Old Architectural Drawing Was Received On 22 January, 2020

The document contains two architectural drawings that were received on different dates. The more recent IFC drawing from September 2020 shows a raised toilet roof slab at an elevation of +4.715m. The older drawing from January 2020 shows the toilet roof slab at an elevation of +4.630m. There is a difference of 0.085m between the elevations shown in the two drawings. The document also contains a diagram labeling various building elements like the roof, parapet, insulation layers, and concrete slab.

Uploaded by

fayaz khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

Old Architectural Drawing Was Received On 22 January, 2020

The document contains two architectural drawings that were received on different dates. The more recent IFC drawing from September 2020 shows a raised toilet roof slab at an elevation of +4.715m. The older drawing from January 2020 shows the toilet roof slab at an elevation of +4.630m. There is a difference of 0.085m between the elevations shown in the two drawings. The document also contains a diagram labeling various building elements like the roof, parapet, insulation layers, and concrete slab.

Uploaded by

fayaz khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

IFC Architectural Drawing was Old Architectural Drawing was

received on 28 Sep, 2020 received on 22 January, 2020

Difference B/w Raised Toilet Roof Slab


· (IFC)+4.715m ,
· (Old Drawing) +4.630 m
C D E F G H · Difference: +4.715 - 4.630= 0.085m

AR.A AR.B
AR-412 AR-412 Satellite Dish
FINISHING LAYER
3 +4.715 m ROOF TOP A WATER PROOFING
PROTECTION LAYER

PLOT LINE
AR-205 +4630mm TOILET RAISED 70 MM SLOPE MIN LIGHT CONCRETE +4630mm TOILET RAISED
+4.605 m Parapet
1215

+4530mm TOP OF
pump ACU SIDE WALL ROOF FFL
PARAPET FFL 150 MM THERMAL INSULATION
ROOF FFL
Parapet +4.605 m
rete pad pump Roof 120 MM REINFORCEMENT CONCRETE SLAB

1105 110
515 300 280

300 280

WALL PUTTY AND PAINT


parapet block wall

420 325
1215

EPS 100MM THERMAL INSULATION +3780mm ROOF FFL

875
875
815

EIFS SYSTEM EXT.FINISHING


+3.500 m BOT. Roof Slab roof flashing
50

635

Clear Block work height


BOT. Roof Slab +3.500 m Clear Block work height

120
Clear Block work height
295 305

Washable paints int.wall +2850mm BOUNDARY


120mm THCK.RCC Canopy Slap (20 mm) Interior Wall Plaster TOP LVL
Block wall

4215
1810

4105
EXT. LIGHTING WALL
MOUNTED

NEIGHBOURS
Oil paints(Satin finish) WET AREA WALLS
Toilet-01
2925

2925
3000

3000

3000

3000
3010

SS Tile Trim strip


Bedroom-2 Majlis Toilet-02
2400

CERAMIC TILES WALL 300 X 300 Bedroom-1 D3


Washable paints int.wall Washable paints int.wall CERAMIC TILES WALL 300 X 300 +0.500 m FFL 002 GF 003 GF
+0.50 m
1200

+0.49 m
+0.440 m Raft Level
FFL +0.500 m
Porcelain tiles skirting (75mm)
+600mm GRD FLR FFL BED ROOM-01 TOILET
irting (75mm) Step
60 75

60 75

90 60

Raft Level +0.440 m


40 20

+200mm GATE FFL


60

60

60
50

50

60
150

+0.350 m SITE LEVELGRANITE SKIRTING


(5mm) Tile Adhesive
EPS 100MM THERMAL INSULATION ±0.00mm ROAD FFL
aluminum plinth profile
2 COATS OF BITUMINOUS PAINT ARCH'L FINISHING ( SAND ,CEMENT MOTOR/TILE FINISH)
Block wall COVER INSULATION WITH
CMU Block for Casting PROPER FINISHING MATERIAL 250mm THK. RC SLAB (RAFT)
2 COATS OF BITUMINOUS PAINT
100mm THK. LEAN CONCRETE
POLYETHYLENE SHEET VAPOR BARRIER 1200 GUAGE
100-120mm DRAINAGE FILL(25mm Stone or Boulders)
STRUCTURAL BACKFILL (95% COMPACTED)

AR.A AR.B
AR-412 AR-412

You might also like