Steel Structure Painting Guide
Steel Structure Painting Guide
IH
STEEL                   Attachment
PAINTING PROCEDURE
    A
          New Issue
                                                .QC Manager     Client
                               Painting Eng .
          Description   Date                    Checked By    Accepted By
    Rev
                               Prepared by
    L'
I        S T
                        Attachment
H
E         E L
                              INDEX
     A. Scope of Work
8. Reference
C. Surface Preparation
D. Coating Application
E. Painting procedure
G. Documentation
H. Inspection
I. Acceptance Criteria
J. Certification
     K. Attachment
I    STE
                           Attachment
H EL
A. Scone of work:
    This Procedure set out preparation. application & inspection requirements for painting
    and protective coating of (Platforms, staircase. penthouse, ladders, handrails, steel
    structure & stack).
B. REFERANCE:
                    Code                                       Standard
ISO 1461                                       Specs. For hot dipped galvanized
                                               coati ngs on iron and steel articles
lSO 19840                                      Methods of testin g paints
ISO 2808 Part CS                               Determination of film thickness
ISO 12944-4                                    Preparation of steel substrate before
                                               app lication of pain t
ISO 12944-7                                    Paint systems - execution and
                                               su pe rvisio n of paint work
ISO 12944-8                                    Paints systems - Develo pment of
                                               specifications for new work
Client Specification                           Approved Painting and Coating
(G RN /00/M/09- - 002/OO/00 I)                 Systems
IAHA059687 Rev.A
C. Surface Pre.R_aration:
-   Prior to blasting, the surfaces that are not to be coated (e.g. markings,
    Designation plates, flange faces, sight glasses) shall be appropriately
    Protected.
- The surfaces to be coated shall be free from contamination (e.g. welding slag,
  Welding spatter, dust, oil, grease salt, mill scale, laitance, rust, old coatings).
H EL
0. Coatine; application:
- The contractor shall insure that all the regulations regarding health protection
  and occupational safety are observed during the performance of the surface
  preparation and coating work and during the use the selected coating materials.
 supervision during all the work operation. The supervision personnel shall be
 suitably qualified and experienced. The contractor for the relevant assemblies
 shall be responsible in this connection.
-The location of the control surface for the relevant assemblies shall
 be selected by all the contracting parties together.
-All surface preparation and coating work on control surface shall be performed in
 the presence of representative of all contracting parties, who shall confirm that
 the control surface conform to the specification.
-The contractor for the coating systems shall comply with local regulations on
 health protection and occupational safety in relation to the use of solvents and
- Prior to any others test, the coating shall be subjected to a visual check should
  be limited to coaling defects (e.g. spray dazzle ,areas left uncoated ,inclusions
  of dirt, blisters , porosity ,sags ,tears ,brush marks).Areas in which the blasting
  material has remained under the coating shall be blasted again and recoated.
• The wet film thickness shall be measured on a random basis with a comb-type
  gauge immediately after applying the coating material.
- The dry film thickness shall be measured after adequate hardening or curing of
  the coating. (Calibration of gauge according to equipment manufacture).
- To observe the specified total film thickness, the thickness of each individual
  layer should be measured. .(measurement according to SSPC.)
I H
 �
STEEL
                            Attachment
D.3 Personnel:
- Qualified blasters & painters to be involved in paint activity.
D.4- Supervision:
- Qualified paint inspector to supervise paint activities and to advise for normal
  and trouble painting issues.
G. Documentation:
 The quality assurance records shall comply with the requirements laid down in
 lSO J 2944-7 & 12944-8 and by the contractor performing the coating work for
 the
  Relevant assemblies. The requisite quality assurance documents shall be as follows
  Individually for each assembly:
* Standard from for the specified coating system for each assembly.
* Standard form for the reports on corrosion-preventive work for the selected
   control Surfaces.
* Sketch showing the location of the control surfaces for the coating work.
* Technical Data Sheets relating to the coating materials specified.
H. lnsJ!ection:
    ! ---
       �
     STEEL
                                      At achment
    Check point
                                Inspection Inst.   I Standard          1            Limits           I Duration
Climatic Condition         I
     Relative          I                               ISO 8502-4  I                            .    I 3 / day
                                                   I
                               Hygrometer                                  Max 85%
     humidity Dew                                      ISO 8502-4          St Dp + 3°C(ln Door)
                               DP calculator
     point
                                                                           St   Op + 4°C(Out Door)    3 I day
  Steel temperature            Thermometer                                 1                          3 / day
                                                       ISO 8502-4 I Max 50°C
Surface preparation
     Cleonliness           I ISO Standard          I    ISO 8501       I Min Sa2 ½ or St 2 as per I Shift
                                                                           paint type
     Roughness             I Comparator            I ASTM 4417         I Fine to course              I Shift
                                                                           30-85 µm
   Paint Application
        W.F.T.                 WFTcomb                 ASTM4414            As per paint type&
                                                                                                         Shift
        D.F.T.                 OFT Digital             ASTM                specs. As per paint
                               Gauge                   1005                type& specs.
     I. Acceptance criteria:
     Refer to manufacturer data sheet & client specs...
     J. Certification:
      - All consum able certificates validity will be guaranteed upon
          individual Batch number which will be used during application.
     K. Attachments:
             I. Painting Report.
             .,   Painting procedure.
IH
STEEL
     �
                          Attachment
                              Painting System
(Steel Structural - plates - angels)
Surface Preparation
SP 10 (SSPC), SA 2 ½ (ISO 8501)
Primer Coat
Final Coat
-Climatic Condition:
- relative humidity not more than 85% .
- Maximum allowed steel temperature for paint application not more than 50 °c.
- Steel temperature to be minimum 3 °c (In Door) &4 °c (Out Door) higher than the
  Recorded dew point.
- Windy & rainy condition should stop painting activities according to iso 8502-4
  Guidance on the estimation of the probability of condensation prior to
paint Application:-
            - equipment
            - sling hygrometer
            - dew point
            - steel thermometer
            - hygrometer chart
- using whirling hygrometer according to BS-2842
- Dust and contamination rejected after sur face preparation according to BS-7079 PT.A-
ISO 8501
                   .-..
   I           &-rGi         .L
                                                                        Shot Blasting Report
                        Client: capital eas gambla limited                     I   Project : 11£HAIIIUTll>t4 Of 'f)j£ MAIN D£POT IN
                        GAMBllt
I Report No. : 01
Inspection & Tm
Consultint
  Client
..                  I Hs-       -.-eeL
                                                                                 Shot Blasting Report
                              Client: capital gas ,ambla lhnlted                       I Projei:t : RfHABIUTION OF THE MAIN D£POT IN
                              GAMBIA
I Report No. : 02
                                                                             "'
     Third Party
     Consultant
       Client
..                 IH T       io: I!L
                                                                                 Shot Blasting Report
                              Client : capital gas gambla limited                       I Projffl: R[lfABILITION Of' THE MAIN DEPOT IN
                              GAMBIA
I Report No. : OJ
                       Client; capital cas gambla limited                    Project : REHABILITION OF THE MAIN DEPOT IN
                                                                             GAMBI
                                                                                                Report Na. : 04
                   Client: capital gas gambia limited                                Project : REHABIUTION OF THE MAIN DEPOT IN
                                                                                     GAMBIA
                                                                                                      Report No. : OS
Consultant
  Client
                      .....,
             IH           &ii I-
                                                                        Shot Blasting Report
                       Cllent: capital gas gambia limited                       I Project : REHABIUTION OF THE MAIN DEPOT IN GAMBIA
                                                                                I                      Report No. : 06
Consultant
  Client
              ---
             IH S        "T E!! l!II L
                                                                             Shot Blasting Report
                        Client: capital gas 1ambla limited                                  Proltd ; REHADIUTION OF THE MAIN DEPOT IN
                                                                                            GAMBIA
Report No, : 07
Consultant
  Client
             IH---
             !!!iTE!!.l!IL
                                                                       Shot Blasting Report
Report No. : 08
 IH Steel
                                     Name
                                  Ahmed Said
                                                                               ·
                                                                               Signature             Lev.I              Date
17/02/2020
Consultant
  Client
             S
                 t1 = i
                  T      E!       !I!L
                                                                   Shot Blasting Report
Report No. : 09
Consultant
  Cllent
C
ai
- Item No .
BR-1046
                 B, R 1D47
                                                           QTY
                                                            2
                                                                                               nchor prohre
ACC
                                                                                                   ACC
                                                                                                                                  Surface Prep
Sa2.S
Sa2.S
Consultant
      Client
                 -e-
             I H WT          Gii.lii L
                                                                            Shot Blasting Report
                       Client: capital gas gambla limited                       I Project : REHABIUTION OF THE MAIN DEPOT IN
                       GAMBIA
I Report No. : 11
Consultant '
  CUent
              I HE5.-       .-e.a::L--
                                                                         Shot Blasting Report
Consultant
                                                                  ---
  Client
..                IH  s        -reei_
                                                                          Shot Blasting Report
Report No. : 13
Consultant
       Client
              ...
             IH                                                            Shot Blasting Report
                e.     ,- IE!!.L-
BR·lllS 6 ACC Sa 2. 5
Consultant
  Olent
               ....
              IH                                                           Shot Blasting Report
                !a"      T"l:::111511...
CNe nt: capital gas gambla llmlted I Project: REHABILITIDN Of THE MAIN DEPOT IN GAMBIA
I Report Na. : 15
                        Client:
                        INGAMBIAcapital gas gambla trmlted                       I ProJect: REHABILITION OF THE MAIN DEPOT
                                                                                 I                       Report No. : 16
Consultant
  Client
              ...
             IH                                                       Shot Blasting Report
               -      -raet
               Client: capital gas gambla limited                       I Proje<t: AEHABIUTION OF THE MAIN DEPOT IN GAMBIA
                                                                        I                       Report Na. : 17
                                                                  .
                                 Name                               ,                           level                Oat..
                                                                  S;ig.n.act
                                                                  u.r.e.:-
 IHStel'I                      Ahmed Said                                                                         16/02/2020
Consultant
  Client
                 111111
             I HEii "    T C:i, Iii ._
                                                                             Shot Blasting Report
I Report No. : 18
Consultant                                                                  •                                            .
  Olent
             IH         S.          ll!l!!L
                                                                             Shot Blasting Report
Cll11nt: capita! gas 1ambla llmlt11d I PfDjoct: R(HABIUTION OF THE MAIN D(PDT IN GAMBIA
Consultant
  Olent
...                IH                                                             Shot Blasting Report
                         FII..
Client: upllll... ,.mbi• limllod I Pto,ff1: l'!HAIIUTION ot tHl MAIN DIPOT11N G&MIIA
I No. : 2D
Inspection II. Te
        Client
              I• H
               M"'rlalial..-
                                                                             Shot Blasting Report
                         Client : capltal cas g mbla Umlted                  I      Project: REHABIUTION CF THE MAIN DEPOT IN GAMBIA
                                                                             I                            Repart No. : 21
Co111ultant
  Oient
..                IH S.       TCISL
                                                                               Shot Blasting Report
                              arent: capital 11as pmbla lirnlted                       I Project : REHAIILITION Ill THE MAIN DEPOT IN
                              GAMBIA
I Report No. : 22
     Consultant
       Client
              IH._      ..
                             -   ._ liiil ._
I Report No. : 01
             COL-1023                                  1                                      86                              Ace
             COL-1024                                  1                                      87                              Ace
             COL-1026                                  1                                      89                              Ace
COL-1001 1 82 Acl::
             COL-101S                                  2                                      76                              Ace
             COL-1016                                  1                                      7S                              Ace
             COL-1017                                  1                                      79                              Ace
             COL·l019                                  l                                      78                              Acl::
Consultant
  Client
               ...
              IH                                                   Painting Inspection Report
                 B      ""TeeL.
                        Olent: capital gas 1ambla limited                       I P10Ject : REHABILITIOf,I OF TttE MAIN DEPOT IN
                        GAMBIA
I Report No. : D2
  Client
               I His       -
                             -   reeL
Consultant
  Client
                   iai
              I H &"T         O:: 1:1..
                                                                    Painting Inspection Report
                        CUent: capital eas pmbla limited                         I Project: REHAIIJIUTION or THE MAIN O(POT IN
                        GJIM81A
I Repor1 No. : 04
Consultant
                                                                     ...-
  Client
                   iai
              I H m.-.         -e   I!! L.
                                                                      Painting Inspection Report
Client: capital gas i:ambla limited I Project: REHABILmON OF THE MAIN DEPOT IN GAMBIA
I Report No. : 05
Consultant
  Client
              IH•
               m-rm m        L
                                                                    Painting Inspection Report
                        Client: capital gas gambla limited                       I Project : REHABILmON OF THE MAIN DEPOT IN
                                                                                 GAMBIA
                                                                                 I
                                                                                                          Report No. : 06
 Client
             IH  5
                         -    Eii Iii    t_
                                                                        Painting Inspection Report
                        Cllent: capital gas 11:ambla llmlted                             Project : REHABlllTION OF THE MAIN DEPOT IN GAM81'
                                                                                                            R•port No. : 07
                                                                        -
Consultant
  Client
                   0
          I H  GiTC          .&L
                                                                    Painting Inspection Report
                   Oient: capital gas gambia limited                             f Project: REHABIUTION OF THE MAIN DEPOT IN
                   GAMBIA
I RepDrt No. : 08
                                   Name
                                                                             ..
                                                                         si,nature                     Level                      Date
Consultant
    Clfent
             IH eJ     '
                           - 6iliiL
                                                              Painting Inspection Report
                  Client: capital gas gambla limited                       I Project : REHAB1UTION OF THE MAIN DEPOT IN
                  GAMBIA
I Report No. : 09
             SG-4009                           5                                      85/86/89                              A«
             SG-4011                          10                                   75/8S/86/75/78                          Ace
SG-4000 20 9-0/86/84/85/86/87/8'>/81/9-0/92
                                                                           -
                                 Name                              Slp,ature                        leYel                         Date
 Client
                                                              Painting Inspection Report
              5-,-r[ii.[al._
                  Clent: capital gas gambla limited                     I ProJ•ct : REHABIUTION OF THE MAIN DEPOT IN
                  GAMBIA
I Report No. : 10
                                 Nam•                              Slcnatur e
                                                                             . ...              Level                        Date
    Client
                 -...
             I HSi       T&Eii
                                                                 Painting Inspection Report
                       arent: capital gas gambla llmlted                         ProJett : REHABIUTION OF THE MAIN DEPOT IN
                                                                                 GAMBIA
                                                                                                     Report No. : 11
             BR-1023                             l                                      84                        Ace
             BR-1024                             l                                      Bl                        Ace
Consultant
  Client
             IH&       iT
                            --
                            ll   l leL
                                                                Painting Inspection Report
                       dlent: capital gas gambla limited                           ProjHt : EHAIIIUTION OF THE MAIN DEPOT IN
                                                                                   GAMIIIA
R or1 No. : 12
                                                      Requlerd Palntln1System
finish Coat: WFT 80 µm                                                                                     finish coat:   on 50 µm
                                                            hardtopxp
Consultant
  Client
             IH   -
              a-ree1...
Report Na. : 13
BR·l027 l 75 Ace
BR-1028 l 74 Ace
BR·l029 1 79 Ace
                                                                     ""t:;J
Consultant
  Clent
              IH  &i-        rla IiiL.
                                                                  Painting Inspection Report
                   Cllent: capital gas gambia limited                        I    Prajett : REHABNJTION Of THE MAIN 0£POT IN
                                                                                  GAMBIA
I Repart No. : 14
 Client
           I H
             S"T         "E!!E!!L
                                                                Painting Inspection Report
                        Cllent: capital gas gambla limited                         Projod: REHA8111110N OF THE MAIN DEPOT IN
                                                                                   GAMBIA
Report No. : 15
BR-1002 2 75 Ace
BR-1003 1 78 Ace
BR-1012 1 75 Ace
BR•1013 1 76 Ace
BR•1014 1 85 Ace
BR·l021 1 BS Ace
Consultant
                                                                         -
  Clfent
             : f 'H
                !S       TI      !!         11!11 L
                                                                          Painting Inspection Report
                           Client; r:apltilt 1as l;a,nbla Jfmlt...t                           ""'J«t: RlffMIUTIOH 0f TME MAIN DEPOT IN
                                                                                              GAMBIA
RepDrt ND. : 16
  Client
              -.-di!!
             I H  S"'T"E           !!   ea...
                                                                   Painting Inspection Report
Cllent: capital 1n 1arnbla llmlted P,vjo<I ; alHAIIIUTlDN Df THE MAIN DEPOT .. GAMIIA
Report No.:17
Inspection & Tm
8R-10 30 2 77 Ace
BR•10 31 2 76 Ace
BR-10 32 2 75 Ace
BR-1033 2 75 Ace
BR-1034 1 BO Ace
BR-10 36 1 81 Ace
BR-1038 1 86 Ace
BR-1040 1 79 Ace
BR-1041 1 95 Ace
             BR-1042                                   1                                 96                         Ace
             BR-1043                                   1                                 76                         Ace
BR-1044 2 75 Ace
BR-104S 1 78 Ace
  Cllent
       I •H  s-rem
                                                                 Painting Inspection Report
                         Olent: capital 1•5 1ambla limited                           1'1'oJKI: Ot.lblUTION OF 111( MAUI O!PDT IN
                                                                                     GA-..
Report No. : 18
Consultant
                                                                                -r
  Client
             I .H,
              s-r,:: c:.:_
                                                                       Painting Inspection Report
                        Client: capltal gas 11ambla llmlted                          I Project : REHABIUTlON Of THE MAIN Of POT IN
                        GAMBIA
             BR•1046                                  2                                         78                            Ace
             BR·1047                                  2                                         8S                            Ace
             81\.1050                                 1                                         105                           Ace
             BR-10S1                                  1                                         136                           Ace
             BR-1052                                  1                                         10S                           Ace
BR-1054 1 7S Ace
             SG-4016                                  2                                         95                           Ace
                            -                 -
             SG-4021                                  2                                         99                           Ace
                                       Nam.                                    Slgnatu,!_!                 Lavel                      Date
                       Cllent: capltal gas gambla Hmlted                        Prol•ct : REHABIUTI0N Of THE MAIN OEPOT IN GAMBIA
                                                                                                  Report No. : 20
Consultant
                                                                  -
  Client
            I H  s-r1           11eu....
                                                                       Painting Inspection Report
                       Client: capital gas gambla lfrnlted                      I Praject: REHABILITION Of THE MAIN DEPOT IN
                       GAMBIA
I Report Na. : 21
                                                             Requlerd Palntln1System
primer Coat: WFT10D 11m                                                                                                      primer Coat: oms
                                                               penauard eNpres1
            BR-2011                                 2                                         78                              Act
             BR-2012                                2                                         75                              Ace
             BR-20 13                               1                                         78                              Ace
BR·2014 2 79 Ace
BR·201S 1 76 Ace
            BR-2016                                 2                                         84                              Ace
            BR-2017                                 1                                         86                              Ace
            BR•2018                                 6                                     84/77/86                            Ate
I Report No. : 21
Consultant
  Client
             IH  lia      "
                           -
                        Olent:
                        GAMBIA
                                 Tl81ill-
I Report Na. : 23
             BR,1063                               2                                         75                           Ace
             BR·10G4                               2                                         79                           Ace
             BR-1065                               4                                       76/79                          Ace
             BR-1066                               4                                       84/85                          Ace
             BR-1067                               16                            85/86/89/84/82/85/89/90                  At.c
  Client
           I •H
              5-r1:c.1...
                                                             Painting Inspection Report
                  Client: capital gas gambla limited                      I Project: REHABlllTION OF THE MAIN DEPOT IN
                  GAMBIA
I Report No. : 24
                                                        ""r
 IHSteel                      Ahmed Said                                                                           21/02/2020
Consultant
  Cllent
             IJ :4
               S        "T    e       !L
                                                              Painting Inspection Report
Report NP. : 25
             BR-1071                               4                                   76                    Ace
             BR-1072                               4                                   78                    Ace
             BR-1074                              26                                   77                    Ace
             BR-107S                              26                                   7S                    Ace
             BR-1076                               8                                   79                    Ace
             BR-1078                              48                                   78                    Ace
             BR-1079                              48                                   72                    Ace
             BR-1082                              24                                   75                    Ace
             BR-1083                              24                                   78                    Ace
             BR-1084                               6                                   90                    Ace
             BR-1085                              16                               76                        Ace
             BR-1086                              12                               98                        Ace
             BR-1087                              8                                95                        Ace
             BR-1088                              14                               94                        Ace
             BR-1089                              2                                75                        Ace
             BR-1090                              2                                78                        Ace
             BR-1091                              2                                95                        Ace
             BR-1092                              2                                95                        Ace
                                                                           -
             BR-1094                              74                               75                        Ace
             BR-1095                              26                               77                        Ace
Consultant
  Client
             IH  s
                         -      ee L
                                                                  Painting Inspection Report
Client: capital aas pmbla limited l'toJ.cl : AlHANlTION 01 THE MAIN DEl'OT lff CiA-.t
Rl!part Na. : 26
  Cllent
...                IH                                                     Painting Inspection Report
                     5      ,-13 ISI-
                               Client: apltal ga5 gambla                               I Project: RlHABIUllON OF lH[ MAIN 0£POT IN GAMBIA
                               limited
                                                                                       I                      Report No. : 27
                   Bfl-1101                                2                                      86                             Ace
                   BR-1102                                 7                                 82/85/86/84                         Ace
                   Pl-1011                             1                                          94                            Ace
                                           Name                                  sr1na1ure                   Level                     Date
Client: c.apltal 1as 111111N1 lin,jted I ,r otti'I: REHAIIUTION Of ltll hlAIH 01,of U'tl GAM&\
I port No. : ZS
             611-1111                                    6                                     142/132/135                                A«
             BR-1112                                    6                                      138/135/139                               Ace
Consultant
  Client
               ...
              IH                                                       Painting Inspection Report
                 s        -.-e:1:.
                                                          Requlerd Palntln1System
primer Coat: WFTlOO 11m                                                                                                    primer Coat: oms
11m
                                                               pencuard upren
Consultant
                                                                            -
  Client
             IH
             ·--------
                      -                                                Painting Inspection Report
                        Client: capital gas gambla limited                           I 1'1'0)1<1 : REH...BILITION OF THE MAIN DCPOT IN
                        GAMBIA
I Report No. : 30
                                                             Requlud Palntln1System
Hnlsh Coat: WfT 80 µm                                                                                                         finish Coat; OFT SI
                                                                   hardtop •P
             BR-1116                                  6                                      130/129/133                         Ac
                                                                                                                                  e
             BR-1117                                 6                                      129/1211/135                         Ac
                                                                                                                                 e
               PL-1034                               7                                     125/128/133/137                       Ace
               PL-1015                                l                                          152                             Ac
                                                                                                                                 e
               PL-1014                               14                               149/142/1S3/15B/154/133                    Ac
                                                                                                                                 e
             B-R 1056                                12                                  140/129/132/135/137                     Au
               PL-100S                                2                                          17S                             Ac
                                                                                                                                 e
              Pl-1001                                10                                  155/125/127/142/139                     Ac
                                                                                                                                 e
               PL-1002                               10                                  155/154/146/133/135                     Ac
                                                                                                                                 e
               PL-1003                               13                             139/135/139/138/137/136/133                  Ace
Consultant
Client
                                                  ,,
             IH IEa     ""
                             - TGi:liii&..
                                                                                   I                        Report No. :
                                                                                                            31
Consultanl
  Cllent
                       18
               I        !?!!1-
                                                                      Painting Inspection Report
H .-e=la:;JL
cnent: eilpltal gas gilmbla limited I Proj1tt : MHAIIIUTION OF lHE MAIN DEPOT IN GAMIIIA
I Report No, : 32
PL-1023 2 78 Ace
PL-1024 2 79 Ace
PL-1025 l 77 Ace
PL-1028 2 86 Ace
PL-1029 l 85 Ace
AN-2002 12 77/79/78/76/75/79
Ace
                                                               r---
Consultant
  Client
...                IH                                                  Painting Inspection Report
                     S,              L.
                     Client: capital gas gambia limited                              I Projo<t: REHABIUTION OF THE MAIN DEPOT IN
                     GAMBIA
I Report No.: 34
Consultant
        Client
              .....
             IHt::     .'TF.! F.!l
                                                                          Painting Inspection Report
                Client: capital gas gambla limited                                I    Project : REHABILITION OF THE MAIN DEPOT IN
                                                                                       GAMBIA
                                                                                  I                         Report No. : 35
Consultant
  Client
             I H  !-Tlii      l:.il_
                                                                  Painting Inspection Report
               Client: capital gas gambla limited                              I Project : R£HABlllTION OF THE MAIN DEPOT 1N
               GAMBIA
I Report No. ; 36
             SG-4017                            19                  136/138/134/132/139/137/135/136/134/142                   Ac
                                                                                                                              e
             SG-4017                            19                  129/125/126/127/128/129/125/128/129/140                   Ac
                                                                                                                               e
             SG-4017                            19                  142/14S/147/143/148/146/149/152/150/153                   Ac
                                                                                                                               e
             SG-4017                            19                  126/127/125/126/129/128/127/125/129/131                   Ac
                                                                                                                              e
             SG-4017                            20                  130/135/139/137/139/134/13S/137/145/149               Ace
                                                                                              -
                                 Name                                  slsnature                      Level                        Dale
Consultant
  Client
              IH•
             &iiiTliila1-
                                                                       Painting Inspection Report
                         CUirnt: capital ga, 1ambla limited                        I    ProJ-tt: REHABILITIDN OF THE MAIN Df PDT IN
                                                                                        llAMIIIA
                                                                                   I                       Report No. : 37
                                                                ""r
  Client
             I H- -
               B        I   : eI.,
                                                                        Painting Inspection Report
Cllent: capltal gas gambla llmlted I Project : IIEHABIUTION OF THE MAIN DEPOT IN GAMBIA
I Report No. : 38
             BR-1120                               20                    129/127/126/128/129/127/152/148/129/186                       c
             BR·l120                               20                    134/139/138/U6/135/137/139/132/130/139                     Att
Consultant
  Client
             I H- - - - -
               la>      T   I I! , a ,:! I..,.
                                                                                Painting Inspection Report
Client: capital gas gambla limited I Project: REHABILmON OFTHE MAIN DEPOT IN GAMBIA
I Report No. : 39
                                                          -                                  -              -
                                                 Naml!>                               Signature                    Level                       Date
Client: capital gas gambla limited I ProJo,;t: R£HAIIUTION OF THE MAIN D£POT IN GAMBIA
I Report No. : 40
             1111-1058                             20                   140/142/140/148/146/149/145/147/145/147                 A«
             1111-1058                             6                                     125/128/129                            Ace
- .
  Client
             IH c:      ;
                            -   -r   s;:!11._
I Report No.: 41
Consultant
  Cll11nt
               ...........
             I
             a
              H   -.-amL
                                                                        Painting Inspection Report
Cioni:upl1al 111 aambla llmlcod I l'rajiHt : lllH.UIUTION OF 11C M.ILN Pt POT 1H GAMIU.
I Repor1No. :U
              Pt-1006                               20                   125/129/125/127/128/12S/126/134/139/140
              PL-1006                               20                    Ul/48/149/148/147/146/149/149/145/152
              PL·1006                               18                   131/13S/139/l37/13S/l34/136/l32/l39/142
              PL-1007                               20                   139/13S/138/137/136/139/13S/132/134/138                        Ace
              PL-1007                               20                   1S6/152/157/139/148/149/147/14S/146/14B
              PL•l007                               25                   125/128/129/127/131/130/139/135/137/136
              PL-1008                               20                   142/143/145/145/138/135/139/137/138/132                        Ace
              Pl·lOOB                               20                   125/128/129/127/129/126/131/138/136/137
              Pl.·1008                              24               142/149/148/146/147/148/149/14S/143/IS2/1S9/157
              PL-1009                               2D                   125/130/13S/131/136/138/132/135/134/139                        Ace
              PL-1009                               20                   l'l<J/130/138/129/127/128/126/139/134/140
              PL-1009                               20                   142/149/142/148/146/147/149/145/!4S/143
              PL-1009                               20                   152/156/157/152/132/134/1S2/1S9/1S6/l54
             PL-1009                               11                               12S/129/128/132/136/135
              Pl-1012                               20                   42/145/149/ll.8/149/147/146/145/149/145                        Ace
              Pl.·1012                             20                    165/1S9/13S/13S/139/142/148/143/149/143
              PL·l0ll                              20                    125/128/129/126/127/158/153/129/143/138
             PL•1012                               2D                    130/138/139/13S/132/134/137/136/132/139
             PL-1012                               11                               142/145/146/149/142/145
                                      Name                               Sl1natur•                         Level                               Dale
                      ..                                     - - \-
 IHSleel                            Ahmed Said                              r                                                             11/DS/2020
Consultant
  Olent
                  iai
             I     STlaliilL
                                                                         Painting Inspection Report
Client: capital 1as 1ambla Hmlted I Projed : REHABILITION Of THE M,\IN DEPOT IN GAMPIA
I Repo,t No, : 43
              AN-2001                               20                            80/85/86/89/87/85/83/82/84/BS                   A«
              ,\N-2001                             12                                     75/78/79/7S{76/77                       Ace
Consultant
                                                              "'?"'
  Cllenl
            I l- i
                M T      Q   l::;r   l..-
                                                                            Painting Inspection Report
Client: capital 1a,1ambla limited I ProJ•ct: R[HABILITION OF THE MAIN DEPOT IN GAMBIA
I Report No . : 44
                                                                 Requlerd Palntln1System
finish Coat: WFT 10 II"'                                                                                                            finish Coal: OFT !
                                                                        hardtop •P
Conwflanl
  Client
                                                                                                             i .,P.--ll ;..: .,,•i 6 ll .,                                    ,   '?   ,U
            Enoineer-ing
                                                                                                                                                       xU, , ,._
                                                                                                                    _
                                                           IH                                                                                                             .
            Services                                                                                                      _, ...i.,,:."11-, �
                                                                                                                         ...»                                 HJ,:1,1
Quality Engineering Group                                                                                                     .:J.>.j, .. .)i_• ., ......
                                                                                                                              u ca:,:n. a..,,
DT, NDT :ind
C msultull   wpc:nision
           Enmne         EngioFarnhat
                  ,_. ._Fou:id  ring                       5i   ■   IE:: E: L-                                             .,..l•M1ft2ol00..,._ r:nat111a1111•
                                                                                                                                      Tllllll&Fc.................111'1.
                                       EQUIPMENT
                                 CALIBRATION CERTIFICATE
                                                           General Infonnation
    --- Calibration Date : 24/06/2019        --- Due Date : 23/06/2020
     --- Certificate No   : QEG - 206
    --- Issued For        : IDEAL HOME FOR STEEL FABRICATION
                                                            Device Description
    --- Device Calibration: Painting MC.
    --- Manufacturer        : KALTENBASH
    --- Modelffype          : KPC 2500.
    --- Serial No            550000000231
    --- Received conditions:            New     ■                        Used      D                        Renewed              D
                                                                  Results
--- Random readings of the volts and amperes were taken during the process                                                   and
-    All machine-related connections are in good condition and are free of any visible defects &
     Accuracy in di                 · acceptab            . -· - · . ·                        ""·
--- There is n ljle,ge ofhydra . . onn ectio                 air conne· ; ns     ..                         rJ                             ·            I
--We Certify · · e Reading tha' -              Been , .       ed In Acco     ce ffi , e .'..i
                                                                                         Requiremenls Of The     -
                    1r-
      Last Revi m i i . 1 fThe           1, :r,,        ure . ,•• _ e coaect. This             t         IValid ·
      e Year                  Calibratio                                      C                     For
      Starting          e Calibration Datte ess
   --- The qu           gineering group          11
                                                 respo•            e of non- :          ce with the
         Re ui. ts. fo r utine ma ,,             ce or            e1@ of breaka          ding, "El": 'ff_i.@=
         :m.m,.==r:l_-P8r=io d of Vahd1 --1s certificate. ·:;                                       " \"..=..,_·"'"'
                                                      IH
                                                                                       i.J..,P.--ll :
                                                                                                     .......
                                                                                                               I II
                                                                                         .,......a ..;1.,.:.'YIJ ·
                                                                                                                      •i & u
                                                                                                                            .,,...J "I
                                                                                                                                      .,
                                                                                                                      ._.mi,n,.::...a.u-
                                                                                                                                              .-.I
                                                                                                                                                     0 '?   tSI
--.
 Quality Engineering Group                                                                                 j                 ...,. ... ., ;..::-,J
 DT, NOT and supervision Engin ring
 Consultant Emineer ... Fou:id Far.il1.1t             5i-.-E: E:   L.                      _ ...,_ m
                                                                                                          Tai &       •-=   a:nt,t,01ete
                                                                                                                                                     ,_
                                                                                                 -      t-JIIHftkGO-. -tl1H1UN
                                          EQUIPMENT
                                    CALIBRATION CERTIFICATE
                                                      General Information
   --- Calibration Date : 24/06/2019        --- Due Date : 23/06/2020
    --- Certificate No : QEG - 207
   --- Issued For        : IDEAL HOME FOR STEEL FABRICATION
                                                      Device Description
   -- Device Calibration: SHOTBLAST MACHINE.
   -- Manufacturer          : KALTENBACH
   --- Model/Type           : SPRINT 1504.
   --- Serial No           : 11234/311242
   --- Received conditions:         •      Used                     D              Renewed             D
                                                          Results
 --- Random readings of the volts and amperes were taken during the process and were found
      Within acceptable limits .
- All machine-related connections are in good condition and are free of any visible defects &
    Accuracy in di                                        acceptab
--- There is no I                                         onnectio
--We Certify                                              Been dure ess th
     Last Revi         e Calibra
     Starting          alibration
  --- The qu       gineering gro
       Requi        for routine mAil,lllnr.e or...    evell of breakalal.redding, d& I [LP¥- iod
       of Validit
                                                         T
                                                nd pl' Jh, z. mM-,;&,llai,ptZlp-'f'f
               & F-.   GZl2540IO't8
-   (•                 (   •2   J   O   f   -SU't'fff
         ::;;;;;:;; ; ; : : ;