0% found this document useful (0 votes)
39 views3 pages

Template Cep Proposal

This proposal is submitted by three group members to their professor for a project to build a prototype DC motor speed control system using a PID controller. It will involve theoretical learning, purchasing hardware components, assembling the hardware, programming the controller, and writing a final report over a 5 week period from November 7th to December 1st. The introduction, objectives, methodology, components, and block diagram will be outlined.

Uploaded by

ubaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views3 pages

Template Cep Proposal

This proposal is submitted by three group members to their professor for a project to build a prototype DC motor speed control system using a PID controller. It will involve theoretical learning, purchasing hardware components, assembling the hardware, programming the controller, and writing a final report over a 5 week period from November 7th to December 1st. The introduction, objectives, methodology, components, and block diagram will be outlined.

Uploaded by

ubaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

COMSATS University Islamabad, Lahore Campus

Department of Electrical and Computer Engineering

Control System
Complex Engineering Problem
Proposal

Submitted to = Sir Abu Bakar Talha Jalil

Submitted by:
 Name of group member1 [Reg ID of group member1]
 Name of group member2 [Reg ID of group member2]
 Name of group member3 [Reg ID of group member3]

1|Page
A prototype of DC motor speed control system using PID
controller.
 Introduction:

 Objective:

 Methodology:

 Components:

 Block Diagram:

2|Page
Timeline:

 Week 1 (7 nov - 10 Nov)


Theoretical learning
 Week 2 (8 Nov - 10 Nov)
Purchasing hardware components
 Week 3 (11 Nov -17 Nov)
Hardware Assembling
 Week 4 (18 Nov -24 Nov)
Controller Programming
 Week 5 (25 Nov – 01 Dec)
Finishing and Final Report Writing

3|Page