100% found this document useful (1 vote)
1K views1 page

Construction of Multi Purpose Cold Storage: Notes

The document provides a site plan for the construction of a multi-purpose cold storage facility. The plan shows the layout of the various chambers including potato chambers, a vegetable chamber, a fruits chamber, a precooling area, and drying sheds. It also labels locations for a machine room, toilet, office, and diesel generator set. Dimensions are provided for all areas in the plan.

Uploaded by

suji91
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Construction of Multi Purpose Cold Storage: Notes

The document provides a site plan for the construction of a multi-purpose cold storage facility. The plan shows the layout of the various chambers including potato chambers, a vegetable chamber, a fruits chamber, a precooling area, and drying sheds. It also labels locations for a machine room, toilet, office, and diesel generator set. Dimensions are provided for all areas in the plan.

Uploaded by

suji91
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CONSTRUCTION OF MULTI PURPOSE COLD STORAGE

3000 3000

TOILET

13600
2032
2032

D.G SET
4.7M X 6.5M
COND. TANK MACHINE ROOM X3.6M HT

9000
9.0M X 9.0M X6.0M HT

1300 1980 1980 1300 1980 1980 1300 1980 1980 1300 1300 1980 1980 1300 1980 1980 1300 1980 1980 1300

W3 W3 W3
W3

1800
1800
POTATO CHAMBER -1 POTATO CHAMBER - 2

1800
W3 W3
18.80M X 16.855M 18.80M X 16.855M

1800
1400
TOILET
W3 D1 D1

1400
W1

2000
FRUITS CHAMBER
W1
OFFICE VEGETABLE CHAMBER PRECOOLING 10.295M X 6.55M
5.010M X 6.55M 9.615M X 6.55M 4.330M X 6.55M

2000
W1

DN

1400
D D1 D1 D1
D
W3 W3 W3
NOTES :-

1900
W1 EL. 0.00 M W1 1. ALL DIMENSIONS ARE IN mm AND ALL LEVELS ARE IN m.
UNLESS STATED OTHERWISW.

2. DRAWINGS SHALL NOT BE SCALED . ONLY WRITTEN DIMENSIONS ARE TO


W1 W1 FOLLOWED.

3100
DRYING SHED DRYING SHED
3. TEMPORARY B.M SHOULD BE STRICTLY FOLLOWED.
4. CONCRETE OF GRADE M25 AND STEEL OF Fe500 SHOULD BE USED.
W STAIRCASE
W

1300
W W W W W W W W
DN

DN

500 500
SITE PLANS
500

500

2700 2700

You might also like