Working Drawing Submission
Working Drawing Submission
UNTUK TETUAN:
Land Owner & Developer Signature Architects M&E Engineer C&S Engineer Quantity Surveyor Landscape Architect Interior Designer
01 LIST OF DRAWINGS NTS DBKL/BP/01-01 WAN MOHAMAD AFFDHAN SIME DARBY PROPERTY
SITE ARRANGEMENT
02 SITE PLANS
01 SITE PLANS, KEY PLAN AND LOCATION PLAN RTD DBKL/BP/02-01 WAN MOHAMAD AFFDHAN
SITE ARRANGEMENT
Land Owner & Developer Signature
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
05
pembinaan yang dijalankan"
ROOF PLAN 1:250 DBKL/BP/03-05 WAN MOHAMAD AFFDHAN
Architects
13
06 BASEMENT PLAN 1:250 DBKL/BP/03-06 WAN MOHAMAD AFFDHAN MOA Architects
M&E Engineer
01 DOOR SCHEDULE 1 1:50 DBKL/BP/06-01 WAN MOHAMAD AFFDHAN SC QS Consult Sdn Bhd
Landscape Architect
03 DOOR SCHEDULE 3 1:50 DBKL/BP/06-03 WAN MOHAMAD AFFDHAN Urbanscape Consultant Sdn Bhd
BOMBA SUBMISSION No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
Selangor, 47620 USJ Subang Jaya
07 SITE PLANS Drawing Title
LIST OF DRAWING
01 SITE PLAN, KEY PLAN AND LOCATION PLAN RTD DBKL/BP/07-01 WAN MOHAMAD AFFDHAN
SITE ARRANGEMENTS
07 SITE PLANS Revision Date Note
01 GROUND FLOOR BOMBA PLAN (G) 1:250 DBKL/BP/08-01 WAN MOHAMAD AFFDHAN
02 FIRST FLOOR BOMBA PLAN (1F) 1:250 DBKL/BP/08-02 WAN MOHAMAD AFFDHAN
03 SECOND FLOOR BOMBA PLAN (2F) 1:250 DBKL/BP/08-03 WAN MOHAMAD AFFDHAN
04 THIRD FLOOR BOMBA PLAN (3F) 1:250 DBKL/BP/08-04 WAN MOHAMAD AFFDHAN
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/01-01
Adalah saya mencadangkan agar maksud utama penggunaan cadangan projek seperti di atas
dalam KUMPULAN MAKSUD III (JADUAL KELIMA) dan keperluan kelengkapan keselamatan
kebakaran adalah seperti berikut.
CHOW KIT MUSIC
Pelan Tapak
CENTRE
HOSPITAL 1. Adakan6 buah pili bomba jenis tiang pengeluaran dua hala dengan pengeluaran air sebanya
1500 liter seminit bagi setiap pili bomba dan 3000/ 4500 lit/ min apabila 2/3 buah pili bomba dibuka
serentak (pressurized hydrant).
KUALA LUMPUR 2. Mengadakan 2 talian hos erukuran 64mm x 30 meter dan sebatang nozel dari jenis ‘jet & spray’
yang ditempatkan di dalam peti kabinet berhampiran dengan tiap- tiap pili bomba.
3. Adakan jalan akses perkakas bomba (access road) deng kelebaran tidak kurang 6 meter yang
boleh menanggung beban 25 tan sepertiman yang ditandakan didalam pelan. CADANGAN MEMBINA 1 BLOK PUSAT MUSIK KOMUNITI 4
4.Pili bomba sediada hendaklah dalam jaraj 91.5 meter dari bangunan cadangan dan berada dalam
keadaan baik.
TINGKAT ATAS LOT 407, JALAN IPOH, CHOW KIT, SELANGOR
5.Kecerunan jalan akses perkakas bomba hendaklah tidak kurang 1:12. DARUL EHSAN
6.Ketinggian kelegaan hendaklah tidak kurang daripada 5 meter.
7.Jarak antara bangunan hendaklah mematuhi Jadual Ke Enam UUKBS 1984.
UNTUK TETUAN:
Kehendak-kehendak Am
SIME DARBY PROPERTY
1.Semua pendawaian elektrik bagi sistem kecemasan hendaklah dalam konduit logam atau
daripada kabel yang mempunyai penebatan mineral tahan api. Pemasangannya hendaklah
sepanjang kawasan yang paling kurang risiko kebakarannya dan mematuhi UUK 253(4), UUKBS
1984.
2.Semua elemen struktur hendaklah mempunyai tempoh ketahanan api mengikut Jadual
Kesembilan, UUKBS 1984.
3.Adakan sistem pengudaraan bagi tangga keselamatan sama ada secara biasa atau mekanikal
4.Penggunaan gas petroleum cecair (L.P.G) secara ‘bulk storage’ hendaklah mematuhi syarat-
syarat penentuan Piawaian Malaysia MS 830 dan Ms 930. Sila kemukakan pelan yang lengkap ke
Jabatan ini.
5.Bagi bangunan yang melebihi 30 meter, semua tangga yang dicadang untuk digunakan sebagai
jalan keluar hendaklah dilanjutkan ke paras bumbung untuk memberi akses kepadanya mengikut
UUK 195, UUKBS 1984.
6.Semua papan tanda keselamatan kebakaran hendaklah mematuhi Piawaian Malaysia MS 982.
7.Adakan ‘graphic design of floor plan’ berlatarbelakang warna putih yang menunjukkan tangga
keselamatan, laluan-laluan keselamatan, jalan-jalan keluar dan kedudukan alat- alat pencegah
CHOW KITBARU
KG.
kebakaran. Penenmpatannya hendaklah ditempat yang mudah dilihat.
Sila kemukakan tiga (3) set buku operasi mengikut syarat syarat Jabatan Bomba dan Penyelamat
MONORAIL Malaysia.
[18:41, 12/12/2020] Elvin: hendak-kehendak Pasif
CHOW KIT STATION 1. Penggunaan siling bangunan hendaklah menepati kehendak-kehendak UBBL 1984 Jadual
Kelapan.
2. Semua tangga keselamatan hendaklah dikepung dengan tembok batu bata setebal
100mm atau bagi tangga jenis terbuka mematuhi UBBL 1984. Land Owner & Developer Signature
3. Adakan pintu api satu jam sepertimana yang ditandakan di dalam pelan. Pemasangannya
hendaklah tertutup sendiri dan tertutup rapat. Sime Darby Property Berhad Ara Damansara
4. Adakan dinding pemetakan (compartment wall) setebal 100mm / 200mm batu-bata yang dibina
sehingga paras bumbung/ lantai sepertimana yang ditandakan di dalam pelan. Block G, 10th Floor
5. Dinding bagi bilik setor yang disifatkan merbahaya hendaklah setebal 100mm batu- bata dan No.2, Jalan PJU 1A/7A, Ara Damansara, PJU 1A
pintunya dari jenis ketahanan api satu jam dipasang dengan `door closer’. 47301 Petaling Jaya, Selangor
6. Adakan ‘break point’ pada dinding luar bangunan untuk tujuan memudahkan anggota bomba
menjalankan kerja-kerja operasi. Hotline: 1-800-88-1118
7. Adakan bidai gulung [roller shutter] ketahanan api 2 jam / 4 jam seperti tertanda di dalam pelan. Outside Malaysia : +603-7849 5000
8. Penggunaan kaca-kaca pada dinding luar bangunan hendaklah dari jenis yang dibenarkan oleh
Jabatan Bomba dan Penyelamat Malaysia.
9. Semua lubong perkhidmatan (service shaft) hendaklah ditutup disetiap tingkat dengan bahan
ketahanan api dua jam.
10. Semua bilik bagi penempatan pam bomba dan janakuasa hendaklah dibina dari tembok batu- Michael Reeves
bata ketahanan api dua jam. Pintu-pintunya hendaklah ketahanan api satu jam.
11. Dinding dua pihak hendaklah dari jenis batu-bata setebal 200mm jenis yang menanggung Chief Operating Officer
beban dan 100mm yang tidak menanggung beban. Dinding ini hendaklah dinaikkan 225
mm melebihi paras bumbung atau mematuhi rekabentuk yang dipersetujui oleh Jabatan Bomba "Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
dan Penyelamat Malaysia. pembinaan yang dijalankan"
12. Semua dinding pembahagi dalaman hendaklah dari jenis ketahanan api ½ jam dan dari jenis
yang diluluskan oleh Jabatan Bomba dan Penyelamat Malaysia.
Architects
Dinding pengasing antara kilang dan pejabat hendaklah setebal 100mm / 200mm dan dinaikkan
N N hingga ke paras bumbung seperti tertanda di dalam pelan.Adakan dinding pembalik (deflector wall)
KEY PLAN | NTS LOCATION PLAN | NTS pada dinding yang mengepung tangga tunggal di pintu masuk utama sepanjang 450mm
sepertimana yang ditandakan di dalam pelan.
MOA Architects
Ruangan lobi lif hendaklah dibina dari bahan ketahanan api dua jam dan dilindungi dengan alat Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
pengesan asap mengikut UUKBS 1984.
Adakan sebuah pusat pemerintahan dan kawalan kebakaran di lantai tetuan (designated floor) Indah,
yang dilengkapi dengan peti penggera kebakaran bagi bangunan melebihi 30.5 meter tinggi. 58100 Kuala Lumpur, Malaysia.
Kehendak-kehendak Aktif
Architect Signature
1. Adakan sistem penyembur air automatik mengikut Piawaian Malaysia MS 1910 dan peruntukan
B1 dalam UUKBS 1984.
Adakan sistem pancur basah mengikut Piawaian Malaysia MS 1489 : Part 1 dan peruntukan dalam
B2 UUKBS 1984.
2. Adakan sistem pancur kering mengikut Piawaian Malaysia MS 1489 : Part 1 dan peruntukan Ar. Tan Ewe Liat
ARKITEK
B3 dalam UUKBS 1984.
3. Adakan sistem pancur menurun mengikut peruntukan dalam UUKBS 1984.
4. Adakan ...................unit saluran bantu mula mengikut Piawaian Malaysia MS 1489 : Part 1 dan
B4 peruntukan dalam UUKBS 1984.
5. Adakan .................unit penggera kebakaran jenis pecah kaca mengikut Piawaian Malaysia
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
B5 MS 1745 : Part 14 dan peruntukan dalam UUKBS 1984.
6 Adakan sistem pengesan haba / asap mengikut Piawaian Malaysia MS 1745 : Part 14 dan M&E Engineer
B6 peruntukan dalam UUKBS 1984.
Adakan lampu tanda `KELUAR’ kecemasan mengikut Piawaian Malaysia MS 985 dan dari jenis
Yang Fong M&E Engineering Trading Sdn Bhd
A9 B7 C1 C2 yang diluluskan oleh Jabatan Bomba dan Penyelamat Malaysia.
7. Adakan lampu kecemasan yang menggunakan dua kuasa karan sepertimana yang ditandakan di
B8 C3 C4 dalam pelan. Lampu-lampu tersebut hendaklah dari jenis yang diluluskan oleh Jabatan Bomba dan
Penyelamat Malaysia.
No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
8. Adakan ................. unit alat pemadam api mudahalih yang bersesuaian mengikut Piawaian Lama, Taman United, 58200 Kuala Lumpur
B9 Malaysia MS 1539: Part 3.
A8 B10
9. Adakan sistem pengurusan asap mengikut Piawaian Malaysia MS 1780 atau mana-mana
penentuan yang dibenarkan oleh Jabatan Bomba dan Penyelamat Malaysia.
C&S Engineer
10. Adakan sistem isitekan (pressurization system) mengikut Piawaian Malaysia MS 1472 dan
F2 peruntukan dalam UUKBS 1984.
11. Adakan sistem pemasangan tetap gas mengikut Piawaian Malaysia berkaitan atau mana-mana
SMC (M) Sdn Bhd
A7
B42 penentuan yang dibenarkan oleh Jabatan Bomba dan Penyelamat Malaysia.
12. Adakan lif bomba sepertimana yang ditandakan di dalam pelan mengikut Piawaian Malaysia
Lot 36 & 37, Jalan Delima 1/1, Subang Hi-tech
Industrial Park, 47500 Subang Jaya, Selangor
F1 MS 1183 : Part 5 dan peruntukan dalam UUKBS 1984.
13. Adakan sistem siaraya awam (public address system) mengikut peruntukan UUK 239, UUKBS
A6 1984.
14. Adakan sistem komunikasi bomba (telefon bomba) dimana sistem komunikasinya hendaklah
Quantity Surveyor
tiga hala dan penempatannya di dalam tangga keselamatan / lobi menentang kebakaran, bilik motor
SC QS Consult Sdn Bhd
A5 E3 lif, bilik pam bomba dan bilik janakuasa.
15. Saluran pendingin hawa hendaklah dipasang dengan sesekat api (fire damper) mengikut
JA E2 Piawaian Malaysia MS 555 dan dari jenis yang diluluskan oleh Jabatan Bomba dan Penyelamat
Malaysia.
No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
Selangor, 47620 USJ Subang Jaya
Adakan suis pengasingan elektrik (electrical isolation switch) yang membolehkan pemotongan
AZ LA A4 E1 D1 bekalan kuasa elektrik ke tingkat atau zon berkenaan yang menggunakannya.
LA N S
Adakan sistem talian terus amaran kebakaran ke balai bomba terdekat dan pemasangannya Landscape Architect
hendaklah mematuhi syarat-syarat penentuan Jabatan Bomba dan Penyelamat Malaysia.
16. Adakan sistem busa [foam system] mengikut syarat-syarat penentuan NFPA atau mana-mana
N UL A3 D2
penentuan yang dibenarkan oleh Jabatan Bomba dan Penyelamat. Urbanscape Consultant Sdn Bhd
SH T Adakan alat pengesan asap jenis kuasa tersendiri [self contained type smoke detector] mengikut
AH AN
syarat-syarat penentuan NFPA atau mana-mana penentuan yang dibenarkan oleh Jabatan Bomba 94300 Kota Samarahan, Sarawak
dan Penyelamat.
A2
DN
D3 Peringatan
Interior Designer
1. Segala syarat-syarat yang dikemukakan adalah tertakluk kepada rekabentuk dan kegunaan serta
lokasi bangunan tersebut. Sekiranya sebarang perubahan yang dilakukan ke atas rekabentuk atau Matt Design Sdn Bhd
A1 kegunaannya seperti yang dicatatkan di atas pelan maka hendaklah dirujuk ke Jabatan ini untuk
dikaji semula.
2. Segala pemilihan bahan dan penggunaannya yang berkaitan dengan keselamatan kebakaran No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
bagi projek cadangan serta sistem pencegahan kebakaran hendaklah mematuhi UUKBS 1984 dan Selangor, 47620 USJ Subang Jaya
peraturan-peraturan yang diterima sahaja dan yang dibenarkan oleh Jabatan Bomba dan
Penyelamat Malaysia.
3. Bagi bangunan yang rekabentuknya melebihi 18.5 meter hingga ke lantai penuh yang tertinggi Drawing Title
sekali, sesalur-sesalur naik mengikut Undang-Undang Kecil 232 hendaklah dipasang sebaik sahaja
selepas bangunan itu melebihi tinggi tersebut untuk mengadakan kemudahan-kemudahan SITE, KEY AND LOCATION PLAN
mencegah kebakaran dalam masa berbagai peringkat pembinaan itu.
4. Pengesahan pelan ini adalah tidak tertakluk kepada penyimpanan, penggunaan, pemerosesan
dan penghasilan bahan berbahaya atau kimia berbahaya. Sekiranya terdapat sebarang
penyimpanan, pengunaan, pemerosesan dan penghasilan bahan berbahaya atau kimia berbahaya
setelah pelan disahkan maka pelan bangunan tersebut hendaklah dirujuk kembali ke jabatan ini
untuk dikaji semula.
5. Pelan lukisan dan pengiraan bagi semua pemasangan tetap hendaklah dikemukakan ke Jabatan
Bomba dan Penyelamat, Malaysia. Jumlah pelan-pelan yang perlu dikemukakan hendaklah dua
perenggu.
JALAN PAHANG
JALAN PAHANG
A
1
209
U
Auditor
22
Soup
14
Meeting
Office
15
Backstage
19
Walkw
8
Ch
18
Storag
17102
P
m²
Kitc
20
21 m²
anging
m²Kitch
Jamming
Re
36
R
3
Room
10
Storag
19
9
46
31
1:8
RAMP
TO
BASEMEN
FR
U
D m²
etail
estaur
P
ROP
m² e
ium
ception
OM
hen ay
BASEMENSpace
en
Room
18
8
19
Walkw
R
D
TO
RAMP
1:8
A
1
17
Jamming
3
209
Room
Auditor
Ch
Storag
Soup
Kitc
15
Backstage
FR
31
BASEMEN
22
14
U
20
10
Re
Office
Meeting
36
21
9
46102
m²
estaur
ROP
P
etail
m²
anging
OM
ception
BASEMEN
hen
m²Kitch enStor
U
D
eTOF
ant
P
OWN
Studio
eF
T T
0
Stor
D
U
eay
ium
OFOWN
P
ant
Space
Studio
T
F
eRoom
0
N
SITE PLAN | 1:500
1 11 Dec 2020 Building Plans
CHOW KIT MUSIC
CENTRE
24
50 B6 C3 C4
D/P
F/A
45
00 23
551 B7 B/G
H/R
15
00
23
B8 K
67
16
34 B9 2000
6710
2600
2110
SD
EL
59
99 B10
SERVICE LANE
A9 98
1
18
80
44
50
F2 B42
A8 24
50
3500
00
3119
55
D3
Block G, 10th Floor
A7 Soup Kitchen
- CT
FD1
No.2, Jalan PJU 1A/7A, Ara Damansara, PJU 1A
47301 Petaling Jaya, Selangor
CR HT
MV 4000
Hotline: 1-800-88-1118
3
23 m²
00
SE
FFL: 0.20
45
CA
Outside Malaysia : +603-7849 5000
AIR
45MM THK. FIRE DOOR D1 Auditorium
ST
FP PP
TB TS Walkway
MV 4000 FP PP
A6
210 m²
Office FFL: 0.25
CR TS
FP PP MV 4000 Auditorium Storage
CR HT 19 m² FP PP
FFL: 0.25
AC 4000 CR TS
D1
TOILET CUBICLE WITH PHENOLIC 14 m²
FFL:0.25
MV
19 m²
4000
Cascading Seats
BOARD TO SPECIALIST DETAIL Meeting Space
- -
D2
FFL
Michael Reeves
00
TB -
FP PP
FD1 NV 4000
60
CR HT 95 m²
E3
NV 4000 FFL: 0.25
A5
FFL:0.20
Changing Room
FP PP
M&E TB TS
- - MV 4000
CR - 8 m²
NV 4000 Male Toilet FFL: 0.25
6 m²
FFL: 0.25
DSPG
HT
CT
-
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
NV 4000
pembinaan yang dijalankan"
E2
2 m²
D1 FFL: 0.25 D2
D2
wc D3
00
w c D3 D2
00
20
Water Riser D1 w
wcc
55
- -
w Washing Basins Meeting Room Architects
A4 E1 wcc
00
CR - DSPG CT FP PP
20
NV 4000 HT -
FD1 FD1 TB TS
80 60
5 m² NV 4000 FROM TO
89 19 FFL: 0.25 16 m²
MV 4000
95
16 m²
FD1 BASEMENT BASEMENT
34
wc
w c wc
w
D3
FFL: 0.25 FFL:0.25
CARPARK CARPARK MOA Architects
c wc
78
DN Female Toilet
150MM THK. BRICK WALL TO
4
HT - FP -
SPECIALIST DETAIL
CA
OKU TOILET
78
NV 4000 CR -
A3
DSPG Ct
28
AIR
7 m²
61 m²
ST
T
NV 4000 FFL: 0.30
LIF
40
3 m²
ST FFL:0.25 150 UP
RC STAIRCASE C/W 1000MM HT AIR
10
CA
D2
SE
15
39
Architect Signature
65
00
E
Lobby
T
SE
A2
FP PP
CR -
RC LIFT SHAFT TO ENGR'S Rehearsal Corner 5
10
ST NV 4000 FP PP
AIR
54
46 m²
DETAILS CA FFL: 0.10
CR -
8
SE NV 4000
1 20 m²
FFL: 0.10 D1
D3
DN
Ar. Tan Ewe Liat
55
ARKITEK
66
Rehearsal Corner 4
36
55
13
48
FP PP
40
49
CR -
Jamming Studio 1 Reception
D3
NV 4000 FP PP FP PP
A1
80
13 m² TB TS TB TS
72
FFL: 0.10
MV 4000 MV 4000
24 m² 20 m²
FFL: 0.20 FFL: 0.20
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
07
D3
28
Jamming Studio 3
FP PP Rehearsal Corner 3 D3
FP PP
TB TS
MV 4000
CR -
Rehearsal Corner 1 M&E Engineer
METAL FRAME TIMBER DOOR
00
31 m² NV 4000 FP PP
11 m²
25
FFL: 0.20 CR -
FFL: 0.10
TO DETAILS NV
13 m²
4000
LLO
OAAD
Jamming Studio 2
FP PP
FFL: 0.10
Yang Fong M&E Engineering Trading Sdn Bhd
DIIN
N G
TB TS
DROP OFF
30
GBBA
MV
25 m²
4000
49
AY
Y FFL: 0.20 Rehearsal Corner 2
No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
FP PP
00
CR -
50
NV 4000
11 m²
FFL: 0.10
Lama, Taman United, 58200 Kuala Lumpur
D3 Storage
- -
CR -
MV
10 m²
4000
C&S Engineer
FFL: 0.25
D3
Kitchen
FP
HT
PP
HT
DN
SMC (M) Sdn Bhd
MV 4000
150 UP 12 m²
FFL: 0.25
150 UP Retail Store
SPECIALIST DETAIL
FFL: 0.20
D1
Industrial Park, 47500 Subang Jaya, Selangor
D3
Restaurant
FP PP
TB TS
Landscape Architect
SA
D3
FFL: 0.712m
FFL: 0.712m
JA
Open Exhibition
FP PP Interior Designer
CR HT
AV 4000
93 m²
FFL: 0.25
Drawing Title
1 DN DBKL/BP/04-01
DBKL/BP/04-02
DN
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/03-01
N
GROUND FLOOR PLAN |1:250
CHOW KIT MUSIC
B1 CENTRE
B2
B3
B4
B5 C1 C2 C3 CADANGAN MEMBINA 1 BLOK PUSAT MUSIK KOMUNITI 4
TINGKAT ATAS LOT 407, JALAN IPOH, CHOW KIT, SELANGOR
B6 C4 DARUL EHSAN
B7 UNTUK TETUAN:
36
01
B8 SIME DARBY PROPERTY
15
00 B9 D/P
F/A
B10
24
50
B/G
45 23
00 551 H/R
RC STAIRCASE C/W 1000MM HT 15
00 K
GLASS & SS RAILING TO DETAILS
R= 174, T=280 (22 STEPS) 23
67 SD
A9 16
34
6710 EL
59
99
2000
2600
1000MM HT
HT STAINLESS
STAINLESS STEEL
STEEL
F2 1000MM 2110
B42
A8 RAILING TO DETAIL
RAILING TO DETAIL
00
45
79
3500
01
59
01
F1 Control Room
FP
TB
PP
TS
00
20 MV 4000
00
55
23 m²
A7
FFL: 0.25
00
Music and Theatre Storage
00 0
D4 D4
60
- PP
10
CR TS
AC 4000
D1 14 m²
FFL: 0.25
D4
DN DN
Land Owner & Developer Signature
3
45MM THK. FIRE DOOR D1
SE
00
46
CA
Sime Darby Property Berhad Ara Damansara
AIR
A6
D1
ST
00
Block G, 10th Floor
55
00
Music & Theatre Studio
20
FP PP
10837
BOARD TO SPECIALIST DETAIL DN
AC
39 m²
4000
FFL:0.25
No.2, Jalan PJU 1A/7A, Ara Damansara, PJU 1A
Waiting Lounge
FP PP
47301 Petaling Jaya, Selangor
E3 DN
TB TS
75
A5
MV 4000
FD1
Hotline: 1-800-88-1118
40
67 m²
FFL:0.25
55
M&E
Outside Malaysia : +603-7849 5000
E2
40
- -
000
6 m² HT TB TS
25
FFL: 0.25 NV 4000 AC 4000
19
2 m² 28 m²
FFL: 0.25 FFL:0.25
DN
wc
w DN
c wc
w c Stage Management Office
60 wc Washing Basins
A4 E1 w
Water Riser FP PP
19 - - c DSPG CT
TB TS
Michael Reeves
65
HT
3500
80
CR - MV 4000
51
89
00
NV 4000 NV 4000 20 m²
16 m²
60 w
20
5 m² FFL:0.25
19 wcc FFL: 0.25
wc
w
02
0 80 c wc
55
7 89 w c
75
78
27
20
D1
SE 0
70 UP Female Toilet
CA 548
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
4
DSPG CT
D1
HT - OKU Toilet
RC STAIRCASE C/W 1000MM HT NV 4000 DSPG CT pembinaan yang dijalankan"
7 m² Discussion Area Viewing Deck 2
AIR
HT -
GLASS & SS RAILING TO DETAILS FFL: 0.25 - - D1 - -
5677
NV 4000
ST
CR - CR -
3 m²
77
R= 174, T=280 (22 STEPS)
T
FFL: 0.25 NV 4000 NV 4000
Music Training Room 2
27
LIF
18 m² 13 m²
80
A3
AIR TB TS
35
RC STAIRCASE C/W 1000MM HT CA AC 4000
14
D2
SE 26 m²
70
2 Music Training Room 1
39
FFL: 0.25
GLASS & SS RAILING TO DETAILS
00
MOA Architects
FP PP
00
E
LIF RVIC
TB TS
R= 174, T=280 (22 STEPS) AC 4000
26 m²
T
SE
FFL: 0.25
30
10
ST
AIR
Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
54
DETAILS
A2
CA
8
SE
1
00
Indah,
25
6
Waiting Area
66
SE
DN - -
48
CA
CR -
D3
AIR
NV 4000
A1
27 m²
ST
FFL: 0.25
Architect Signature
00
- -
CA
CR -
AIR
NV 4000
23 m²
ST
FFL: 0.25
00
D3
17
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
5° SLOPE
Viewing Deck 1
- -
M&E Engineer
CR -
NV 4000
40 m²
FFL: 0.25
ST
AIR
CA
Yang Fong M&E Engineering Trading Sdn Bhd
SE
7
FFL: 0.25
C&S Engineer
RC COLUMN TO ENGR'S DETAILS
95
32
81
5 D3 Quantity Surveyor
11
35
SC QS Consult Sdn Bhd
68
Viewing Deck
CR
- -
-
No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
Closed Exhibition
FP PP
NV
55 m²
4000
FFL: 0.25
Selangor, 47620 USJ Subang Jaya
TB TS
AC 4000
109 m²
FFL: 0.25
Landscape Architect
IRS
TA
NS
IO
IBIT
DN EXH
94300 Kota Samarahan, Sarawak
10
52
DN
5
28
15
Interior Designer
2
15
DBKL/BP/04-01
Drawing Title
1
DBKL/BP/04-02
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/03-02
B1
B2 CADANGAN MEMBINA 1 BLOK PUSAT MUSIK KOMUNITI 4
TINGKAT ATAS LOT 407, JALAN IPOH, CHOW KIT, SELANGOR
B3 DARUL EHSAN
B4 UNTUK TETUAN:
B5 C1 C2
36
01
C3 C4 SIME DARBY PROPERTY
15
00
24
50
B6 D/P
F/A
45
00 235
B7 6710
B/G
B8
51
2000 H/R
2600
15
00 2110
K
23
67
16
B9 SD
B10
34
EL
59
99
A9
F2 B42
A8
00
45
3500
00
60
Block G, 10th Floor
No.2, Jalan PJU 1A/7A, Ara Damansara, PJU 1A
47301 Petaling Jaya, Selangor
Hotline: 1-800-88-1118
Outside Malaysia : +603-7849 5000
A6
00
55
A5 E3 Michael Reeves
55
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
A4 E1
65
51
5° SLOPE
Architects
60
80 19
89 ST
FD1
MOA Architects
D1
AIR
CA
SE
2
5°
20
SL
RC STAIRCASE C/W 1000MM HT 70
Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
OP
T
E
GLASS & SS RAILING TO DETAILS
LIF
Indah,
80
39
T
Lobby
L IF
00
FP PP
ICE
CR -
NV 4000
RV 45 m²
- Dormitory Architect Signature
SE
FB PP
105
TB TS
48
AC 4000
20 m²
DETAILS
00
FFL: 0.25
25
DN
66
6
48
E
D3
D1
C
A1
AIR
ARKITEK
00
ST
50
Accomodation
E
FB PP
AS
TB TS
METAL FRAME TIMBER DOOR
C
AIR
AC 4000
29 m²
D1
TO DETAILS
ST
FFL: 0.25
Balcony
FP PP
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
CR - undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
NV 4000
26 m²
FFL: 0.25
M&E Engineer
Landscape Architect
Interior Designer
1
DBKL/BP/04-02
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/03-03
Level 2
CHOW KIT MUSIC
CENTRE
UNTUK TETUAN:
B3 B/G
H/R
B4 K
B5 C1 C2 SD
36
01
C3 C4 EL
15
00
24
B6
B7
50
B8
45 235
00 51
15
B9
00
6710
23
67
B10
16
34
2000
2600
2110
59
99
00
45
Hotline: 1-800-88-1118
3500
5° SLOPE
A7 00
60
Michael Reeves
Chief Operating Officer
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
Architects
A5 E3 MOA Architects
55
E2
40
0
00
Indah,
58100 Kuala Lumpur, Malaysia.
A4 E1
65
80 60
51
89 19
Architect Signature
5° SLOPE
20
70
DN FD1
D1
Ar. Tan Ewe Liat
200MM THK. PRECAST FIBER-
ARKITEK
80
ST
REINFORCED CONCRETE TO
72
A3
AIR
CA Lift Room
D2
SPECIALIST DETAIL SE FP PP
2
39
CR -
NV 4000
00
15 m²
FFL: 0.25
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
105
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
A2
48
00
25
M&E Engineer
66
48
Yang Fong M&E Engineering Trading Sdn Bhd
A1 5 DEGREES PITCHED METAL ROOF D3
00
SCREWED TO STEEL TRUSS No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
5°
SL
OP
E
Lama, Taman United, 58200 Kuala Lumpur
ER
TT
GU
OF
RO
C&S Engineer
Quantity Surveyor
E
OP
OF
GU
TT
ER
Landscape Architect
RO
Drawing Title
2
DBKL/BP/04-01
1
DBKL/BP/04-02
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/03-04
B5B6
01
15
00
15
00
B9 2000
2600
2110
23
67
16
B10 UNTUK TETUAN:
34
A9 K
H/R
SD
F2 B42
A8
EL
00
45
F1
5° SLOPE
A7
00
60
A6 5 DEGREES PITCHED METAL ROOF
00
55
LAID ON 61MM STEEL BATTEN, Land Owner & Developer Signature
SCREWED TO STEEL TRUSS
E2
40
0
00
Hotline: 1-800-88-1118
Outside Malaysia : +603-7849 5000
A4 E1
65
E
80
5° SLOP
60
51
89 19
20
70
Michael Reeves
D1 Chief Operating Officer
ER
TT
5°
GU
OF
SL
5°
RO
SL
OP
OP
E
E
80
72
A3 D2
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
GUTTER
pembinaan yang dijalankan"
39
ROOF
00
ER
TT
5 DEGREES PITCHED METAL ROOF
A2
GU
Architects
OF
RO
LAID ON 61MM STEEL BATTEN,
105
SCREWED TO STEEL TRUSS
48
MOA Architects
00
25
66
Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
48
A1 D3 Indah,
00
50
TT ER
5°
58100 Kuala Lumpur, Malaysia.
GU
SL
OF
OP
RO
E
Architect Signature
ER
TT
GU
OF
RO
Ar. Tan Ewe Liat
ARKITEK
5 DEGREES PITCHED METAL ROOF
5° SLOPE
LAID ON 61MM STEEL BATTEN,
SCREWED TO STEEL TRUSS
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
TT ER
GU
OF
RO
M&E Engineer
C&S Engineer
OP
GUTTER NAILED TO
SL
FASCIA
5°
Quantity Surveyor
OP
E Landscape Architect
SL
5°
Interior Designer
1 Drawing Title
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing
Number DBKL/BP/03-05
15
B5B6 C3 C4 DARUL EHSAN
00
24
50
B7B8 6710 UNTUK TETUAN:
45 23
B9
00 551
15
2000
2600 SIME DARBY PROPERTY
00 2110
23
67
16
B10 D/P
F/A
34
B/G
59
H/R
99
SD
A9 EL
F2 B42
A8
00
45
3500
F1
A7
00
60 Land Owner & Developer Signature
85
19
47301 Petaling Jaya, Selangor
Hotline: 1-800-88-1118
A5 E3 1:8 RAMP SLOPE
00
Outside Malaysia : +603-7849 5000
41
M&E Room
55
E2
- -
40
CR -
000
NV
6 m²
4000
UP
40
FFL:0.25
00
1:8 RAMP SLOPE
20
Water Tank Room
- -
A4 E1 CR -
UP Michael Reeves
65
NV 4000
80 60
5 m²
51
89 51
19 31 FFL:0.25
1 Architects
16
80
72
ST
A3 AIR
CA
SE
D2 MOA Architects
39
2 21
00
A2 Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
10
54
22
8
Indah,
00
2
25
20
58100 Kuala Lumpur, Malaysia.
66
30 CARPARKS PROVIDED 23
48
2500MM x 4800MM
A1 19 Basement Carpark
- -
D3 Architect Signature
00
CR -
50
MV 4000
1643 m²
FFL: 0.25
18
24
26
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
16
27
M&E Engineer
15
Yang Fong M&E Engineering Trading Sdn Bhd
4
C&S Engineer
5
29
49
27
SMC (M) Sdn Bhd
14
UP
12
Quantity Surveyor
7
Landscape Architect
Interior Designer
Drawing Title
1
DBKL/BP/04-02
Building Plans
Scale Date
Drawn By Check By
No. Lukisan
Drawing
Number
UNTUK TETUAN:
Michael Reeves
Chief Operating Officer
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
Architects
MOA Architects
Roof Plan
Ar. Tan Ewe Liat
16820 ARKITEK
(ROOF CONSTRUCTION)
METAL DECK ROOF AT 2° SLOPE ON
METAL TRUSS SYSTEM C/W HOMOGENOUS "Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
SISALATION C/W 150MM THK. INSULATION undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
BOARD TO ROOF SPECIALISTS'S DETAIL
Level 3 M&E Engineer
12000
Balcony
Yang Fong M&E Engineering Trading Sdn Bhd
FP PP
CR -
Accomodation Lobby
FB PP FP PP
NV 4000 TB TS CR -
Rehearsal Corner 1
Ground Floor Level
NV 4000
FP PP 13 m²
CR -
FFL: 0.10 DOORS AND WINDOWS REFER
NV
13 m²
4000
TO SCHEDULE
Quantity Surveyor
150 FFL: 0.10
Road Level
SC QS Consult Sdn Bhd
0
Basement Carpark
- -
No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
R.C. COLUMN TO ENGR'S
CR
MV
-
4000
1643 m² DETAIL
Selangor, 47620 USJ Subang Jaya
FFL: 0.25
Interior Designer
Drawing Title
SECTION A-A'
Building Plans
Scale 1:200 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/04-01
UNTUK TETUAN:
Michael Reeves
Chief Operating Officer
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
Architects
MOA Architects
Architect Signature
MONOPITCH STEEL TRUSS TO ENGR'S "Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
DETAILS undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
(ROOF CONSTRUCTION)
METAL DECK ROOF AT 2° SLOPE ON
METAL TRUSS SYSTEM C/W HOMOGENOUS M&E Engineer
SISALATION C/W 150MM THK. INSULATION
Level 3 BOARD TO ROOF SPECIALISTS'S DETAIL
Yang Fong M&E Engineering Trading Sdn Bhd
12000
Music Library
TB
FP PP
TS No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
MV 4000 Accomodation
178 m²
FFL: 0.25
FB
TB
PP
TS Lama, Taman United, 58200 Kuala Lumpur
R.C. STAIRCASE TO ENGR'S AC
29 m²
4000
Interior Designer
Drawing Title
SECTION B-B'
Building Plans
Scale 1:200 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/04-02
UNTUK TETUAN:
Michael Reeves
Chief Operating Officer
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
Architects
MOA Architects
Architect Signature
Roof Plan
16820
Ar. Tan Ewe Liat
ARKITEK
(ROOF CONSTRUCTION)
CURVED METAL DECK ROOF AT 5° SLOPE ON
METAL TRUSS SYSTEM C/W HOMOGENOUS "Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
Level 3 SISALATION C/W 150MM THK. INSULATION undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
BOARD TO ROOF SPECIALISTS'S DETAIL
12000 (ROOF CONSTRUCTION)
METAL DECK ROOF AT 5° SLOPE ON DOORS AND WINDOWS REFER TO SCHEDULE M&E Engineer
METAL TRUSS SYSTEM C/W HOMOGENOUS
SISALATION C/W 150MM THK. INSULATION
BOARD TO ROOF SPECIALISTS'S DETAIL Yang Fong M&E Engineering Trading Sdn Bhd
200MM x 150MM G.I. GUTTER
NAILED TO FASCIA
Level 2
No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
8000 Lama, Taman United, 58200 Kuala Lumpur
150MM THK B/WALL C/W
PLASTERING BOTH SIDES
1100MM HEIGHT STAINLESS STEEL C&S Engineer
RAILING TO MANUF'S DETAIL
Level 1 SMC (M) Sdn Bhd
4000 1000MM HT STAINLESS STEEL
RAILING TO DETAIL
Lot 36 & 37, Jalan Delima 1/1, Subang Hi-tech
Industrial Park, 47500 Subang Jaya, Selangor
Ground Floor Level
150 Quantity Surveyor
Interior Designer
Drawing Title
EAST ELEVATION
Building Plans
Scale 1:200 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/05-01
UNTUK TETUAN:
Michael Reeves
Chief Operating Officer
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
Architects
(ROOF CONSTRUCTION)
METAL DECK ROOF AT 2° SLOPE ON MOA Architects
METAL TRUSS SYSTEM C/W HOMOGENOUS
SISALATION C/W 150MM THK. INSULATION
BOARD TO ROOF SPECIALISTS'S DETAIL Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
Roof Plan Indah,
16820 58100 Kuala Lumpur, Malaysia.
150MM THK B/WALL C/W
PLASTERING BOTH SIDES
Architect Signature
200MM x 150MM G.I. GUTTER
NAILED TO FASCIA
Level 3
Ar. Tan Ewe Liat
12000 ARKITEK
DOORS AND WINDOWS REFER TO SCHEDULE
METAL FRAME TIMBER DOOR TO DETAILS
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
Level 2
8000 M&E Engineer
C&S Engineer
Ground Floor Level
150 SMC (M) Sdn Bhd
Road Level Lot 36 & 37, Jalan Delima 1/1, Subang Hi-tech
0 Industrial Park, 47500 Subang Jaya, Selangor
Landscape Architect
Interior Designer
Drawing Title
WEST ELEVATION
Building Plans
Scale 1:200 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/05-02
UNTUK TETUAN:
1810
Michael Reeves
Chief Operating Officer
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
2110
Architects
MOA Architects
Architect Signature
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
M&E Engineer
C&S Engineer
Quantity Surveyor
Landscape Architect
Interior Designer
Drawing Title
FD1
1810mm 2110mm Revision Date Note
Drawn By
Date
Check By
No. Lukisan
Drawing
Number
CHOW KIT MUSIC
CENTRE
UNTUK TETUAN:
750 800
SIME DARBY PROPERTY
!"#$%&'()$*)& !"#$%&'()$*)&
47301 Petaling Jaya, Selangor
Hotline: 1-800-88-1118
Outside Malaysia : +603-7849 5000
!"#$%&'($)*+#,-&'%%#.$) !"#$%&'($)*+#,-&'%%#.$)
Michael Reeves
Chief Operating Officer
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
2200
2200
Architects
MOA Architects
Architect Signature
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
M&E Engineer
C&S Engineer
Quantity Surveyor
Landscape Architect
LITY DESCRIPTION
+,-'.%/'.%'0"1&2'+3%41 +,-'.%/'.%'0"1&2'+3%41
Urbanscape Consultant Sdn Bhd
/012341 /012341
E OF ISSUE
Interior Designer
(5'61&7)8$),)&'.+9':'+;.'<=> (5'61&7)8$),)&'.+9':'+;.'<=>
Matt Design Sdn Bhd
750
Drawing Title
800
D1 D2
800mm
Scale Date
Drawn By Check By
CKED BY DATE
No. Lukisan
KITCHEN, RECEPTION, SOUP KITCHEN, OFFICE, M&E, WATER RISER MEETING ROOM, CHANGING ROOM, STORAGE, WALKWAY
PROJECT NUMBER Number Status
Drawing
Number
REV
DORMITORY, ACCOMODATION
CHOW KIT MUSIC
CENTRE
UNTUK TETUAN:
810
Michael Reeves
Chief Operating Officer
2100
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
Architects
MOA Architects
Architect Signature
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
M&E Engineer
C&S Engineer
Quantity Surveyor
Landscape Architect
Interior Designer
810 1010 No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
Selangor, 47620 USJ Subang Jaya
Drawing Title
D3 D4
810mm 1010mm
Revision Date Note
Drawn By Check By
No. Lukisan
Drawing
Number
CHOW KIT MUSIC
CENTRE
UNTUK TETUAN:
2000
1810
1210
47301 Petaling Jaya, Selangor
Hotline: 1-800-88-1118
Outside Malaysia : +603-7849 5000
Michael Reeves
Chief Operating Officer
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
2500
2500
Architects
MOA Architects
Architect Signature
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
M&E Engineer
C&S Engineer
Quantity Surveyor
Landscape Architect
2000 1810
Urbanscape Consultant Sdn Bhd
Interior Designer
Drawing Title
1810mm
Revision Date Note
Drawn By Check By
No. Lukisan
Drawing
Number
Adalah saya mencadangkan agar maksud utama penggunaan cadangan projek seperti di atas
dalam KUMPULAN MAKSUD III (JADUAL KELIMA) dan keperluan kelengkapan keselamatan
kebakaran adalah seperti berikut.
CHOW KIT MUSIC
Pelan Tapak
CENTRE
HOSPITAL 1. Adakan6 buah pili bomba jenis tiang pengeluaran dua hala dengan pengeluaran air sebanya
1500 liter seminit bagi setiap pili bomba dan 3000/ 4500 lit/ min apabila 2/3 buah pili bomba dibuka
serentak (pressurized hydrant).
KUALA LUMPUR 2. Mengadakan 2 talian hos erukuran 64mm x 30 meter dan sebatang nozel dari jenis ‘jet & spray’
yang ditempatkan di dalam peti kabinet berhampiran dengan tiap- tiap pili bomba.
3. Adakan jalan akses perkakas bomba (access road) deng kelebaran tidak kurang 6 meter yang
boleh menanggung beban 25 tan sepertiman yang ditandakan didalam pelan. CADANGAN MEMBINA 1 BLOK PUSAT MUSIK KOMUNITI 4
4.Pili bomba sediada hendaklah dalam jaraj 91.5 meter dari bangunan cadangan dan berada dalam
keadaan baik.
TINGKAT ATAS LOT 407, JALAN IPOH, CHOW KIT, SELANGOR
5.Kecerunan jalan akses perkakas bomba hendaklah tidak kurang 1:12. DARUL EHSAN
6.Ketinggian kelegaan hendaklah tidak kurang daripada 5 meter.
7.Jarak antara bangunan hendaklah mematuhi Jadual Ke Enam UUKBS 1984.
UNTUK TETUAN:
Kehendak-kehendak Am
SIME DARBY PROPERTY
1.Semua pendawaian elektrik bagi sistem kecemasan hendaklah dalam konduit logam atau
daripada kabel yang mempunyai penebatan mineral tahan api. Pemasangannya hendaklah
sepanjang kawasan yang paling kurang risiko kebakarannya dan mematuhi UUK 253(4), UUKBS
1984.
2.Semua elemen struktur hendaklah mempunyai tempoh ketahanan api mengikut Jadual
Kesembilan, UUKBS 1984.
3.Adakan sistem pengudaraan bagi tangga keselamatan sama ada secara biasa atau mekanikal
4.Penggunaan gas petroleum cecair (L.P.G) secara ‘bulk storage’ hendaklah mematuhi syarat-
syarat penentuan Piawaian Malaysia MS 830 dan Ms 930. Sila kemukakan pelan yang lengkap ke
Jabatan ini.
5.Bagi bangunan yang melebihi 30 meter, semua tangga yang dicadang untuk digunakan sebagai
jalan keluar hendaklah dilanjutkan ke paras bumbung untuk memberi akses kepadanya mengikut
UUK 195, UUKBS 1984.
6.Semua papan tanda keselamatan kebakaran hendaklah mematuhi Piawaian Malaysia MS 982.
7.Adakan ‘graphic design of floor plan’ berlatarbelakang warna putih yang menunjukkan tangga
keselamatan, laluan-laluan keselamatan, jalan-jalan keluar dan kedudukan alat- alat pencegah
CHOW KITBARU
KG.
kebakaran. Penenmpatannya hendaklah ditempat yang mudah dilihat.
Sila kemukakan tiga (3) set buku operasi mengikut syarat syarat Jabatan Bomba dan Penyelamat
MONORAIL Malaysia.
[18:41, 12/12/2020] Elvin: hendak-kehendak Pasif
CHOW KIT STATION 1. Penggunaan siling bangunan hendaklah menepati kehendak-kehendak UBBL 1984 Jadual
Kelapan.
2. Semua tangga keselamatan hendaklah dikepung dengan tembok batu bata setebal
100mm atau bagi tangga jenis terbuka mematuhi UBBL 1984. Land Owner & Developer Signature
3. Adakan pintu api satu jam sepertimana yang ditandakan di dalam pelan. Pemasangannya
hendaklah tertutup sendiri dan tertutup rapat. Sime Darby Property Berhad Ara Damansara
4. Adakan dinding pemetakan (compartment wall) setebal 100mm / 200mm batu-bata yang dibina
sehingga paras bumbung/ lantai sepertimana yang ditandakan di dalam pelan. Block G, 10th Floor
5. Dinding bagi bilik setor yang disifatkan merbahaya hendaklah setebal 100mm batu- bata dan No.2, Jalan PJU 1A/7A, Ara Damansara, PJU 1A
pintunya dari jenis ketahanan api satu jam dipasang dengan `door closer’. 47301 Petaling Jaya, Selangor
6. Adakan ‘break point’ pada dinding luar bangunan untuk tujuan memudahkan anggota bomba
menjalankan kerja-kerja operasi. Hotline: 1-800-88-1118
7. Adakan bidai gulung [roller shutter] ketahanan api 2 jam / 4 jam seperti tertanda di dalam pelan. Outside Malaysia : +603-7849 5000
8. Penggunaan kaca-kaca pada dinding luar bangunan hendaklah dari jenis yang dibenarkan oleh
Jabatan Bomba dan Penyelamat Malaysia.
9. Semua lubong perkhidmatan (service shaft) hendaklah ditutup disetiap tingkat dengan bahan
ketahanan api dua jam.
10. Semua bilik bagi penempatan pam bomba dan janakuasa hendaklah dibina dari tembok batu- Michael Reeves
bata ketahanan api dua jam. Pintu-pintunya hendaklah ketahanan api satu jam.
11. Dinding dua pihak hendaklah dari jenis batu-bata setebal 200mm jenis yang menanggung Chief Operating Officer
beban dan 100mm yang tidak menanggung beban. Dinding ini hendaklah dinaikkan 225
mm melebihi paras bumbung atau mematuhi rekabentuk yang dipersetujui oleh Jabatan Bomba "Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
dan Penyelamat Malaysia. pembinaan yang dijalankan"
12. Semua dinding pembahagi dalaman hendaklah dari jenis ketahanan api ½ jam dan dari jenis
yang diluluskan oleh Jabatan Bomba dan Penyelamat Malaysia.
Architects
Dinding pengasing antara kilang dan pejabat hendaklah setebal 100mm / 200mm dan dinaikkan
N N hingga ke paras bumbung seperti tertanda di dalam pelan.Adakan dinding pembalik (deflector wall)
KEY PLAN | NTS LOCATION PLAN | NTS pada dinding yang mengepung tangga tunggal di pintu masuk utama sepanjang 450mm
sepertimana yang ditandakan di dalam pelan.
MOA Architects
Ruangan lobi lif hendaklah dibina dari bahan ketahanan api dua jam dan dilindungi dengan alat Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
pengesan asap mengikut UUKBS 1984.
Adakan sebuah pusat pemerintahan dan kawalan kebakaran di lantai tetuan (designated floor) Indah,
yang dilengkapi dengan peti penggera kebakaran bagi bangunan melebihi 30.5 meter tinggi. 58100 Kuala Lumpur, Malaysia.
B1 Kehendak-kehendak Aktif
Architect Signature
B2 1. Adakan sistem penyembur air automatik mengikut Piawaian Malaysia MS 1910 dan peruntukan
dalam UUKBS 1984.
B3 Adakan sistem pancur basah mengikut Piawaian Malaysia MS 1489 : Part 1 dan peruntukan dalam
UUKBS 1984.
Ar. Tan Ewe Liat
B4 2. Adakan sistem pancur kering mengikut Piawaian Malaysia MS 1489 : Part 1 dan peruntukan
dalam UUKBS 1984. ARKITEK
B5 3. Adakan sistem pancur menurun mengikut peruntukan dalam UUKBS 1984.
4. Adakan ...................unit saluran bantu mula mengikut Piawaian Malaysia MS 1489 : Part 1 dan
peruntukan dalam UUKBS 1984.
B6 5. Adakan .................unit penggera kebakaran jenis pecah kaca mengikut Piawaian Malaysia
MS 1745 : Part 14 dan peruntukan dalam UUKBS 1984.
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
A9 B7 C1 C2 6 Adakan sistem pengesan haba / asap mengikut Piawaian Malaysia MS 1745 : Part 14 dan
peruntukan dalam UUKBS 1984.
M&E Engineer
B8 C3 C4 Adakan lampu tanda `KELUAR’ kecemasan mengikut Piawaian Malaysia MS 985 dan dari jenis
yang diluluskan oleh Jabatan Bomba dan Penyelamat Malaysia. Yang Fong M&E Engineering Trading Sdn Bhd
B9 7. Adakan lampu kecemasan yang menggunakan dua kuasa karan sepertimana yang ditandakan di
dalam pelan. Lampu-lampu tersebut hendaklah dari jenis yang diluluskan oleh Jabatan Bomba dan
A8 B10 Penyelamat Malaysia.
8. Adakan ................. unit alat pemadam api mudahalih yang bersesuaian mengikut Piawaian
No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
Lama, Taman United, 58200 Kuala Lumpur
F2 Malaysia MS 1539: Part 3.
9. Adakan sistem pengurusan asap mengikut Piawaian Malaysia MS 1780 atau mana-mana
A7
B42 penentuan yang dibenarkan oleh Jabatan Bomba dan Penyelamat Malaysia.
10. Adakan sistem isitekan (pressurization system) mengikut Piawaian Malaysia MS 1472 dan
C&S Engineer
A5 E3 FD1
D1
D2
1984.
14. Adakan sistem komunikasi bomba (telefon bomba) dimana sistem komunikasinya hendaklah
Quantity Surveyor
E2 tiga hala dan penempatannya di dalam tangga keselamatan / lobi menentang kebakaran, bilik motor
lif, bilik pam bomba dan bilik janakuasa. SC QS Consult Sdn Bhd
A4 E1 D1
D1
D3 D3 D2
D2 D2
D1
15. Saluran pendingin hawa hendaklah dipasang dengan sesekat api (fire damper) mengikut
Piawaian Malaysia MS 555 dan dari jenis yang diluluskan oleh Jabatan Bomba dan Penyelamat No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
JA
FD1 FD1
FD1
D3 Malaysia.
Adakan suis pengasingan elektrik (electrical isolation switch) yang membolehkan pemotongan Selangor, 47620 USJ Subang Jaya
AZ LA A3 D2
bekalan kuasa elektrik ke tingkat atau zon berkenaan yang menggunakannya.
LA N S
Adakan sistem talian terus amaran kebakaran ke balai bomba terdekat dan pemasangannya Landscape Architect
hendaklah mematuhi syarat-syarat penentuan Jabatan Bomba dan Penyelamat Malaysia.
16. Adakan sistem busa [foam system] mengikut syarat-syarat penentuan NFPA atau mana-mana
N UL D3
D1 penentuan yang dibenarkan oleh Jabatan Bomba dan Penyelamat. Urbanscape Consultant Sdn Bhd
SH T A2
DN
D3 Adakan alat pengesan asap jenis kuasa tersendiri [self contained type smoke detector] mengikut
AH AN
syarat-syarat penentuan NFPA atau mana-mana penentuan yang dibenarkan oleh Jabatan Bomba 94300 Kota Samarahan, Sarawak
D3
dan Penyelamat.
D3
A1 Peringatan
Interior Designer
1. Segala syarat-syarat yang dikemukakan adalah tertakluk kepada rekabentuk dan kegunaan serta
D3 lokasi bangunan tersebut. Sekiranya sebarang perubahan yang dilakukan ke atas rekabentuk atau Matt Design Sdn Bhd
D3
kegunaannya seperti yang dicatatkan di atas pelan maka hendaklah dirujuk ke Jabatan ini untuk
dikaji semula.
2. Segala pemilihan bahan dan penggunaannya yang berkaitan dengan keselamatan kebakaran No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
D3 D1 bagi projek cadangan serta sistem pencegahan kebakaran hendaklah mematuhi UUKBS 1984 dan Selangor, 47620 USJ Subang Jaya
peraturan-peraturan yang diterima sahaja dan yang dibenarkan oleh Jabatan Bomba dan
Penyelamat Malaysia.
3. Bagi bangunan yang rekabentuknya melebihi 18.5 meter hingga ke lantai penuh yang tertinggi Drawing Title
D3 sekali, sesalur-sesalur naik mengikut Undang-Undang Kecil 232 hendaklah dipasang sebaik sahaja
selepas bangunan itu melebihi tinggi tersebut untuk mengadakan kemudahan-kemudahan SITE, KEY AND LOCATION PLAN
D3 mencegah kebakaran dalam masa berbagai peringkat pembinaan itu.
4. Pengesahan pelan ini adalah tidak tertakluk kepada penyimpanan, penggunaan, pemerosesan
dan penghasilan bahan berbahaya atau kimia berbahaya. Sekiranya terdapat sebarang
penyimpanan, pengunaan, pemerosesan dan penghasilan bahan berbahaya atau kimia berbahaya
setelah pelan disahkan maka pelan bangunan tersebut hendaklah dirujuk kembali ke jabatan ini
untuk dikaji semula.
5. Pelan lukisan dan pengiraan bagi semua pemasangan tetap hendaklah dikemukakan ke Jabatan
Bomba dan Penyelamat, Malaysia. Jumlah pelan-pelan yang perlu dikemukakan hendaklah dua
perenggu.
JALAN PAHANG
JALAN PAHANG
A
1
209
U
Auditor
22
Soup
14
Meeting
Office
15
Backstage
19
Walkw
8
Ch
18
Storag
17102
P
m²
Kitc
20
21 m²
anging
m²Kitch
Jamming
Re
36
R
3
Room
10
Storag
19
9
46
31
1:8
RAMP
TO
BASEMEN
FR
U
D m²
etail
estaur
P
ROP
m² e
ium
ception
OM
hen ay
BASEMENSpace
en
Room
18
8
19
Walkw
R
D
TO
RAMP
1:8
A
1
17
Jamming
3
209
Room
Auditor
Ch
Storag
Soup
Kitc
15
Backstage
FR
31
BASEMEN
22
14
U
20
10
Re
Office
Meeting
36
21
9
46102
m²
estaur
ROP
P
etail
m²
anging
OM
ception
BASEMEN
hen
m²Kitch enStor
U
D
eTOF
ant
P
OWN
Studio
eF
T T
0
Stor
D
U
eay
ium
OFOWN
P
ant
Space
Studio
T
F
eRoom
0
N
SITE PLAN | 1:500
1 11 Dec 2020 Building Plans
CHOW KIT MUSIC
CENTRE
36
01
B7B8 F/A
B/G
15
00
24
50
B9 H/R
45
00
23
551
B10 K
SD
15 EL
00
23
67
6710
16
34
24
84
A9 35
15
2000
2600
2110
F2 B42
A8
Land Owner & Developer Signature
00
45
3500
F1 D3
Sime Darby Property Berhad Ara Damansara
Block G, 10th Floor
A7 SD
FD1
No.2, Jalan PJU 1A/7A, Ara Damansara, PJU 1A
47301 Petaling Jaya, Selangor
00
60
Soup Kitchen K
K
-
CR
MV
CT
HT
4000
Hotline: 1-800-88-1118
D1
23 m²
FFL: 0.20 Walkway
FP
CR
PP
TS
Outside Malaysia : +603-7849 5000
MV 4000
19 m²
A6
K FFL: 0.25
Auditorium Storage
SD FP PP
D1 CR TS
Office MV 4000
FP PP 19 m²
00
CR HT
SD FFL SD
D2
55
Meeting Space
Michael Reeves
AC 4000
FD1 14 m² FP PP EL
K FFL:0.25 CR HT EL
D/P NV 4000 EL
F/A 10 m²
E3 H/R
SD
EL
Changing Room
E2
EL FP PP
M&E
B/G
UP
- - TB TS
CR - Auditorium MV 4000
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
FP PP 8 m²
55
NV 4000
6 m² TB TS FFL: 0.25
pembinaan yang dijalankan"
40
000
D3 FFL: 0.25 D2
FD1 D2 SD
D1 wc
w EL
c w EL
Architects
Water Riser wcc Washing Basins Meeting Room
A4 E1 60
FD1
K
CR
NV
-
5 m²
-
-
4000
FFL: 0.25
w
wcc
EL
D3
DSPG
NV
HT
16 m²
CT
-
4000
FFL: 0.25
EL
SD FD1
K K
FD1
FP
TB
MV
16 m²
PP
TS
4000
FFL:0.25
MOA Architects
19 wc
w
65
c wc
51
80 w
89 c wc
w c EL
Female Toilet EL InformalFPOpen Stage
Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
D1
EL
20 DSPG CT -
70 HT - CR -
NV
7 m²
4000
FFL: 0.30
Indah,
D/P
HT
NV
3 m²
-
4000 58100 Kuala Lumpur, Malaysia.
FFL:0.25
A3 EL H/R
K
D2 Architect Signature
80
72
Lobby
FP PP
CR -
A2 NV 4000
39
46 m²
EL
00
FFL: 0.10
SD EL
F/A Rehearsal Corner 5 D/P
EL FP PP
D1
CR -
D3 NV 4000
Ar. Tan Ewe Liat
10
20 m²
54
FFL: 0.10
00
8
ARKITEK
25
D3
Rehearsal Corner 4 Jamming Studio 1
A1
FP PP FP PP
CR - TB TS SD
66
NV 4000 EL MV 4000
SD Reception
48
13 m² 24 m²
FFL: 0.10 FFL: 0.20
SD FP PP
TB TS
MV 4000 "Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
00
20 m²
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
50
FFL: 0.20
D3
SD EL D3
SD
Rehearsal Corner 3
FP PP
M&E Engineer
Jamming Studio 3
CR -
FP PP Rehearsal Corner 1
TB TS NV 4000 FP PP
11 m² EL
Yang Fong M&E Engineering Trading Sdn Bhd
MV 4000 CR -
FFL: 0.10
31 m² NV 4000
FFL: 0.20 Jamming Studio 2
LLO
13 m²
FP PP SD FFL: 0.10
OAAD TB TS
DIIN
N MV 4000 K
G
GBBA
25 m² EL
No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
FFL: 0.20
AY
Y
Rehearsal Corner 2
FP
CR
NV
PP
-
4000
Lama, Taman United, 58200 Kuala Lumpur
11 m²
D3 FFL: 0.10
SD
Storage
- - C&S Engineer
EL CR -
MV
10 m²
4000
D3 UP
SD
SMC (M) Sdn Bhd
FFL: 0.25
EL
EL
Kitchen
FP PP
AC 4000
Restaurant FFL: 0.25
FP PP
39 m²
FFL: 0.20
MV
TB
36 m²
TS
4000
D1
Industrial Park, 47500 Subang Jaya, Selangor
D3 FFL: 0.20
SD EL VE
E Quantity Surveyor
OV
BO
E AB
A
I
I NE
N
O
R
R
LL SC QS Consult Sdn Bhd
L OO
O
FFL
11 STT
S
D3
No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
Selangor, 47620 USJ Subang Jaya
K
Landscape Architect
D3
SD Interior Designer
EL
Open Exhibition
FP
CR
AV
PP
HT
4000
Matt Design Sdn Bhd
93 m²
FFL: 0.25
Drawing Title
1
DBKL/BP/04-02 Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
15
B5B6 C3 C4
00
SIME DARBY PROPERTY
24
50
B7B8 6710
D/P
F/A
45 23
B9
00 551
2000 B/G
15 2600
00 2110 H/R
23
67
16
B10 K
34
SD
59
99 EL
A9
F2 B42
A8
1000MM HT STAINLESS STEEL
RAILING TO DETAIL
00
45
79
3500
01
59
01
F1 Control Room
FP
TB
PP
TS
SD
Land Owner & Developer Signature
00
Music and Theatre Storage 20 MV 4000
00
55
23 m² 6.37M
- PP
A7
FFL: 0.25
D4
00
CR TS
D4 EL
60
AC 4000
SD K
Sime Darby Property Berhad Ara Damansara
14 m²
00 0
4.3M
4 .9
FFL: 0.25
6M
10
D1 EL FD1
52.11°
D1
EL EL Block G, 10th Floor
DN DN
No.2, Jalan PJU 1A/7A, Ara Damansara, PJU 1A
3
45MM THK. FIRE DOOR EL
0.97M
D/P
SE
00
SD 47301 Petaling Jaya, Selangor
46
CA
12
D1
9.4
AIR
H/R
7°
Hotline: 1-800-88-1118
A6
EL 122.53°
0.9
ST
7M
00
55
00
TB TS
10837
7.56M
SD
20
BOARD TO SPECIALIST DETAIL DN
AC
39 m²
4000
EL
FFL:0.25
M
6.24
FP PP
E3
D/P TB TS
F /A DN
A5
MV 4000
67 m²
H/R
75
FFL:0.25
K
40
6.17M
55
M&E
E2
.91°
Michael Reeves
40
- - 102
61
D1
000
.37
CR - Male Toilet 11.2 4.35M
°
5M
6.08°
DSPG CT
NV 4000
D1
40
6 m² HT
FFL: 0.25 NV 4000 7.7
5M EL Teacher's Room
Chief Operating Officer
.47°
FP PP
2 m²
DN
13
25
FFL: 0.25 TB TS 6.83M
19
wc
w
AC
28 m²
4000
DN
c SD
6°
wc
3.9
FFL:0.25
w c EL
wc Washing Basins
A4 E1 w "Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
Water Riser EL SD
- - c DSPG CT
Stage Management Office
65
3500
HT
80
CR -
0 EL FP PP
51
89 96
00
NV 4000 NV 4000
1 EL 16 m² TB TS
wc
20
5 m² 7.08
FFL: 0.25
w c
FFL: 0.25 M MV 4000
wc
w
20 m²
FFL:0.25
EL c wc
w c Architects
3°
8.9
0
7.0
55
0 98 60
4°
8M
14.1
02 8 19
78
75 7.08M
7 EL
27 D1
Female Toilet SD
4
MOA Architects
°
DSPG CT .56
D1
80
41
SE
HT -
OKU Toilet
RC STAIRCASE C/W 1000MM HT
54
5677
CA
NV 4000 DSPG CT
.26° EL
7 m² Discussion Area Viewing Deck 2 41
AIR
HT -
GLASS & SS RAILING TO DETAILS 70
20 FFL: 0.25
NV 4000 EL - -
D/P
- -
.26°
ST
CR - CR - 41
3 m²
77
T
FFL: 0.25 NV 4000 NV 4000
Music Training Room 2
Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
27
LIF
18 m² 13 m²
D/P
80
A3
AIR TB TS
CA H/R
RC STAIRCASE C/W 1000MM HT
Indah,
AC 4000
EL EL
D2
SE
35
26 m²
EL 2 EL Music Training Room 1
39
FFL: 0.25
GLASS & SS RAILING TO DETAILS
14
FP PP
00
E
Lobby
58100 Kuala Lumpur, Malaysia.
LIF RVIC TB TS
R= 174, T=280 (22 STEPS) FP
CR
PP
-
AC 4000
26 m²
T
SE
A2
NV 4000 FFL: 0.25
23 m²
RC LIFT SHAFT TO ENGR'S FFL: 0.25
10
ST D/P
30
AIR
54
DETAILS
37
CA
8
SE F/A
D/P SD Architect Signature
7.08M
1
00
25
EL
RC LEDGE SLAB WITH DN
WATERPROOFING TO ENGR'S DETAIL
6
Waiting Area
66
SE
DN EL - -
48
CA
CR -
FD1FD1
D3
AIR
NV 4000
A1
27 m²
ST
FFL: 0.25
VOID
K SD
Ar. Tan Ewe Liat
00
2.3
5
5M
162.98° - -
CA
5.0 EL
12
2M CR -
6.0
AIR
2°
175.57° NV 4000
F/A D3 23 m²
ST
161.71°
H/R
17
B/G
SD
Mastering Studio
FP PP
TB TS EL
AC
27 m²
4000
METAL DECK ROOF AT 5° SLOPE M&E Engineer
FFL: 0.25
171.71°
5° SLOPE
H/R
Viewing Deck 1
- - D/P
No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
Lama, Taman United, 58200 Kuala Lumpur
CR -
NV 4000
40 m²
FFL: 0.25
ST
AIR
CA
6.22M
SE
7
C&S Engineer
200MM THK. PRECAST FIBER-
75.
69
°
11.19M
Music Library
REINFORCED CONCRETE TO D3
FP
TB
PP
TS
SMC (M) Sdn Bhd
SPECIALIST DETAIL K SD
MV
90 m²
4000
FFL: 0.25
EL
Lot 36 & 37, Jalan Delima 1/1, Subang Hi-tech
RC COLUMN TO ENGR'S DETAILS
Industrial Park, 47500 Subang Jaya, Selangor
Quantity Surveyor
85
SC QS Consult Sdn Bhd
16
95
11
81
5 32
D3 No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
K Selangor, 47620 USJ Subang Jaya
35
68
Landscape Architect
Viewing Deck
- -
CR -
Closed Exhibition
FP PP
NV
55 m²
4000
FFL: 0.25
Urbanscape Consultant Sdn Bhd
TB TS
AC 4000
109 m²
FFL: 0.25
EL
16
IRS
TA
NS Interior Designer
ITIO
DN HIB
EX
10
DN
28
15
DBKL/BP/04-01
Drawing Title
1
DBKL/BP/04-02
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/07-02
B1
CADANGAN MEMBINA 1 BLOK PUSAT MUSIK KOMUNITI 4
B2B3 TINGKAT ATAS LOT 407, JALAN IPOH, CHOW KIT, SELANGOR
DARUL EHSAN
B4
C1C2 C3 UNTUK TETUAN:
B5B6 C4
SIME DARBY PROPERTY
36
01
B7B8 D/P
F/A
15
00
24
B9 B/G
B10
50
H/R
45
00
K
SD
15
00
23
EL
67
16
34
24
A9
84
35
15
F2 B42
A8
00
45
2000
2600
2110
F1
3500
00
60 Land Owner & Developer Signature
A6
55
Hotline: 1-800-88-1118
Outside Malaysia : +603-7849 5000
A5 E3
55
40
E2 Michael Reeves
Chief Operating Officer
65
A4 E1
51
"Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
pembinaan yang dijalankan"
D/P
F /A Architects
60
1.4
6M
49.95°
H/R
D1 MOA Architects
80
Lobby
R= 174, T=280 (22 STEPS) FP PP K
Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
A3 CR
NV 4000
45 m²
EL
-
-
D2 Indah,
58100 Kuala Lumpur, Malaysia.
1.46M
Dormitory
A2
FB PP
39
TB TS
00
AC 4000
20 m²
FFL: 0.25
F/A
25
DETAILS 42.88° 5M
Architect Signature
5.8
EL
DN 102.14°
SD
1.4
6M
D3
00
A1
50
66
3.1
48
4m
Accomodation EL
°
03
FB PP
23.
TB TS
FFL: 0.25
SD
Balcony
ARKITEK
TO DETAILS FP
CR
PP
-
NV 4000
15.0 26 m²
m FFL: 0.25
15.0m
32.43°
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
DN F /A
No 48, Ground Floor Jalan Sepadu, Off, Jalan Klang
D/P
Lama, Taman United, 58200 Kuala Lumpur
K
C&S Engineer
EL 15.0m
Music Library
FP PP
TB
MV
TS
4000
178 m²
SMC (M) Sdn Bhd
FFL: 0.25
SD
EL
SD Lot 36 & 37, Jalan Delima 1/1, Subang Hi-tech
EL
RC COLUMN TO ENGR'S DETAILS Industrial Park, 47500 Subang Jaya, Selangor
200MM THK. PRECAST FIBER-
REINFORCED CONCRETE TO Quantity Surveyor
SPECIALIST DETAIL
SC QS Consult Sdn Bhd
Landscape Architect
Interior Designer
2
No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
Selangor, 47620 USJ Subang Jaya
DBKL/BP/04-01
Drawing Title
1
DBKL/BP/04-02
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/07-03
15
00
B5B6 C4 B/G
H/R SIME DARBY PROPERTY
24
50
B7B8 6710
K
45 23
B9
00 551
SD
2000
15 2600
00 2110 EL
23
67
16
B10
34
59
99
A9
F2 B42
A8
00
45
3500
F1
5° SLOPE
Land Owner & Developer Signature
A7
00
60
Sime Darby Property Berhad Ara Damansara
Block G, 10th Floor
No.2, Jalan PJU 1A/7A, Ara Damansara, PJU 1A
47301 Petaling Jaya, Selangor
A6 Hotline: 1-800-88-1118
00
55
A5 E3
55
E2
40
Michael Reeves
000
40
A4 E1 "Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
65
89 19
5° SLOPE
D/P Architects
20 F /A
70
DN FD1
K
F/A
H/R
D1 MOA Architects
80
ST
AIR
SD
Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
72
A3 CA
SE
2
Lift Room EL
FP PP
D2 Indah,
39
CR -
NV 4000
00
15 m²
FFL: 0.25
10
54
8
Architect Signature
00
25
66
48
A1 D3 Ar. Tan Ewe Liat
00
50
5°
SL
OP
ARKITEK
E
ER
TT
GU
OF
RO
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
M&E Engineer
C&S Engineer
5°
100MMØ RAINWATER DOWNPIPE No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
Selangor, 47620 USJ Subang Jaya
Landscape Architect
Interior Designer
2
No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
Selangor, 47620 USJ Subang Jaya
DBKL/BP/04-01
Drawing Title
1
DBKL/BP/04-02
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/08-04
15
00
B5B6 C4 SIME DARBY PROPERTY
24
50
B7B8 6710
D/P
F/A
45 23
B9
00 551
B/G
2000
15 2600 H/R
00 2110
23
67
16
B10 K
34
SD
EL
59
99
A9
F2 B42
A8
00
45
3500
A7 00
60
A5 E3 M&E Room
1:8 RAMP
55
Michael Reeves
E2
- -
40
CR -
000
NV
6 m²
4000
UP Chief Operating Officer
40
FFL:0.25
1:8 RAMP
Water Tank Room
- - "Saya mengakui bertanggung jawab terhadap sebarang kerosakan bangunan bersebelahan akibat kerja-kerja
A4 E1 CR -
NV 4000
80 60
5 m²
51
89 19 FFL:0.25
DN
Architects
D/P
20 F /A
70
D1
K
D/P
H/R
EL
EL MOA Architects
UP SD
1
Abadi shopoffice 14-1, Jalan 3/109c, Taman Abadi
80
K
72
A3 D2
Indah,
39
21
58100 Kuala Lumpur, Malaysia.
00
A2
10
54
22
Architect Signature
8
00
2
25
20
66
23
48
A1 19
D3 Ar. Tan Ewe Liat
00
50
ARKITEK
18
24
"Saya mengakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-
17
25 undang Kecil Bangunan 1984 dan saya setujui terima tanggungjawab penuh dengan sewajarnya"
EL 3
SD
M&E Engineer
26
C&S Engineer
28
29
Industrial Park, 47500 Subang Jaya, Selangor
K
14
Quantity Surveyor
UP
6
EL
SD
EL
12
F /A SD
No. 21-2, Jalan Usj 1/1B, Regalia Business Centre,
7
D/P
K H/R Selangor, 47620 USJ Subang Jaya
30
11
Landscape Architect
10
Interior Designer
2 Drawing Title
DBKL/BP/04-01
BASEMENT BOMBA PLAN
1
DBKL/BP/04-02
Building Plans
Scale 1:250 Date DEC 2020
No. Lukisan
Project
Number 0101 Drawing
Status BP Revision
Drawing 1
Number DBKL/BP/08-05