7 Iron sheet 4.20 Guage 560.00 2,352.00 560.00 2,352.00
13.02 0.1 Skilled labor on site 0.60 md 350.00 210.00 350.00 350.00
A14 14.00 Electrical Work 1.00 Lump sum - -
15.00 inside cement plaster 873.30 Sqm. 186.55 162,914.02 183.43 160,189.33 -
15.01 0.01 Sand 8.73 m3 1,200.00 10,479.59 1,200.00 10,479.59
15.02 2.6 Cement (M: 250 1:5) 2270.58 kg 9.00 20,435.21 7.80 17,710.51
A15 15.03 2.3 water 2008.59 liter 0.50 1,004.29 0.50 1,004.29
15.04 0.1 Skilled labour on site 87.33 md 800.00 69,863.96 800.00 69,863.96
15.05 0.2 Unskilled labour on site 174.66 md 350.00 61,130.97 350.00 61,130.97
15.06 water for curring 0.00 liter -

16.00 Making of blackboard with cement mortar (1:3) with special paint. 43.20 M/L 228.55 9,873.36 2,388.30 9,671.18 -

16.01 Making wooden frame for blackboard 43.20 Sqm. 30.00 1,296.00 30.00 1,296.00
16.02 0.01 sand 0.43 Cum 1,200.00 518.40 1,200.00 518.40
A16
16.03 3.9 Cement (M:400, 1:3) 168.48 kg 9.00 1,516.32 7.80 1,314.14
16.04 2.9 water 125.28 liter 0.50 62.64 0.50 62.64
16.05 0.1 Skilled labor on site 4.32 md 800.00 3,456.00 800.00 3,456.00
16.06 0.2 Unskilled labor on site 8.64 md 350.00 3,024.00 350.00 3,024.00
A17 17.00 Wooden frame for Expansion Joint 0.24 m3 26,000.00 6,297.20 26,000.00
18.00 PCC (under stone, floor, stairs, pavement) 65.8 m3 5,654.00 372,028.79 5,354.00 352,289.02 -
18.01 0.465 Sand 30.60 m3 1,200.00 36,715.96 1,200.00 36,715.96
18.02 0.93 Gravel 61.19 m3 1,200.00 73,431.93 1,200.00 73,431.93
A18 18.03 250 Cement (M:150) 16449.81 kg 9.00 148,048.25 7.80 128,308.48
18.04 145 water 9540.89 liter 0.50 4,770.44 0.50 4,770.44
18.05 0.65 Skilled labor on site 42.77 md 800.00 34,215.59 800.00 34,215.59
18.06 3.25 Unskilled labor on site 213.85 md 350.00 74,846.61 350.00 74,846.61
18.07 water for curring 0.00 liter -
Under PCC there will be a layer of sand, the cement is fresh, the sand is washed, the water is clean, the proportion of cement-sand is considered, at least 10 days curing
19.00 Pointing of stone work 1:3 mortar 14.94 m2 202.05 3,017.82 197.37 2,947.92 -
19.01 0.01 Sand 0.15 m3 1,200.00 179.23 1,200.00 179.23
A19 19.02 3.9 Cement (M:400, 1:3) 58.25 kg 9.00 524.25 7.80 454.35
19.03 2.9 water 43.31 liter 0.50 21.66 0.50 21.66
19.04 0.17 Skilled labor on site 2.54 md 800.00 2,031.30 800.00 2,031.30
19.05 0.05 Unskilled labor on site 0.75 md 350.00 261.38 350.00 261.38
the proportion of cement - sand is a must, cement is not older than 3 months, sand and water is clean
20.00 Out cement plaster 327.84 Sqm. 186.55 61,158.55 183.43 60,135.69 -
20.01 0.01 Sand 3.28 m3 1,200.00 3,934.08 1,200.00 3,934.08
20.02 2.6 Cement (M: 250 1:5) 852.38 kg 9.00 7,671.46 7.80 6,648.60
A20 20.03 2.3 water 754.03 liter 0.50 377.02 0.50 377.02
20.04 0.1 Skilled labour on site 32.78 md 800.00 26,227.20 800.00 26,227.20
20.05 0.2 Unskilled labour on site 65.57 md 350.00 22,948.80 350.00 22,948.80
20.06 water for curring 0.00 liter -
21.00 Gutter work 18.00 M/L 200.00 3,600.00 200.00 3,600.00 -
21.01 gutter work 18.00 M/L 200.00 3,600.00 200.00 3,600.00
A21
21.02 Skilled labor on site 0.00 md -
21.03 Unskilled labor on site 0.00 md -
22.00 White washing inside with 75% emulsion 873.30 Sqm. 69.95 61,087.30 84.25 73,575.48 -
22.01 0.26 plastic paint 227.06 kg 95.00 21,570.50 150.00 34,058.68
A22
22.02 0.05 Skilled labor on site 43.66 md 800.00 34,931.98 800.00 34,931.98
22.03 0.015 Unskilled labor on site 13.10 md 350.00 4,584.82 350.00 4,584.82
23.00 White washing outside with100% emulsion 327.84 Sqm. 89.45 29,325.29 110.25 36,144.36 -
23.01 0.26 plastic paint 85.24 kg 170.00 14,490.53 250.00 21,309.60
A23
23.02 0.05 Skilled labor on site 16.39 md 800.00 13,113.60 800.00 13,113.60
23.03 0.015 Unskilled labor on site 4.92 md 350.00 1,721.16 350.00 1,721.16
A24 24.00 Making of handrail 8.00 M/L 1,800.00 14,400.00 1,800.00 14,400.00

25.00 Esogam ( a kind of roofing material for insulation of roof) 644.21 m2 249.75 160,890.45 249.75 160,890.45
A25 25.01 1.2 Esogam 773.05 m2 200.00 154,609.44 200.00 154,609.44
25.02 0.01 Skilled labor on site 6.44 md 800.00 5,153.65 800.00 5,153.65
25.03 0.005 Unskilled labor on site 3.22 md 350.00 1,127.36 350.00 1,127.36
Thickness of esogam should not be les than 3mm
26.00 Total G.I Sheet 24 Gauge 20.92 m2 644.00 13,473.77 644.00 13,473.77 -
A26
26 1.05 G.I Sheet 21.97 m2 560.00 12,302.14 560.00 12,302.14
0.07 Skilled labor 1.46 md 800.00 1,171.63 800.00 1,171.63
A27 27.00 Personal 1.00 md 90,000.00 90,000.00 90,000.00 90,000.00
It includes foreman (engineer), store keeper and guard assigned by community and paid by CCNPP
A28 28.00 Hand tools, stationary, transportation 1.00 Lump sum 10,505.00 10,505.00 10,505.00 10,505.00
1
29.00 Site clearance 400.00 m2 7.00 2,800.00 7.00 2,800.00 -
A29
29.01 0.02 Unskilled labor on site 8.00 md 350.00 2,800.00 350.00 2,800.00
Total
Total cost of (A1+A2+A3+A4+A5+A6+A7+A8+A9+A10+A11+A12+A13+A14+A15+A16+A17+A18+A19+A20+A21+A22+A23+A24) 4,090,054

Electrical Works 96,220.00 96,220.00

Total cost of(A1+….+A24+ Electrical Greand Total) 4,186,274 4,376,629


Contingency (2-5)% 0.02 83,725
Grand Total 4,270,000
* A is amendment norm (if the existing norm does not fit to the site condition please ignore it and write the actual norm to this column and follow the procedure)

Note: Any other needed activities which is not included here can be added
ab (6) Classroom School Bill of Quantity (BOQ)

Contribution
CCNPP, Afs
6,643.18

194,536.03

618,706.90

ll be considered
69,800.69

ll be considered
118,436.90
558,750.40
-

574,591.06
646,169.59

18,766.36

29,394.43

193,679.20

56,646.13

2,562.00

-
162,914.02

9,873.36

6,297.20
372,028.79

, at least 10 days curing


3,017.82

61,158.55

3,600.00

61,087.30

29,325.29

14,400.00

160,890.45

13,473.77

90,000.00

10,505.00

2,800.00

4,090,054
4,090,054

96,220.00

4,186,274

83,725
4,270,000
Bill of Quantity (BOQ) 3 Set Latrine Burt Breck Wall+RCC Slab
Province : Logar
District : Khoshi
Project Name : Yawdin

Type of Project: School Building Estimated total project cost in Afs:


Built up area(m2 ): 30.77 Cost (m2) (Afs):
Date: 17/11/2018 Cost (m2) ($):
Bold items to be filled in by tendered (A1,A2. . Etc.). Light items are for cost estimation purposes only (by CDC, FP or OC)
Title Revised Unit Revised total
No. Unit cost Total cost
Norm per unit A* Item Quantity Unit cost unit cost
Norm Afs Afs
1.00 Site Preparation &Site clearance 64.3 m2 14.00 899.64 14.00 899.64
A1
1.01 0.04 Site preparation, clearing site est.. 2.6 md 350.00 899.64 350.00 899.64
Preparation of site for the project, preparation of hand tools and equipment
2.00 Foundation Excavation 20.18 m3 227.50 4,589.81 227.50 4,589.81
A2
2.01 0.65 Unskilled labor 13.1 md 350.00 4,589.81 350.00 4,589.81
The land is ordinary soil
3.00 Stone Masonry Work (1:5) Mortar 26.4 m3 2,832.85 74,919.17 2,723.65 72,031.20
3.01 1.1 Stone including transportation 29.1 m3 700.00 20,363.86 700.00 20,363.86
3.02 0.378 Sand 10.0 m3 1,200.00 11,996.16 1,200.00 11,996.16
A3 3.03 91 Cement (M: 200) 2406.6 kg 9.00 21,659.74 7.80 18,771.78
3.04 80.5 water 2128.9 liter 0.50 1,064.47 0.50 1,064.47
3.05 0.5 Skilled labor on site 13.2 md 800.00 10,578.63 800.00 10,578.63
3.06 1 Unskilled labor on site 26.4 md 350.00 9,256.30 350.00 9,256.30
Stone should be crushed mountain stone, sand and water is clean, cement should not be more than 3 months old, the cement - sand proportion will be considered
4.00 Brickwork 1:5 M250 13.53 m3 5593.20 75657.12 5405.84 73122.77
4.01 500 Brick including transportation 6763.3 pcs 7.00 47343.19 6.80 45990.53
4.02 65 water 879.2 liter 0.50 439.62 0.50 439.62
A4 4.03 72.80 Cement 984.7 Kg 9.00 8862.64 7.80 7680.96
4.04 0.30 Sand 4.1 m3 1,200.00 4869.59 1200.00 4869.59
4.05 0.62 Skilled labor on site 8.4 md 800.00 6709.21 800.00 6709.21
4.06 1.57 Unskilled labor on site 21.2 md 350.00 7432.88 350.00 7432.88
well Baked brick will be used, the sand and water is clean, the cement is not older than 3 months
5.00 RCC Concret (1 :1.5 : 3) Ring Beam on top of Stone 10.61 m3 7,057.50 74,914.79 6,577.50 69,819.63
5.01 0.435 Sand 4.6 m3 1,200.00 5,540.99 1,200.00 5,540.99
5.02 0.865 Gravel 9.2 m3 1,200.00 11,018.29 1,200.00 11,018.29
A5 5.03 400 Cement (M: 200, 1:1.5:3) 4246.0 kg 9.00 38,213.71 7.80 33,118.55
5.04 155 water 1645.3 liter 0.50 822.66 0.50 822.66
5.05 0.7 Skilled labour on site 7.4 md 800.00 5,944.35 800.00 5,944.35
5.06 3.6 Unskilled labour on site 38.2 md 350.00 13,374.80 350.00 13,374.80
A5

5.07 water for curring 0.0 liter -


6.00 PCC (Over Stone Masonry, floor, stairs, pavement) 5.891 m3 5,654.00 33,308.82 5,354.00 31,541.46
6.01 0.465 Sand 2.7 m3 1,200.00 3,287.29 1,200.00 3,287.29
6.02 0.93 Gravel 5.5 m3 1,200.00 6,574.57 1,200.00 6,574.57
A6 6.03 250 Cement (M:120) 1472.8 kg 9.00 13,255.19 7.80 11,487.83
6.04 145 water 854.2 liter 0.50 427.11 0.50 427.11
6.05 0.65 Skilled labor on site 3.8 md 800.00 3,063.42 800.00 3,063.42
6.06 3.25 Unskilled labor on site 19.1 md 350.00 6,701.23 350.00 6,701.23
6.07 water for curring 0.0 liter -
Under PCC there will be a layer of sand, the cement is fresh, the sand is washed, the water is clean, the proportion of cement-sand is considered, at least 10 days curing
7.00 Steel Reinforcement 906.5 kg 72.72 65,920.7 72.7 65,920.7
7.01 1.05 Steel 14mm 278.6 kg 60.00 16,718.40 60.00 16,718.40
7.02 1.05 Steel 10mm 432.0 kg 60.00 25,920.03 60.00 25,920.03
A7 7.03 1.05 Steel 8mm 195.8 md 60.00 11,750.08 60.00 11,750.08
7.05 0.007 Wire 1mm 6.3 Kg 96.00 609.15 96.00 609.15
7.06 0.012 Skilled labour 10.9 md 800.00 8,702.16 800.00 8,702.16
7.07 0.007 Unskilled Labour 6.3 md 350.00 2,220.86 350.00 2,220.86
the steel should be without rust, the tensile stress of steel is 2400 kg/cm2,
8.00 Shuttering Work 102.09 m2 250.00 25,522.0 250.0 25,522.0
A8
8.01 1 Tatol Shuttring for Ring Work 102.1 m2 250.00 25,522.03 250.00 25,522.03
9.00 Burnt piece brick 2.25 m3 1,700.00 3,823.17 1,700.00 3,823.17
A9
9.01 1 Burnt piece brick ### 1,700.00 3,823.17

Steel Doors & Window Work with all necessray


10.00 Work (Glass,Hinge,Frame,Oil Painting and 9.6 m2 2,200.00 21,120.0 2,200.0 21,120.0
A10 instalition)

10.01 1 Window+Door 9.6 m2 2,200.00 21,120.00 2,200.00 21,120.00


11.00 Pointing of stone work 1:3 mortar 34.1 m2 98.05 3,347.72 93.37 3,187.93
11.01 0.01 Sand 0.3 m3 1,200.00 409.72 1,200.00 409.72
A11 11.02 3.9 Cement (M:400, 1:3) 133.2 kg 9.00 1,198.42 7.80 1,038.63
11.03 2.9 water 99.0 liter 0.50 49.51 0.50 49.51
11.04 0.04 Skilled labor on site 1.4 md 800.00 1,092.58 800.00 1,092.58
11.05 0.05 Unskilled labor on site 1.7 md 350.00 597.50 350.00 597.50
the proportion of cement - sand is a must, cement is not older than 3 months, sand and water is clean
12.00 Filling from Soil in one layer 10.6 m3 265.50 2,824.63 115.50 1,228.79
A12 12.01 1 Soil with gravel 10.6 m 3 150.00 1,595.83 -
12.02 0.33 Unskilled labor on site 3.5 md 350.00 1,228.79 350.00 1,228.79
Soil filling should be well compacted
13.00 Filling from Gravel 4.4 m3 615.50 2,717.36 615.50 2,717.36
A13 13.01 1 Bolder 4.4 m 3 500.00 2,207.44 500.00 2,207.44
13.02 0.33 Unskilled labor on site 1.5 md 350.00 509.92 350.00 509.92
Stone or gravel can be used for filling
14.00 Isogam Work 32.1 m2 240.00 7,710.60 240.00 7,710.60
A14
14.01 1.2 Isogam 38.6 200.00 7,710.60 200.00 7,710.60
15.00 Plastering 1:4 M300 146.5 m2 189.04 27,693.43 186.64 27,341.85
15.01 0.0167 Sand 2.4 m3 1,200.00 2,935.76 1,200.00 2,935.76
15.02 2 Cement ( 1:5) 293.0 kg 9.00 2,636.91 7.80 2,285.32
A15 15.03 2 water 293.0 liter 0.50 146.50 0.50 146.50
15.04 0.1 Skilled labour on site 14.6 md 800.00 11,719.61 800.00 11,719.61
15.05 0.2 Unskilled labour on site 29.3 md 350.00 10,254.66 350.00 10,254.66
15.06 water for curring liter
TheThickness of the plastering should not be less than 1.5 cm, at least 10 days curing, sand and water is clean, cement is fresh
16.00 White washing inside with70% emulsion 77.4 m2 69.95 5,416.00 84.25 6,523.21
16.01 0.26 Plastic Paint 70% inside 20.1 kg 95.00 1,912.44 150.00 3,019.65
A16
16.02 0.05 Skilled labour 3.9 md 800.00 3,097.07 800.00 3,097.07
16.03 0.015 Unskilled labour on site 1.2 md 350.00 406.49 350.00 406.49
Inside the rooms two layer plastic .
17.00 Out White washing with100% emulsion 68.8 m2 89.45 6,150.36 110.25 7,580.51
17.01 0.26 Plastic Paint 100% inside 17.9 kg 170.00 3,039.08 250.00 4,469.24
A17
17.02 0.05 Skilled labour 3.4 md 800.00 2,750.30 800.00 2,750.30
17.03 0.015 Unskilled labour on site 1.0 md 350.00 360.98 350.00 360.98
Outside the block two layer plane .
18.00 Making of hand rail for ramps 18.68 m/l 465.64 8,698.14 1,800.00 7,857.54
18.01 5.5 Profile 6.0 m 1,200.00 7,200.00 1,200.00 7,200.00
A18 18.02 3 wleding bar 56.0 pcs 20.00 1,120.80 5.00 280.20
18.03 0.02 Skilled labour on site 0.4 md 800.00 298.88 800.00 298.88
18.04 0.012 Unskilled labour on site 0.2 md 350.00 78.46 350.00 78.46
The railing should be according to design
19.00 PVC 4' pipe ventilation 15.00 m/l 200.00 3000.00 200.00 3000.00
A19
19.01 1 PVC 4' pipe ventilation 15.00 m/l 200.00 3000.00 200.00 3000.00

20.00 GL pipes 2' with slope 6.00 m 200.00 1,200.00 200.00 1,200.00
A20
20.01 1 GL pipes 2' with slope 6.00 m 200.00 1,200.00 200.00 1,200.00

21.00 Water closet 1.0 Ea 1000 1000 1000 1000


A21
21.01 1 Water Closet for Disabled people 1 Ea 1000 1000 1000 1000
22.00 GI Sheet Gauge 22 4.94 m2 560 2766.4 560 2766.4
A22
22.01 1 GI Sheet Gauge 22 4.94 m2 560 2766.4 560 2766.4
23.00 Gutters work (Vertical from GI sheet 24 gauge 10X12 1.0 m2 196.00 196.00 1,001.56
A23 23.01 0.7 Steel sheet 0.7 m2 200.00 140.00 140.00 98.00
23.02 0.07 Skilled labour 0.1 md 800.00 56.00 56.00 3.92
24.00 Site clearance 64.3 m2 7.00 449.82 7.00 449.82
A24
24.01 0.02 Unskilled labor on site 1.3 md 350.00 449.82 350.00 449.82
A25 25.00 Personal 1.0 md 10,000.00 10,000.00 - -
It includes foreman (engineer), store keeper and guard assigned by community and paid by CCNPP
A26 26.00 Hand tools, stationary, transportation 1.0 Lump sum 9,684.00 9,684 9,648 9,648
It includes hand tools like shovel pick axe etc, stationary for CDC use and transportation cost for CDC travel to the market or bank.
Grand Total 473,530
Contingency (2-5)% 0.02 9,471
Total cost of (A1+A2+A3+A4+A5+A6+A7+A8+A9+A10+A11+A12+A13+A14+A15+A16+A17+A18+A19+A20+A21+A22+A23+A24) 483,000 451,604

* A is amendment norm (if the existing norm does not fit to the site condition please ignore it and write the actual norm to this column and follow the procedure)
Note: Any other needed activities which is not included here can be added
483000
15,697
218.02

Contribution

CDC, Afs CCNPP, Afs


- 899.64

- 4,589.81

- 74,919.17

75,657.12

- 74,914.79
- 33,308.82

- 65,920.7

25,522.0
25,522.03
3,823.17
3,823.17

21,120.0

- 3,347.72

- 2,824.63

- 2,717.36

- 7,710.60
27,693.43

5,416.00

6,150.36

8,698.14

0 3000.00

1,200.00

1,000.00

2,766.40

196.00

- 449.82

10,000

9,684

473,530
9,471
483,000
Bill of Quantity ( BoQ) Shallow tube Well
ID-number: 05-0504-M0042
Province: Logar
District: Khoshi
Village: Yawdin
Project Type:shallow tube well , Depth ( 80 ) m , Dia ( 14" ) Inch or ( ) Cm
Date: 17/11/2018 Estimated Total Project Cost in Afs. =
1 m of Tube well in Afs =
Bold Items to be filled by Tendering (A1,A2,A3……..An). light items for cost estimation only by (CDC,PMU) CCNPP
Numb Unit cost Total cost
Norm/

Titl Quanti Depth Total Revised Unit


unit

No A* norm Item Unit er of Unit


e ty of well Quality Cost
well Afs Afs

A1 1.00 Site preparation 10.00 m 2


55 1 10 m 2
14.00 140.00
1.01 0.04 Site preparation, clearing site etc. 0.40 md 55 1 0.4 md 350 140.00 350.00
Preparation of site for the project, preparation of hand tools etc
A2 2.00 Well drilling( 14" )dia by ( Percusion ) Rig 60.00 m 55 1 55 m 1,600.00 88,000.00 1,550.00
2.01 Well drilling 1.00 m 55 1 55 m 1600 88000 1550
Well drilling activities included to drilling machine transportation,accomodation and personal
A3 3.00 PVC pipe 4'' (class B) installation 1.00 m 55.0 1.00 55.00 m 317.49 17,461.75 1,860.78
3.01 PVC pipe dia 4'' (class B) 35.000 m 35.0 1 35 m 260.00 9,100.00 260.00
3.02 PVC filter pipe dia 4'' (class B) 20.000 m 20.0 1 20 m 260.00 5,200.00 260.00
3.04 Glue for pipes connection 40.000 gr 55.0 1 2200 gr 1.00 2,200.00 2,200.00
3.05 Screw for PVC pipe and filter connection 2.000 num 55.0 1 110 num 0.50 55.00 0.50

3.06 Gravel(size 3 - 6 mm) for gravel pack 0.031 m


3
20 1 0.62 m3 1,200.00 744.00 1,200.00

3.07 Soil (clay) for filling around PVC pipe over the gravel pack 0.031 m
3
35.0 1 1.085 m3 150.00 162.75 150.00

3.08 Clay seal 0.002 m


3
1 0 m3 -
Drilling rig transportation , accommodation ,well drilling, installation of pipes, gravel pack, filling back ,clay seal with personal is included to well drilling procedure
A4 4.00 Soak pit and dry stone patching under the apron 1.56 m3 55.0 1 1.555 m3 2,295.50 3,569.50 2,295.50
4.01 0.46 Sand 0.7 m
3
55.00 1.00 0.72 m
3
1200 858.36 1200
4.02 0.93 Mix size of gravel 1.4 m
3
55.00 1.00 1.45 m3 1200 1735.38 1200
4.03 0.65 Unskilled labor 1.0 md 55.00 1.00 1.01 md 350 353.7625 350
4.04 0.5 Skilled labor on site 0.778 md 55.00 1 0.78 md 800.00 622 800
A5 5.00 PCC apron and drain M :150 ,1:2:4 1.10 m3 55.00 1 1.1 m3 7620.9 8,382.99 6,548.90
5.01 0.39 Sand 0.4 m3 55.00 1.00 0.42 m3 1,200.00 509.52 1,200.00
5.02 0.77 Gravel 0.8 m3 55.00 1.00 0.85 m3 1,200.00 1,017.72 1,200.00
5.03 240 Cement 264.0 kg 55.00 1.00 264.00 kg 9.00 2,376.00 8.70
5.04 130 Water 143.0 liter 55.00 1.00 143.00 liter 0.50 71.50 0.50
5.05 0.65 Skilled labor on site 0.7 md 55.00 1.00 0.72 md 800.00 572.00 800.00
5.06 4.25 Unskilled labor on site 4.7 md 55.00 1.00 4.68 md 350.00 1,636.25 350.00
5.07 2.00 Mould ,Wooden sheet size (30x30x200 cm) 2.2 m 55.00 1.00 2.20 m 1,000.00 2,200.00 500.00
the cement is fresh, the sand and water is clean, the concrete mix should be considered
A6 6.00 Hand pump installation 1.00 num 55.00 1.00 1.00 num 25,893.75 25,893.75 48,905.41
Hand pump ( Pamir ) Wieght 18kg With Double Hung 60m Zinc Rod
6.01 1.00 num 55.00 1 1 num 10,500.00 10,500.00 10,500.00
6.02 PVC pipe dia 2'' 3.8 kg /3m 1.08 m 55.00 1 59.125 m 150.00 8,868.75 8,868.75
6.03 Rod for hand pump 1.08 m 55.00 1 15 m 70.00 1,050.00 1,050.00
6.04 Rope for hand Pump 2.50 m 55.00 1 137.5 m 10.00 1,375.00 1,375.00
6.05 Hand pump installation 1.00 num 55.00 1 1 num 1,500.00 1,500.00 1,500.00
6.06 Glue for pipes connection 20.00 gr 55.00 1 1100 gr 1.00 1,100.00 1,100.00
6.07 Skilled labor 1.00 md 55.00 1 1 md 800.00 800.00 800.00
6.08 Unskilled labor 2.00 md 55.00 1 2 md 350.00 700.00 700.00
High quality of PVC pipe class B should be used, and high quality of hand pump should be selected
A7 7.00 Well chlorination 300.00 gr 55.00 1 300.00 gr 12.67 3,800.00
7.01 Well disinfection with bleach chlorine (300g/well) after completion 300 gr/round 55.00 1 300 gr/round 10.00 3,000.00 7.00
7.02 Skilled labor 1 md 55.00 1 1 md 800.00 800.00 800.00
Total cost of activities(A1+A2+A3+A4+A5+A6+A7)
Lump Lump
A8 8.00 Hand tools, stationary, transportation 1.00 55.00 1 1.00 4,713.00 4,713.00
sum sum

lump sum 55.00 1 lump


transportation sum 2,000.00 2,000.00
8.01 1.00 1.00 2,000.00
8.02 Pickaxe 2.00 num 55.00 1 2.00 num 300.00 600.00 600.00
8.03 Shovel 1.00 num 55.00 1 1.00 num 300.00 300.00 300.00
8.04 Wheel barrow 0.00 num 55.00 1 0.00 num 2,700.00 - -
8.05 Mortar basin 1.00 num 55.00 1 1.00 num - - -
lump
Stationary lump sum 55.00 1 sum
8.06 1.00 1.00 363.00 363.00 363.00
8.09 Signboard for project 1.00 num 55.00 1 1.00 num 450.00 450.00 450.00
8.10 Signboard for each well 1.00 num 55.00 1 1.00 num 1,000.00 1,000.00 1,000.00
It includes hand tools like shovel pick axe etc, stationary for CDC use and transportation cost for CDC travel to the market or bank.
Total cost of procured items, services and goods (A8+…………+A10) 4,713
Total cost of (A1+…..+A10) 4,713
Contingency (2-5)% 0.02 94
Total cost 4,807
0
Note-1: the assumed BoQ is calculated for one meter well depth, the required BoQ would be obtained after multiplying written quantity with actual depth of well
but some activities are exceptional and out of this procedure and considered for whole one well, for example site preparation, number of pump ,bottom ring of well, top ring, top ring cover,RCC beam , chlorination
,Hygiene education,personal,hand tools, stationary and transportation.
* amount of gravel pack, clay pack and clay seal is calculated for 10" diameter of well and 4" diameter of pipe , if size of both dia change amount of mentioned items are changeable.
Note-2: Any other needed activities which is not included here, can be added.
4,807

Revised Contribution
Total Unit
cost CDC, Afs NSP, Afs

350.00 - 140.00
350.00

85,250.00 - 88,000.00
85250

102,342.85 - 17,461.75
9,100.00
5,200.00
88,000.00
1.00

37.20

4.65

3,569.50 - 3,569.50
858.36
1735.38
353.7625
622
7,203.79 - 8,382.99
509.52
1,017.72
2,296.80
71.50
572.00
1,636.25
1,100.00
48,905.41 0 25,893.75

10,500.00
9,533.91
1,134.00
3,437.50
1,500.00
22,000.00
800.00
1,400.00

2,900.00 - 3,800.00
2,100.00
800.00

- -

4,713.00 0.00 4,713.00

2,000.00

600.00
300.00
-
-

363.00

450.00
1,000.00

- 4,713
- 4,713
94
255,235 4,807
‫برنامۀ ملی میثاق شهروندی‬
‫وزارت احیا و انکشاف دهات‬
‫ادارۀ مستقل ارگان های محلی‬
‫فورمۀ ‪ 8‬برنامۀ ملی میثاق شهروندی – فورمۀ پروپوزل(پیشنهاد) پروژۀ فرعی‬

‫خوشی‬ ‫‪:‬ولسوالی‬ ‫لوګر‬ ‫‪:‬والیت‬


‫موسسۀ همکار(صرف برای شوراهای مناطق شهری مربوط ادارۀ مستقل ارگانهای محلی)‬

‫‪:‬کود نمبرشورای انکشافی قریه یا شهری‪/‬کلسترشورای انکشافی‪/‬شورای گذر‬

‫یاوالدین‬ ‫‪:‬نام شورا‬

‫ا•فغ•انی_‬ ‫‪4905055‬‬ ‫مجموع وجوۀ مالی تعیین شده برای شورای انکشافی شهری‪/‬شورای گذر‬

‫ا•فغ•انی_‬ ‫‪4,905,055‬‬ ‫____ ‪ :‬مجموع وجوۀ مالی تعیین شده برای شورای انکشافی قریه‬

‫پروژه‬ ‫یک‬ ‫‪:‬تعداد پروژه های که تحت این وجوه مالی پیشنهاد شده است‬

‫‪05-0504-M0042-5a‬‬ ‫‪:‬کود نمبر پروژۀ فرعی‬


‫تعلیم وتربیه‬ ‫‪:‬سکتور پروژۀ فرعی‬
‫اعمار تعمیرمکتب ابتدائیه‬ ‫‪:‬نام پروژۀ فرعی‬

‫بودیجه پالن شده‬ ‫متریک سوم‬ ‫متریک دوم‬ ‫متریک اول‬


‫فعالیت‬ ‫نوع دستاورد‬ ‫دست آورد ها‬
‫هر دستاورد‬ ‫مقدار‬ ‫واحد‬ ‫مقدار‬ ‫واحد‬ ‫مقدار‬ ‫واحد‬
‫تعمیرمکتب ابتدائیه ‪ 6‬صنفی با‬
‫‪4270000‬‬ ‫‪7‬‬ ‫تعداد اطاقها‬ ‫‪308‬‬ ‫مترمربع‬ ‫‪1‬‬ ‫تعداد تعمیر‬ ‫اعمار‬ ‫دستاورد اصلی‬ ‫دیوارخشت کاری وچت‬
‫اهنکانکریت‬
‫‪4807‬‬ ‫‪20‬‬ ‫ارتفاع آب‬ ‫‪55‬‬ ‫عمق چاه‬ ‫‪1‬‬ ‫تعداد چاه‬ ‫حفرکوبه یی‬ ‫دستاورد اصلی‬ ‫چاه کوبه یی‬
‫مستراح دیوارخشتی باچت‬
‫‪483000‬‬ ‫‪31‬‬ ‫مترمربع‬ ‫‪3‬‬ ‫تعداد‬ ‫اعمار‬ ‫دستاورد اصلی‬
‫آهنکانکریت‬

‫ی‬
‫)ب•••ل (‬ ‫‪:‬پروژه فرعی پیشنهادی بامصرف وجوۀ مالی برنامۀ ملی میثاق شهروندی در الویت های پالن انکشافی قریه شامل میباشد‬

‫ی‬
‫)ب•••ل (‬ ‫پروژه فرعی پیشنهادی بادرنظرداشت حداقل خدمات برنامۀ ملی میثاق شهروندی دیزاین گردیده است‬

‫‪:‬بخش الف‪ :‬تهیه جزئیات محل پروژه فرعی انتخاب شده با دالیل آن‬
‫بعد از مطالعه تخنیکی و سروی عملی در ساحه با در نظر داشت موقیعت جغرافیایی منطقه و با تفاهم با شورا و مردم قریه جای مورد نظر برای پروژه انتخاب‬
‫‪.‬گردیده که از نظر تخنیکی مشکل نداشته و هیچ نوع موانع از قبیل تعمیر‪-‬دیوار‪-‬درخت وغیره برای پانیل ها نداشته و از نظر امنیتی نیز مناسب میباشد‬
‫‪ :‬کوردینات جی پی اس محل انتخاب شده‬

‫‪N : 33.93917‬‬ ‫‪ :‬عرض البلد‬ ‫‪E : 69.36603‬‬ ‫‪:‬طول البلد‬


‫تصویر محل و پالن های ساحوی قبل از ساختمان که نشان دهنده مکمل محل انتخاب شده و عالمات مشخصه قریه های همجوار باشد‪ ،‬غرض برسی و مقایسه بعدی‬
‫‪.‬ضمیمه گردد‬
‫‪ :‬الف ‪ :‬تصویر محل که نشان دهنده تمام مشخصات ساحه باشد عالوه گردد‬

‫‪:‬ب‪ :‬پالن ساحوی عمومی و پالن ساحوی حدود اربعه مکتب باید به شکل بسیار دقیق ترسیم و عالوه گردد‬

‫بخش ب ‪ :‬انجینری ‪ /‬سروی و دیزاین تخنیکی‬

‫مکتب‌‌ذکورآخندخیل درقریه یاوالدین ولسوالی خوشی اعمار میګردد که فاصله آن از مرکزولسوالی بطرف شرق درحدود ‪ 20‬کیلومتر‪ .‬این مکتب دارای ‪6‬‬
‫صنف تدریسی ویک اطاق اداری میباشد ‪ ،‬بیت الخال ‪ 3‬سیته و یک بمبه دستی نیزبرای این مکتب در نظر ګرفته شده است باساس نورم معارف دیوار احاطه‬
‫‪.‬برای مکاتب ابتدائیه اعمارنمیګردد‬
)‫ (به اساس رهنمود تخنیکی تا جایکه قابل تطبیق باشد‬:‫ گستره فعالیت ها‬/‫ بل های قیمت دار‬:‫بخش ج‬
‫قیمت فی واحد محاسبه‬
‫قیمت محاسبه شده مجموعی‬ ‫مقدار‬ ‫واحد‬ ‫ غیر خدمات مشوره ای‬/‫ کارها‬/ ‫اجناس‬ #
‫شده‬
270,500 1200 225.4 m3 Sand
1
17,421 560 31.1 kg G.I Sheet
2
162,320 200 811.6 kg Esogam
3
822,188 9 91354.2 kg Cement (M: 250 1:5)
4
28,477 0.5 56954.5 lit water
5
17,530 170 103.1 kg White washing outside with100% emulsion
6
23,483 95 247.2 kg White washing inside with 75% emulsion
7
3,740 200 18.7 m gutter work
8
9,902 1 9902.00 Lumpsum Hand tools, stationary, transportation
9
100,000 1 100000.0 md Personal
10
206,410 700 294.9 m3 Stone including transportation
11
179,031 1200 149.2 m3 Gravel
12
143,959 250 575.8 m2 Total Shuttering
13
7,200 1200 6.0 m Profile
14
1,121 20 56.0 kg wleding bar
15
1,000 1000 1.0 no Water closet
16
214,799 2200 97.6 m2 Doors + windows for classrooms
17
60,469 1700 35.6 no Burnt brick pieces
18
515,391 60 8589.9 kg Steel working
19
12,198 150 81.3 m3 soil
20
26,086 500 52.2 m3 Boldar
21
450,593 7 64370.5 no Burnt Brick Masonry
22
5,772 96 60.1 kg Wire 1 mm
23
1,200 200 6.0 m GL pipes 2' with slope
24
3,000 200 15.0 m PVC 4' pipe ventilation
25
14,400 1800 8.0 m Making of handrail
26
6,297 26000 0.2 m3 Wooden frame for Expansion Joint
27
1,296 30 43.2 m2 Making wooden frame for blackboard
28
2,200 1000 2.2 m2 Mould ,Wooden sheet size (30x30x200 cm)
29
88,000 1600 55.0 m Well drilling
30
9,100 260 35.0 m PVC pipe dia 4'' (class B)
31
5,200 260 20.0 m PVC filter pipe dia 4'' (class B)
32
3,300 1 3300.0 gr Glue for pipes connection
33
55 0.5 110.0 gr Screw for PVC pipe and filter connection
34
163 150 1.1 m3 Soil (clay) for filling around PVC pipe over the gravel pack
35
10,500 10500 1.0 no Hand pump ( Pamir )
36
8,869 150 59.1 m PVC pipe dia 2''
37
1,050 70 15.0 m Rod for hand pump
38
1,375 10 137.5 m Rope for hand Pump
39
1,500 1500 1.0 job Hand pump installation
40
3,000 10 300.0 job Well disinfection with bleach chlorine (300g/well) after completion

96,220 96220 1 job Elictrical Work

3536315 41
‫ مواد‬/ ‫=مجموع قیمت اجناس‬
521,600 800 652 ‫روزهای کاری‬ ‫مجموع کارګرفنی‬ 42
738,850 350 2111 ‫روزهای کاری‬ ‫مجموع کارګرغیرفنی‬ 43
15,000 ‫=مجموع مصارف اداری‬ 44
93,290 45
‫احتماالت‬
4,905,055 )‫ (افغانی‬:‫ محاسبه شده‬:‫مجموع قیمت عمومی‬ 46

)‫کارگر (زن‬ )‫کارگر (مرد‬ ‫روزهای کاری‬ ‫کارگر‬


√ 2111 ‫کارگرغیرفنی‬

√ 652 )‫برقی و غیره‬،‫نجار‬،‫کارگرفنی (گلکار‬

2763 ‫مجموع‬
‫‪:‬بخش د‪ :‬قیمت محاسبه شده مصارف اداری شامل ذیل است‬
‫قیمت محاسبه شده مجموعی‬ ‫قیمت فی واحد محاسبه شده‬ ‫مقدار‬ ‫واحد‬ ‫اقالم‬ ‫‪#‬‬
‫‪9000‬‬ ‫‪1000‬‬ ‫‪9‬‬ ‫نوبت‬ ‫سفر‬ ‫‪1‬‬
‫‪4500‬‬ ‫‪500‬‬ ‫‪9‬‬ ‫نوبت‬ ‫غذا‬ ‫‪2‬‬
‫‪0‬‬ ‫محل بودوباش‬ ‫‪3‬‬
‫‪500‬‬ ‫‪500‬‬ ‫‪1‬‬ ‫مجموعه‬ ‫حق الزحمه بانک‬ ‫‪4‬‬
‫‪1000‬‬ ‫مجموعه‬ ‫قرطاسیه‬ ‫‪5‬‬
‫‪15000‬‬ ‫قیمت مجموعی محاسبه شده‪ :‬افغانی‬

‫‪:‬بخش هـ‪:‬چک لست های مربوطه حفاظت محیط زیستی و اجتماعی‬


‫در صورت نخیر واضح سازید‬ ‫اسناد موجود است‬ ‫اسناد مورد نیاز‬
‫(بلی‪/‬نخیر)‬ ‫‪#‬‬
‫بلی‬ ‫محیط زیست‬ ‫‪1‬‬
‫بلی‬ ‫محیط زیست‬ ‫‪2‬‬
‫بلی‬ ‫محیط زیست‬ ‫‪3‬‬
‫بلی‬ ‫حفاظت اجتماعی‬ ‫‪4‬‬
‫بلی‬ ‫حفاظت اجتماعی‬ ‫‪5‬‬
‫بلی‬ ‫حفاظت اجتماعی‬ ‫‪6‬‬

‫‪:‬بخش و‪ :‬پالن سهم گیری شورا‬


‫یح‪l‬ا‪ll‬لتحقیقی‪ % 10‬ق‪ll‬ابلت‪lll‬طبیقمربوط ب‪lll‬ه‪ l‬موقعیت روســـــــــــــتا‪ /‬ش ‪l‬ه‪l‬ر ب‪lll‬را‪l‬یش‪ll‬ورایا‪l‬نکـــــــــــــشافی‪/‬گ‪lll‬ذر میباشد( ‪%‬‬
‫ق‪ll‬یمتمجموعیمحاســــــــــــــــبه‪ l‬ش‪ll‬ــــــــــده‪ l‬پ‪lll‬روژه‪ l‬ف‪lll‬رعیا‪l‬فغ‪l‬ان )‬

‫قیمت محاسبه شده مجموعی‬ ‫قیمت فی واحد محاسبه شده‬ ‫مقدار‬ ‫واحد‬ ‫اقالم‬ ‫‪#‬‬
‫مجموعه‬ ‫پول نقد‬ ‫‪1‬‬
‫مجموعه‬ ‫مواد ‪/‬تجهیزات ‪ /‬انتقال‬ ‫‪2‬‬
‫مجموعه‬ ‫مواد ‪ /‬تجهیزات ‪ /‬انتقال‬ ‫‪3‬‬
‫مجموعه‬ ‫مواد ‪ /‬تجهیزات ‪ /‬انتقال‬ ‫‪4‬‬
‫مجموعه‬ ‫مجموع شماره =‪2‬‬ ‫‪5‬‬
‫روز کاری‬ ‫کارگر غیرفنی‬ ‫‪6‬‬
‫روز کاری‬ ‫کارگرفنی‬ ‫‪7‬‬
‫‪0‬‬ ‫مجموع عمومی محاسبه شده سهم پالن شده شورا انکشافی‪ :‬افغانی‬

‫‪:‬بخش ز‪ :‬زمان‪ -‬تعین پالن کار‬


‫شروع تخمینی پروژه فرعی(‪ 3 ،)2019/03/01‬هفته الی یک ماهبعد از تاریخ تسلیمی پروپوزل به دفتر والیتی‬
‫ختم تخمینی ختم کار فرعی (‪ ،)2019/06/30‬در جریان اعظمی یک سال بعد از تاریخ شروع پروژه فرعی‬
‫تعداد هفته ها از شروع پروژه فرعی‬ ‫فیصدی پیشرفت مالی‪ :‬مصرف وجه‬ ‫فیصدی‬ ‫عطف ها(مراحل) که میباید تکمیل گردد‬
‫مالی‬ ‫پیشرفت‬
‫‪4‬‬ ‫‪25%‬‬ ‫فزیکی‬
‫‪25%‬‬
‫‪8‬‬ ‫‪50%‬‬ ‫‪50%‬‬
‫‪12‬‬ ‫‪75%‬‬ ‫‪75%‬‬
‫‪16‬‬ ‫‪100%‬‬ ‫‪100%‬‬
‫‪:‬بخش ح‪ :‬پالن حفظ و مراقبت‬
‫نخیر‬ ‫‪:‬کمیته فرعی حفظ و مراقبت در قریه تاسیس گردید است‬
‫‪:‬در صورت بلی ‪ ،‬اعضای ان عبارتند از‬
‫امضآ ‪ /‬شصت‬ ‫نمبر تیلفون‬ ‫ولد‬ ‫اسم مکمل‬ ‫‪#‬‬
‫‪1‬‬
‫‪2‬‬
‫‪3‬‬
‫‪4‬‬

‫ی‬
‫)ب•••ل (‬ ‫‪:‬کمیته فرعی حفظ و مراقبت توسط انجنیر ولسوالی‪/‬موسسۀ همکار آموزش دیده اند‬
‫بلی‬ ‫آیا جمع اوری پول ضروری همیشگی (شامل مصارف روغنیات‪ ،‬برق و مزد میخانیک) پروژه فرعی پیشنهاد گردیده است؟‬
‫) افغانی‬ ‫در صورت بلی‪ ،‬مقدار پول پیشنهاد شده که باید ماهوار که از هر خانوار جمع آوری میگردد چند خواهد بود (الف)به اساس سیستم عددی ( ‪ ) 1250‬ا افغانی و یا (ب) به اساس سیستم میتری هر مترمکعب (‬
‫مبلغ که غرض مصرف حفظ و مراقبت ترمیم ‪ ،‬استهالک و غیره پروژه فرعی مربوطه (خارج از مصارف فعالیت های پروژه فرعی) از هر خانوار در ماه جمع اوری و ذخیره میگردد ‪ ،‬چه مبلغی است؟ ‪ -------------‬افغانی‬
‫‪/‬آیا قیمت مجموعی حفظ و مراقبت (شامل فعالیت های پروژه فرعیو قیمت ترمیم و استهالک) پروژهفرعی قابل قبول تمام اهالی شورا انکشافی میباشد؟ بلی‬
‫‪:‬نوت‬
‫شروع تخمینی کار پروژه فرعی (باید ‪ 3‬هفته الی یک ماه بعد از تاریخ تسلیمی پروپوزل به دفتر والیتی)‬
‫ختم تخمینی کار پروژه فرعی (باید تحقق پزیر‪ /‬عملی باشد و حالت های موسمی و فصلی درنظر گرفته شود‪ ،‬مگر نباید از ‪ 12‬ماه بعد از تاریخ شروع کار پروژه تجاوز نماید)‬
‫‪ :‬نتیجه‬
‫‪:‬قیمت مجموعی پروژه فرعی قرار ذیل میباشد‬
‫تقسیمات هزینه پروژه فرعی به اساس منابع‬ ‫تقسیمات هزینه پروژه فرعی به اساس منابع‬
‫ف‬
‫ی‬ ‫‪100‬‬ ‫افغانی‬ ‫‪4,905,055‬‬ ‫از وجوه مالی‬ ‫‪٪‬فیصد‬ ‫‪99.83‬‬ ‫افغانی‬ ‫‪4,890,055‬‬ ‫هزینه پروژه فرعی‬
‫ص‬
‫د‬
‫ف‬
‫‪٪‬‬
‫ی‬ ‫‪0‬‬ ‫افغانی‬ ‫‪0‬‬ ‫از سهم شورا‬ ‫‪٪‬فیصد‬ ‫‪0.17‬‬ ‫افغانی‬ ‫‪15,000‬‬ ‫هزینه مصارف اداری‬
‫ص‬
‫د‬
‫ف‬
‫‪٪‬‬
‫ی‬ ‫‪100‬‬ ‫افغانی‬ ‫‪4,905,055‬‬ ‫هزینه مجموعی‬ ‫‪٪‬فیصد‬ ‫‪100.00‬‬ ‫افغانی‬ ‫‪4,905,055‬‬ ‫هزینه مجموعی‬
‫ص‬
‫د‬
‫‪٪‬‬
‫‪ :‬منظوری پروپوزل‬
‫به نمایندگی از شورای انکشافی قریه یاشهری‪/‬کلسترشورایا نکشافی‪/‬شورایگذر‪:‬همه ‪ 4‬نفر هیات اداری‬
‫امضا یا شصت‬ ‫بست‬ ‫نام‬
‫ریس‬
‫مرستیال‬
‫منشی‬
‫خزانه دار‬
‫تصدیق میگردد که پیشنهاد پروژه فرعی مطابق رهنمود عملیاتی تهیه گردیده و موارد فوق تایید گردید‪:‬از طرف ادارۀ مستقل ارگانهای محلی امضا های انجنیر‪ ،‬مدیر ولسوالی و مدیر والیتی موسسۀ همکار و‬
‫‪ :‬ازطرف وزارت احیا وانکشاف دهات امضاهای انجنیر ولسوالی ‪ ،‬مدیر دفتر ولسوالی انجینروالیتی‬

‫تاریخ‬ ‫امضا‬ ‫اسم‬

‫‪:‬تایید محاسب واحد اداری والیتی‬


‫تاریخ‬ ‫امضا ً‬ ‫نام‬
‫__________________________________‬

‫منظوری فوق و تایید ثبت نام شورای انکشافی قریه یاشهری‪/‬کلسترشورایانکشافی‪/‬شورای گذرتوسط‪ :‬مدیر والیتی وزارت احیا وانکشاف دهات‪/‬ادارۀ مستقل ارگان های محلی‬
‫‪:‬اسم مکمل موقف امضا‬
‫تاریخ‬ ‫امضا ً‬ ‫نام‬
‫_____________________________________‬

‫مهر واحد اداری والیتی برنامۀ ملی میثاق شهروندی‬

‫‪Stamp‬‬

‫‪: /‬تاریخ ارسال فورمه به واحد اداری والیتی(روز‪/‬ماه‪/‬سال)‬ ‫‪/‬‬ ‫‪/‬‬

‫‪/‬‬ ‫‪/‬‬ ‫تاریخ درج فورمه در دیتابیس دفتر ولسوالی‪ /‬واحداداري واليتي (روز‪/‬ماه‪/‬سال)‪/ :‬‬