Structural Steel Calculations

This document provides detailed calculations for structural steel and erection work for the Port Vila Lapetasi International Multi-Purpose Wharf Development Project in Vanuatu. It includes calculations for columns, girders, beams, and other structural steel components for the administration building and wharf, listing the dimensions, weights, and quantities of materials needed. The total weight of structural steel calculated is 27.54 tons.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views11 pages

Structural Steel Calculations

This document provides detailed calculations for structural steel and erection work for the Port Vila Lapetasi International Multi-Purpose Wharf Development Project in Vanuatu. It includes calculations for columns, girders, beams, and other structural steel components for the administration building and wharf, listing the dimensions, weights, and quantities of materials needed. The total weight of structural steel calculated is 27.54 tons.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

TOA CORPORATION

THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT


DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

Unit Wt,
Description unit H, mm B, mm L, m nos kg/m Weight, kg Rem
A B C AxBxC
Administration Building

4-H.a-5.1
Structural steel incl Erection 27.54 ton

Columns
X1 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 kg 200 200 0.514 2 49.90 51.30 S-1101-3
P2 H-250x250x9x14 kg 250 250 0.511 2 71.80 73.38
X2 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 kg 200 200 0.546 1 49.90 27.25
P1 H-200x200x8x12 kg 200 200 2.562 1 49.90 127.84
P1 H-200x200x8x12 kg 200 200 0.532 1 49.90 26.55
X3 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 kg 200 200 0.544 2 49.90 54.29
P1 H-200x200x8x12 kg 200 200 2.694 1 49.90 134.43
P1 H-200x200x8x12 kg 200 200 2.682 1 49.90 133.83
X4 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 kg 200 200 0.544 2 49.90 54.29
P1 H-200x200x8x12 kg 200 200 2.694 1 49.90 134.43
P1 H-200x200x8x12 kg 200 200 2.682 1 49.90 133.83
X5 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 kg 200 200 0.544 2 49.90 54.29
P1 H-200x200x8x12 kg 200 200 2.694 1 49.90 134.43
X6 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 kg 200 200 0.544 2 49.90 54.29
P1 H-200x200x8x12 kg 200 200 1.707 1 49.90 85.18
X7 Framing Elevation / bet Y4-Y1
P1 H-200x200x8x12 kg 200 200 0.514 2 49.90 51.30 S-1101-4
P2 H-250x250x9x14 kg 250 250 0.511 2 71.80 73.38
1,404.29
Girders & Beams
X1 Framing Elevation / bet Y1-Y4
B4 H-298x149x5.5x8 kg 298 149 6.920 1 32.00 221.44 S-1101-3
B6 H-200x100x5.5x8 kg 200 100 3.090 1 20.90 64.58
B4 H-298x149x5.5x8 kg 298 149 6.880 1 32.00 220.16
X2 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
B2 H-350x175x7x11 kg 350 175 7.021 1 49.40 346.84
B2 H-350x175x7x11 kg 350 175 0.230 1 49.40 11.36
B1 H-500x200x10x16 kg 500 200 3.498 1 88.20 308.52
B1 H-500x200x10x16 kg 500 200 6.282 1 88.20 554.07
B1 H-500x200x10x16 kg 500 200 0.731 1 88.20 64.47
CB2 H-350x175x7x11 kg 350 175 1.944 1 49.40 96.03
X3 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
B2 H-350x175x7x11 kg 350 175 7.156 1 49.40 353.51
B6 H-200x100x5.5x8 kg 200 100 1.592 1 20.90 33.27
B6 H-200x100x5.5x8 kg 200 100 1.634 1 20.90 34.15
B2 H-350x175x7x11 kg 350 175 7.114 1 49.40 351.43
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
X4 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 kg 350 175 1.950 1 49.40 96.33
B2 H-350x175x7x11 kg 350 175 7.156 1 49.40 353.51

Page 1 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

Unit Wt,
Description unit H, mm B, mm L, m nos kg/m Weight, kg Rem
A B C AxBxC
B6 H-200x100x5.5x8 kg 200 100 1.592 1 20.90 33.27
B6 H-200x100x5.5x8 kg 200 100 1.634 1 20.90 34.15
B2 H-350x175x7x11 kg 350 175 7.114 1 49.40 351.43
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
X5 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
B2 H-350x175x7x11 kg 350 175 7.156 1 49.40 353.51
B1 H-500x200x10x16 kg 500 200 0.990 1 88.20 87.32
B1 H-500x200x10x16 kg 500 200 1.146 1 88.20 101.08
B1 H-500x200x10x16 kg 500 200 7.744 1 88.20 683.02
B1 H-500x200x10x16 kg 500 200 0.731 1 88.20 64.47
CB2 H-350x175x7x11 kg 350 175 1.944 1 49.40 96.03
X6 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 kg 350 175 1.944 1 49.40 96.03
B2 H-350x175x7x11 kg 350 175 4.048 1 49.40 199.97
B2 H-350x175x7x11 kg 350 175 3.078 1 49.40 152.05
B1 H-500x200x10x16 kg 500 200 6.348 1 88.20 559.89
B1 H-500x200x10x16 kg 500 200 3.307 1 88.20 291.68
B1 H-500x200x10x16 kg 500 200 0.731 1 88.20 64.47
CB2 H-350x175x7x11 kg 350 175 1.944 1 49.40 96.03
X7 Framing Elevation / bet Y1-Y4
B4 H-298x149x5.5x8 kg 298 149 6.880 1 32.00 220.16 S-1101-4
B6 H-200x100x5.5x8 kg 200 100 3.090 1 20.90 64.58
B4 H-298x149x5.5x8 kg 298 149 6.920 1 32.00 221.44
Y1 Framing Elevation / bet X7-X1
B6 H-200x100x5.5x8 kg 200 100 3.730 1 20.90 77.96
B6 H-200x100x5.5x8 kg 200 100 4.030 1 20.90 84.23
B5 H-248x124x5x8 kg 248 124 5.180 1 25.10 130.02
B6 H-200x100x5.5x8 kg 200 100 3.730 1 20.90 77.96
B5 H-248x124x5x8 kg 248 124 4.980 1 25.10 125.00
B4 H-298x149x5.5x8 kg 298 149 6.580 1 32.00 210.56
Y2 Framing Elevation / bet X7-X1
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
B2 H-350x175x7x11 kg 350 175 3.826 1 49.40 189.00
B6 H-200x100x5.5x8 kg 200 100 3.067 1 20.90 64.10
B6 H-200x100x5.5x8 kg 200 100 0.866 1 20.90 18.10
B5 H-248x124x5x8 kg 248 124 5.180 1 25.10 130.02
B6 H-200x100x5.5x8 kg 200 100 3.730 1 20.90 77.96
B5 H-248x124x5x8 kg 248 124 4.748 1 25.10 119.17
B5 H-248x124x5x8 kg 248 124 0.242 1 25.10 6.07
B2 H-350x175x7x11 kg 350 175 6.801 1 49.40 335.97
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
Y2+1860 Framing Elevation / bet X7-X1
B5 H-248x124x5x8 kg 248 124 0.485 1 25.10 12.17 S-1101-5
B5 H-248x124x5x8 kg 248 124 4.735 1 25.10 118.85 S-1101-5
B6 H-200x100x5.5x8 kg 200 100 3.770 1 20.90 78.79
B5 H-248x124x5x8 kg 248 124 3.135 1 25.10 78.69
B5 H-248x124x5x8 kg 248 124 1.947 1 25.10 48.87
Y3 Framing Elevation / bet X7-X1
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
B2 H-350x175x7x11 kg 350 175 3.826 1 49.40 189.00
B5 H-248x124x5x8 kg 248 124 3.011 1 25.10 75.58
B6 H-200x100x5.5x8 kg 200 100 0.906 1 20.90 18.94
B5 H-248x124x5x8 kg 248 124 5.180 1 25.10 130.02

Page 2 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

Unit Wt,
Description unit H, mm B, mm L, m nos kg/m Weight, kg Rem
A B C AxBxC
B6 H-200x100x5.5x8 kg 200 100 3.730 1 20.90 77.96
B5 H-248x124x5x8 kg 248 124 4.788 1 25.10 120.18
B5 H-248x124x5x8 kg 248 124 0.200 1 25.10 5.02
B2 H-350x175x7x11 kg 350 175 6.801 1 49.40 335.97
CB2 H-350x175x7x11 kg 350 175 1.948 1 49.40 96.23
Y4 Framing Elevation / bet X7-X1
B6 H-200x100x5.5x8 kg 200 100 3.730 1 20.90 77.96
B6 H-200x100x5.5x8 kg 200 100 4.030 1 20.90 84.23
B5 H-248x124x5x8 kg 248 124 5.180 1 25.10 130.02
B6 H-200x100x5.5x8 kg 200 100 3.730 1 20.90 77.96
B5 H-248x124x5x8 kg 248 124 4.980 1 25.10 125.00
B4 H-298x149x5.5x8 kg 298 149 6.580 1 32.00 210.56
Y1-1780 Framing Elevation / bet X7-X1
B8 H-250x255x14x14 kg 250 255 5.593 1 81.60 456.39 S-1101-9
B6 H-200x100x5.5x8 kg 200 100 4.055 1 20.90 84.75
B5 H-248x124x5x8 kg 248 124 5.205 1 25.10 130.65
B6 H-200x100x5.5x8 kg 200 100 3.755 1 20.90 78.48
B5 H-248x124x5x8 kg 248 124 5.005 1 25.10 125.63
B8 H-250x255x14x14 kg 250 255 8.443 1 81.60 688.95
Y4+1780 Framing Elevation / bet X7-X1 `
B8 H-250x255x14x14 kg 250 255 8.443 1 81.60 688.95
B5 H-248x124x5x8 kg 248 124 5.005 1 25.10 125.63
B6 H-200x100x5.5x8 kg 200 100 3.755 1 20.90 78.48
B5 H-248x124x5x8 kg 248 124 5.205 1 25.10 130.65
B6 H-200x100x5.5x8 kg 200 100 4.055 1 20.90 84.75
B8 H-250x255x14x14 kg 250 255 5.593 1 81.60 456.39
X7-1780 Framing Elevation / bet Y4-Y1
B8 H-250x255x14x14 kg 250 255 8.743 1 81.60 713.43 S-1101-10
B6 H-200x100x5.5x8 kg 200 100 3.115 1 20.90 65.10
B8 H-250x255x14x14 kg 250 255 8.782 1 81.60 716.61
X1+1780 Framing Elevation / bet Y1-Y4
B8 H-250x255x14x14 kg 250 255 8.783 1 81.60 716.69
B6 H-200x100x5.5x8 kg 200 100 3.115 1 20.90 65.10
B8 H-250x255x14x14 kg 250 255 8.743 1 81.60 713.43
X1-2575 / bet Y1-Y4
B7 H-150x75x5x7 kg 150 75 1.703 1 14.00 23.84 S-1101-2
B7 H-150x75x5x7 kg 150 75 2.153 1 14.00 30.14
B5 H-248x124x5x8 kg 248 124 4.400 1 25.10 110.44
B6 H-200x100x5.5x8 kg 200 100 3.115 1 20.90 65.10
B5 H-248x124x5x8 kg 248 124 4.440 1 25.10 111.44
B7 H-150x75x5x7 kg 150 75 2.153 1 14.00 30.14
B7 H-150x75x5x7 kg 150 75 1.703 1 14.00 23.84
X2+1850 / bet Y2-Y3
B6 H-200x100x5.5x8 kg 200 100 2.037 1 20.90 42.57
B6 H-200x100x5.5x8 kg 200 100 3.115 1 20.90 65.10
B6 H-200x100x5.5x8 kg 200 100 2.077 1 20.90 43.41
X5-875 / bet Y2-Y3
B6 H-200x100x5.5x8 kg 200 100 3.011 1 20.90 62.93
X6+550 / bet Y2-Y3
B6 H-200x100x5.5x8 kg 200 100 2.134 1 20.90 44.60
B6 H-200x100x5.5x8 kg 200 100 3.178 1 20.90 66.42
B6 H-200x100x5.5x8 kg 200 100 2.186 1 20.90 45.69
X6-1825 / bet Y1-Y4
B7 H-150x75x5x7 kg 150 75 1.728 1 14.00 24.19

Page 3 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

Unit Wt,
Description unit H, mm B, mm L, m nos kg/m Weight, kg Rem
A B C AxBxC
B7 H-150x75x5x7 kg 150 75 2.179 1 14.00 30.51
B5 H-248x124x5x8 kg 248 124 4.400 1 25.10 110.44
B6 H-200x100x5.5x8 kg 200 100 3.115 1 20.90 65.10
B5 H-248x124x5x8 kg 248 124 4.440 1 25.10 111.44
B7 H-150x75x5x7 kg 150 75 2.179 1 14.00 30.51
B7 H-150x75x5x7 kg 150 75 1.728 1 14.00 24.19
Y1+2575 / bet X7-X1
B7 H-150x75x5x7 kg 150 75 1.703 1 14.00 23.84
B7 H-150x75x5x7 kg 150 75 2.153 1 14.00 30.14
B6 H-200x100x5.5x8 kg 200 100 1.262 1 20.90 26.38
B6 H-200x100x5.5x8 kg 200 100 4.055 1 20.90 84.75
B5 H-248x124x5x8 kg 248 124 5.205 1 25.10 130.65
B6 H-200x100x5.5x8 kg 200 100 3.755 1 20.90 78.48
B5 H-248x124x5x8 kg 248 124 5.005 1 25.10 125.63
B6 H-200x100x5.5x8 kg 200 100 4.112 1 20.90 85.94
B7 H-150x75x5x7 kg 150 75 2.153 1 14.00 30.14
B7 H-150x75x5x7 kg 150 75 1.703 1 14.00 23.84
Y2-2190 / bet X6-X2
B6 H-200x100x5.5x8 kg 200 100 3.208 1 20.90 67.05
B5 H-248x124x5x8 kg 248 124 5.205 1 25.10 130.65
B6 H-200x100x5.5x8 kg 200 100 3.755 1 20.90 78.48
B5 H-248x124x5x8 kg 248 124 5.005 1 25.10 125.63
B6 H-200x100x5.5x8 kg 200 100 1.737 1 20.90 36.30
Y3+2150 / bet X6-X2
B6 H-200x100x5.5x8 kg 200 100 3.196 1 20.90 66.80
B5 H-248x124x5x8 kg 248 124 5.193 1 25.10 130.34
B6 H-200x100x5.5x8 kg 200 100 3.755 1 20.90 78.48
B5 H-248x124x5x8 kg 248 124 4.993 1 25.10 125.32
B6 H-200x100x5.5x8 kg 200 100 1.724 1 20.90 36.03
Y4-2575 / bet X7-X1
B7 H-150x75x5x7 kg 150 75 1.703 1 14.00 23.84
B7 H-150x75x5x7 kg 150 75 2.153 1 14.00 30.14
B6 H-200x100x5.5x8 kg 200 100 1.249 1 20.90 26.10
B6 H-200x100x5.5x8 kg 200 100 4.030 1 20.90 84.23
B5 H-248x124x5x8 kg 248 124 5.193 1 25.10 130.34
B6 H-200x100x5.5x8 kg 200 100 3.755 1 20.90 78.48
B5 H-248x124x5x8 kg 248 124 4.993 1 25.10 125.32
B6 H-200x100x5.5x8 kg 200 100 4.099 1 20.90 85.67
B7 H-150x75x5x7 kg 150 75 2.153 1 14.00 30.14
B7 H-150x75x5x7 kg 150 75 1.703 1 14.00 23.84
X7-X5 (at corner ridge)
CB1 H-340x250x9x14 kg 340 250 2.223 1 78.10 173.62
B3 H-340x250x9x14 kg 340 250 5.331 1 78.10 416.35
B4 H-298x149x5.5x8 kg 298 149 5.672 1 32.00 181.50
B6 H-200x100x5.5x8 kg 200 100 0.466 1 20.90 9.74
B6 H-200x100x5.5x8 kg 200 100 0.466 1 20.90 9.74
B4 H-298x149x5.5x8 kg 298 149 5.690 1 32.00 182.08
B3 H-340x250x9x14 kg 340 250 5.349 1 78.10 417.76
CB1 H-340x250x9x14 kg 340 250 2.223 1 78.10 173.62
X2-X1 (at corner ridge)
CB1 H-340x250x9x14 kg 340 250 2.223 1 78.10 173.62
B3 H-340x250x9x14 kg 340 250 9.449 1 78.10 737.97
B5 H-248x124x5x8 kg 248 124 2.086 1 25.10 52.36
B5 H-248x124x5x8 kg 248 124 2.029 1 25.10 50.93

Page 4 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

Unit Wt,
Description unit H, mm B, mm L, m nos kg/m Weight, kg Rem
A B C AxBxC
B3 H-340x250x9x14 kg 340 250 9.468 1 78.10 739.45
CB1 H-340x250x9x14 kg 340 250 2.223 1 78.10 173.62
24,315.65
Purlins
Plan RFL+500 C-100x50x20x2.3 kg 100 50 0.155 49 4.06 30.84 S-1101-2, 8

Plan RFL+500 (at corner ridge)


X7-X5 L-65x65x6 kg 65 65 2.139 1 5.91 12.64 S-1101-2
L-65x65x6 kg 65 65 2.139 1 5.91 12.64
L-65x65x6 kg 65 65 2.906 1 5.91 17.17
L-65x65x6 kg 65 65 2.870 1 5.91 16.96
L-65x65x6 kg 65 65 1.694 1 5.91 10.01
L-65x65x6 kg 65 65 1.940 1 5.91 11.46
L-65x65x6 kg 65 65 1.027 1 5.91 6.07
L-65x65x6 kg 65 65 0.764 1 5.91 4.52
L-65x65x6 kg 65 65 3.150 1 5.91 18.62
L-65x65x6 kg 65 65 2.870 1 5.91 16.96
L-65x65x6 kg 65 65 0.972 1 5.91 5.74
L-65x65x6 kg 65 65 1.235 1 5.91 7.30
L-65x65x6 kg 65 65 0.593 1 5.91 3.50
L-65x65x6 kg 65 65 0.593 1 5.91 3.50
L-65x65x6 kg 65 65 1.235 1 5.91 7.30
L-65x65x6 kg 65 65 0.890 1 5.91 5.26
L-65x65x6 kg 65 65 2.945 1 5.91 17.41
L-65x65x6 kg 65 65 3.207 1 5.91 18.95
L-65x65x6 kg 65 65 0.783 1 5.91 4.63
L-65x65x6 kg 65 65 1.044 1 5.91 6.17
L-65x65x6 kg 65 65 1.940 1 5.91 11.46
L-65x65x6 kg 65 65 1.694 1 5.91 10.01
L-65x65x6 kg 65 65 2.870 1 5.91 16.96
L-65x65x6 kg 65 65 2.906 1 5.91 17.17
L-65x65x6 kg 65 65 2.139 1 5.91 12.64
L-65x65x6 kg 65 65 2.139 1 5.91 12.64
X5-X2 L-65x65x6 kg 65 65 4.757 1 5.91 28.11
L-65x65x6 kg 65 65 4.757 1 5.91 28.11
L-65x65x6 kg 65 65 3.800 1 5.91 22.46
L-65x65x6 kg 65 65 3.800 1 5.91 22.46
L-65x65x6 kg 65 65 3.157 1 5.91 18.66
L-65x65x6 kg 65 65 3.157 1 5.91 18.66
X2-X1 L-65x65x6 kg 65 65 2.139 1 5.91 12.64
L-65x65x6 kg 65 65 2.139 1 5.91 12.64
L-65x65x6 kg 65 65 2.870 1 5.91 16.96
L-65x65x6 kg 65 65 2.870 1 5.91 16.96
L-65x65x6 kg 65 65 5.814 1 5.91 34.36
L-65x65x6 kg 65 65 6.058 1 5.91 35.81
L-65x65x6 kg 65 65 0.323 1 5.91 1.91
L-65x65x6 kg 65 65 1.963 1 5.91 11.60
L-65x65x6 kg 65 65 2.103 1 5.91 12.43
L-65x65x6 kg 65 65 2.045 1 5.91 12.09
L-65x65x6 kg 65 65 1.906 1 5.91 11.26
L-65x65x6 kg 65 65 0.399 1 5.91 2.36
L-65x65x6 kg 65 65 6.077 1 5.91 35.91
L-65x65x6 kg 65 65 5.833 1 5.91 34.47
L-65x65x6 kg 65 65 2.870 1 5.91 16.96

Page 5 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

Unit Wt,
Description unit H, mm B, mm L, m nos kg/m Weight, kg Rem
A B C AxBxC
L-65x65x6 kg 65 65 2.870 1 5.91 16.96
L-65x65x6 kg 65 65 2.139 1 5.91 12.64
L-65x65x6 kg 65 65 2.139 1 5.91 12.64
Y1-1780 Framing Elevation
horizontal support L-50x50x4 kg 50 50 33.591 2 3.06 205.58 S-1101-9
horizontal support L-50x50x4 kg 50 50 33.488 1 3.06 102.47
vertical support L-50x50x4 kg 50 50 0.150 29 3.06 13.31
Y4+1780 Framing Elevation
horizontal support L-50x50x4 kg 50 50 33.591 2 3.06 205.58
horizontal support L-50x50x4 kg 50 50 33.488 1 3.06 102.47
vertical support L-50x50x4 kg 50 50 0.150 29 3.06 13.31
X1-1780 Framing Elevation
horizontal support L-50x50x4 kg 50 50 21.591 2 3.06 132.14 S-1101-10
horizontal support L-50x50x4 kg 50 50 21.491 1 3.06 65.76
vertical support L-50x50x4 kg 50 50 0.150 19 3.06 8.72
X4+1780 Framing Elevation
horizontal support L-50x50x4 kg 50 50 21.591 2 3.06 132.14
horizontal support L-50x50x4 kg 50 50 21.491 1 3.06 65.76
vertical support L-50x50x4 kg 50 50 0.150 19 3.06 8.72
1,823.58

Total kg 27,543.53

Actual ton 27.54

BOQ ton 32.21

Difference ton (4.67)

Page 6 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

H, mm B, mm Ht Base Wd L, m nos Qty


Description unit Rem
A B C = A/1000 D = B/1000 E F G H=ExFxG
Administration Building

4-H.a-5.1
Structural steel incl Erection 823.40 m2

Columns
X1 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 0.514 2 1.23 S-1101-3
P2 H-250x250x9x14 m2 250 250 0.25 0.25 1.50 0.511 2 1.53
X2 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 0.546 1 0.66
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 2.562 1 3.07
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 0.532 1 0.64
X3 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 0.544 2 1.31
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 2.694 1 3.23
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 2.682 1 3.22
X4 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 0.544 2 1.31
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 2.694 1 3.23
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 2.682 1 3.22
X5 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 0.544 2 1.31
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 2.694 1 3.23
X6 Framing Elevation / bet Y1-Y4
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 0.544 2 1.31
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 1.707 1 2.05
X7 Framing Elevation / bet Y4-Y1
P1 H-200x200x8x12 m2 200 200 0.20 0.20 1.20 0.514 2 1.23 S-1101-4
P2 H-250x250x9x14 m2 250 250 0.25 0.25 1.50 0.511 2 1.53
33.31
Girders & Beams
X1 Framing Elevation / bet Y1-Y4
B4 H-298x149x5.5x8 m2 298 149 0.30 0.15 1.19 6.920 1 8.25 S-1101-3
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.090 1 2.47
B4 H-298x149x5.5x8 m2 298 149 0.30 0.15 1.19 6.880 1 8.20
X2 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 7.021 1 9.83
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 0.230 1 0.32
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 3.498 1 6.30
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 6.282 1 11.31
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 0.731 1 1.32
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.944 1 2.72
X3 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 7.156 1 10.02
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 1.592 1 1.27
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 1.634 1 1.31
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 7.114 1 9.96
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
X4 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.950 1 2.73
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 7.156 1 10.02
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 1.592 1 1.27
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 1.634 1 1.31
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 7.114 1 9.96
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
X5 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 7.156 1 10.02
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 0.990 1 1.78
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 1.146 1 2.06
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 7.744 1 13.94

Page 7 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

H, mm B, mm Ht Base Wd L, m nos Qty


Description unit Rem
A B C = A/1000 D = B/1000 E F G H=ExFxG
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 0.731 1 1.32
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.944 1 2.72
X6 Framing Elevation / bet Y1-Y4
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.944 1 2.72
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 4.048 1 5.67
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 3.078 1 4.31
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 6.348 1 11.43
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 3.307 1 5.95
B1 H-500x200x10x16 m2 500 200 0.50 0.20 1.80 0.731 1 1.32
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.944 1 2.72
X7 Framing Elevation / bet Y1-Y4
B4 H-298x149x5.5x8 m2 298 149 0.30 0.15 1.19 6.880 1 8.20 S-1101-4
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.090 1 2.47
B4 H-298x149x5.5x8 m2 298 149 0.30 0.15 1.19 6.920 1 8.25
Y1 Framing Elevation / bet X7-X1
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.730 1 2.98
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 4.030 1 3.22
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.180 1 5.14
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.730 1 2.98
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.980 1 4.94
B4 H-298x149x5.5x8 m2 298 149 0.30 0.15 1.19 6.580 1 7.84
Y2 Framing Elevation / bet X7-X1
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 3.826 1 5.36
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.067 1 2.45
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 0.866 1 0.69
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.180 1 5.14
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.730 1 2.98
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.748 1 4.71
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 0.242 1 0.24
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 6.801 1 9.52
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
Y2+1860 Framing Elevation / bet X7-X1
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 0.485 1 0.48 S-1101-5
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.735 1 4.70 S-1101-5
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.770 1 3.02
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 3.135 1 3.11
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 1.947 1 1.93
Y3 Framing Elevation / bet X7-X1
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 3.826 1 5.36
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 3.011 1 2.99
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 0.906 1 0.72
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.180 1 5.14
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.730 1 2.98
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.788 1 4.75
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 0.200 1 0.20
B2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 6.801 1 9.52
CB2 H-350x175x7x11 m2 350 175 0.35 0.18 1.40 1.948 1 2.73
Y4 Framing Elevation / bet X7-X1
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.730 1 2.98
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 4.030 1 3.22
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.180 1 5.14
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.730 1 2.98
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.980 1 4.94
B4 H-298x149x5.5x8 m2 298 149 0.30 0.15 1.19 6.580 1 7.84
Y1-1780 Framing Elevation / bet X7-X1
B8 H-250x255x14x14 m2 250 255 0.25 0.26 1.52 5.593 1 8.50 S-1101-9
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 4.055 1 3.24
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.205 1 5.16
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.755 1 3.00
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.005 1 4.96
B8 H-250x255x14x14 m2 250 255 0.25 0.26 1.52 8.443 1 12.83
Y4+1780 Framing Elevation / bet X7-X1 `

Page 8 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

H, mm B, mm Ht Base Wd L, m nos Qty


Description unit Rem
A B C = A/1000 D = B/1000 E F G H=ExFxG
B8 H-250x255x14x14 m2 250 255 0.25 0.26 1.52 8.443 1 12.83
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.005 1 4.96
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.755 1 3.00
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.205 1 5.16
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 4.055 1 3.24
B8 H-250x255x14x14 m2 250 255 0.25 0.26 1.52 5.593 1 8.50
X7-1780 Framing Elevation / bet Y4-Y1
B8 H-250x255x14x14 m2 250 255 0.25 0.26 1.52 8.743 1 13.29 S-1101-10
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.115 1 2.49
B8 H-250x255x14x14 m2 250 255 0.25 0.26 1.52 8.782 1 13.35
X1+1780 Framing Elevation / bet Y1-Y4
B8 H-250x255x14x14 m2 250 255 0.25 0.26 1.52 8.783 1 13.35
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.115 1 2.49
B8 H-250x255x14x14 m2 250 255 0.25 0.26 1.52 8.743 1 13.29
X1-2575 / bet Y1-Y4
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 1.703 1 1.02 S-1101-2
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 2.153 1 1.29
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.400 1 4.36
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.115 1 2.49
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.440 1 4.40
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 2.153 1 1.29
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 1.703 1 1.02
X2+1850 / bet Y2-Y3
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 2.037 1 1.63
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.115 1 2.49
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 2.077 1 1.66
X5-875 / bet Y2-Y3
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.011 1 2.41
X6+550 / bet Y2-Y3
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 2.134 1 1.71
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.178 1 2.54
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 2.186 1 1.75
X6-1825 / bet Y1-Y4
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 1.728 1 1.04
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 2.179 1 1.31
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.400 1 4.36
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.115 1 2.49
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.440 1 4.40
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 2.179 1 1.31
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 1.728 1 1.04
Y1+2575 / bet X7-X1
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 1.703 1 1.02
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 2.153 1 1.29
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 1.262 1 1.01
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 4.055 1 3.24
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.205 1 5.16
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.755 1 3.00
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.005 1 4.96
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 4.112 1 3.29
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 2.153 1 1.29
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 1.703 1 1.02
Y2-2190 / bet X6-X2
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.208 1 2.57
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.205 1 5.16
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.755 1 3.00
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.005 1 4.96
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 1.737 1 1.39
Y3+2150 / bet X6-X2
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.196 1 2.56
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.193 1 5.15
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.755 1 3.00
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.993 1 4.95
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 1.724 1 1.38
Y4-2575 / bet X7-X1

Page 9 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

H, mm B, mm Ht Base Wd L, m nos Qty


Description unit Rem
A B C = A/1000 D = B/1000 E F G H=ExFxG
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 1.703 1 1.02
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 2.153 1 1.29
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 1.249 1 1.00
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 4.030 1 3.22
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 5.193 1 5.15
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 3.755 1 3.00
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 4.993 1 4.95
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 4.099 1 3.28
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 2.153 1 1.29
B7 H-150x75x5x7 m2 150 75 0.15 0.08 0.60 1.703 1 1.02
X7-X5 (at corner ridge)
CB1 H-340x250x9x14 m2 340 250 0.34 0.25 1.68 2.223 1 3.73
B3 H-340x250x9x14 m2 340 250 0.34 0.25 1.68 5.331 1 8.96
B4 H-298x149x5.5x8 m2 298 149 0.30 0.15 1.19 5.672 1 6.76
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 0.466 1 0.37
B6 H-200x100x5.5x8 m2 200 100 0.20 0.10 0.80 0.466 1 0.37
B4 H-298x149x5.5x8 m2 298 149 0.30 0.15 1.19 5.690 1 6.78
B3 H-340x250x9x14 m2 340 250 0.34 0.25 1.68 5.349 1 8.99
CB1 H-340x250x9x14 m2 340 250 0.34 0.25 1.68 2.223 1 3.73
X2-X1 (at corner ridge)
CB1 H-340x250x9x14 m2 340 250 0.34 0.25 1.68 2.223 1 3.73
B3 H-340x250x9x14 m2 340 250 0.34 0.25 1.68 9.449 1 15.87
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 2.086 1 2.07
B5 H-248x124x5x8 m2 248 124 0.25 0.12 0.99 2.029 1 2.01
B3 H-340x250x9x14 m2 340 250 0.34 0.25 1.68 9.468 1 15.91
CB1 H-340x250x9x14 m2 340 250 0.34 0.25 1.68 2.223 1 3.73
685.62
Purlins
Plan RFL+500 C-100x50x20x2.3 m2 100 50 0.10 0.05 0.40 0.155 49 3.04 S-1101-2, 8

Plan RFL+500 (at corner ridge)


X7-X5 L-65x65x6 m2 65 65 0.07 0.07 0.26 2.139 1 0.56 S-1101-2
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.139 1 0.56
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.906 1 0.76
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.870 1 0.75
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.694 1 0.44
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.940 1 0.50
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.027 1 0.27
L-65x65x6 m2 65 65 0.07 0.07 0.26 0.764 1 0.20
L-65x65x6 m2 65 65 0.07 0.07 0.26 3.150 1 0.82
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.870 1 0.75
L-65x65x6 m2 65 65 0.07 0.07 0.26 0.972 1 0.25
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.235 1 0.32
L-65x65x6 m2 65 65 0.07 0.07 0.26 0.593 1 0.15
L-65x65x6 m2 65 65 0.07 0.07 0.26 0.593 1 0.15
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.235 1 0.32
L-65x65x6 m2 65 65 0.07 0.07 0.26 0.890 1 0.23
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.945 1 0.77
L-65x65x6 m2 65 65 0.07 0.07 0.26 3.207 1 0.83
L-65x65x6 m2 65 65 0.07 0.07 0.26 0.783 1 0.20
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.044 1 0.27
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.940 1 0.50
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.694 1 0.44
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.870 1 0.75
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.906 1 0.76
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.139 1 0.56
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.139 1 0.56
X5-X2 L-65x65x6 m2 65 65 0.07 0.07 0.26 4.757 1 1.24
L-65x65x6 m2 65 65 0.07 0.07 0.26 4.757 1 1.24
L-65x65x6 m2 65 65 0.07 0.07 0.26 3.800 1 0.99
L-65x65x6 m2 65 65 0.07 0.07 0.26 3.800 1 0.99
L-65x65x6 m2 65 65 0.07 0.07 0.26 3.157 1 0.82
L-65x65x6 m2 65 65 0.07 0.07 0.26 3.157 1 0.82
X2-X1 L-65x65x6 m2 65 65 0.07 0.07 0.26 2.139 1 0.56

Page 10 of 11
TOA CORPORATION
THE PORT VILA LAPETASI INTERNATIONAL MULTI-PURPOSE WHARF DEVELOPMENT PROJECT
DETAILED CALCULATIONS
Item No. 4-H.a-5-1
Description of Work: Structural Steel including Erection

H, mm B, mm Ht Base Wd L, m nos Qty


Description unit Rem
A B C = A/1000 D = B/1000 E F G H=ExFxG
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.139 1 0.56
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.870 1 0.75
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.870 1 0.75
L-65x65x6 m2 65 65 0.07 0.07 0.26 5.814 1 1.51
L-65x65x6 m2 65 65 0.07 0.07 0.26 6.058 1 1.58
L-65x65x6 m2 65 65 0.07 0.07 0.26 0.323 1 0.08
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.963 1 0.51
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.103 1 0.55
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.045 1 0.53
L-65x65x6 m2 65 65 0.07 0.07 0.26 1.906 1 0.50
L-65x65x6 m2 65 65 0.07 0.07 0.26 0.399 1 0.10
L-65x65x6 m2 65 65 0.07 0.07 0.26 6.077 1 1.58
L-65x65x6 m2 65 65 0.07 0.07 0.26 5.833 1 1.52
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.870 1 0.75
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.870 1 0.75
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.139 1 0.56
L-65x65x6 m2 65 65 0.07 0.07 0.26 2.139 1 0.56
Y1-1780 Framing Elevation
horizontal support L-50x50x4 m2 50 50 0.05 0.05 0.20 33.591 2 13.44 S-1101-9
horizontal support L-50x50x4 m2 50 50 0.05 0.05 0.20 33.488 1 6.70
vertical support L-50x50x4 m2 50 50 0.05 0.05 0.20 0.150 29 0.87
Y4+1780 Framing Elevation
horizontal support L-50x50x4 m2 50 50 0.05 0.05 0.20 33.591 2 13.44
horizontal support L-50x50x4 m2 50 50 0.05 0.05 0.20 33.488 1 6.70
vertical support L-50x50x4 m2 50 50 0.05 0.05 0.20 0.150 29 0.87
X1-1780 Framing Elevation
horizontal support L-50x50x4 m2 50 50 0.05 0.05 0.20 21.591 2 8.64 S-1101-10
horizontal support L-50x50x4 m2 50 50 0.05 0.05 0.20 21.491 1 4.30
vertical support L-50x50x4 m2 50 50 0.05 0.05 0.20 0.150 19 0.57
X4+1780 Framing Elevation
horizontal support L-50x50x4 m2 50 50 0.05 0.05 0.20 21.591 2 8.64
horizontal support L-50x50x4 m2 50 50 0.05 0.05 0.20 21.491 1 4.30
vertical support L-50x50x4 m2 50 50 0.05 0.05 0.20 0.150 19 0.57
104.47

823.40

Summary
Columns m2 33.31

Girders & Beams m2 685.62

Purlins m2 104.47

Total m2 823.40

Formula of Width ( E ) for each section:


H - frame (C x 2) + (D x 4)
C - frame (C x 2) + (D x 4)
Square pipes (C + D) x 2
Angle bars (C x 2) + (D x 2)

Page 11 of 11