0% found this document useful (0 votes)
202 views2 pages

D10T Maintenance Checklist Guide

This document is a maintenance checklist for a Caterpillar model D10T equipment with serial number RJG. The checklist outlines 6 maintenance items to be completed as part of a 250-hour PM 1 maintenance interval, including taking an oil sample, inspecting belts, checking fluid levels, testing and adjusting tracks, and checking additional components. Replacement part information for a scheduled oil sample is also provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
202 views2 pages

D10T Maintenance Checklist Guide

This document is a maintenance checklist for a Caterpillar model D10T equipment with serial number RJG. The checklist outlines 6 maintenance items to be completed as part of a 250-hour PM 1 maintenance interval, including taking an oil sample, inspecting belts, checking fluid levels, testing and adjusting tracks, and checking additional components. Replacement part information for a scheduled oil sample is also provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Model: D10T Customer Name:

Serial Number (Prefix/Range): RJG Equipment Number:


PM 1 (250 HOUR
Maintenance Interval: INTERVAL) Work Order Number:
Last Updated Data Date: 10/23/2020 Equipment SMU:

Parts Manual Media Number: SEBP3655 Equipment Location:

OMM Media Number: Print Date: 12/10/2020

Employee:
NOTE: THIS PLANNED MAINTENANCE CHECKLIST IS MEANT TO BE A QUICK REFERENCE ONLY. IT DOES
NOT REPLACE THE OPERATION AND MAINTENANCE MANUAL ("OMM") APPLICABLE TO YOUR CATERPILLAR
PRODUCT. THE DATA ON THIS CHECKLIST MAY BE CHANGED OR UPDATED WITHOUT NOTICE.

Checklist

Seq Instruction OK Comments

1 TAKE & ANALYZE S-O-S FROM ENGINE OIL

2 INSPECT & MAINTAIN V-BELT(S)

3 CHECK FINAL DRIVE FLUID LEVEL BOTH

4 TEST/CHECK & ADJUST TRACK ASSEMBLY BOTH

5 CHECK EQUALIZER BAR TANK IF EQUIPPED check resevoir fluid level

6 PERFORM PM 1

12/10/2020 Page 1 of 2
Part Information

Qty Part Number Description Notes Seq

1 SOS SCHEDULED OIL SAMPLE 1

12/10/2020 Page 2 of 2

You might also like