Structural Detail Manual: Piers
Structural Detail Manual: Piers
Chapter 02 - Substructure
SECTION 04
PIERS
(SUB-PR)
* GUIDE SHEET FOR PLAN DEVELOPMENT ONLY - DO NOT INCLUDE THIS SHEET IN CONTRACT PLANS *
1''
'
• '
Cap Length
n.
*
mi
9''
2'
S S
A B B B B
ELEVATION
Scale: ‘'' = 1'-0''
Note:
1.Detail is for roadway widths and skew * FOR OFFICE USE ONLY *
SUBSTRUCTURE - PI
1 OF 4
ER
1''
'
• '
5'' at
lowest pad
Cap Length
'
-6'
n.
mi
9''
2'
B B A B B
ELEVATION
Scale: ‘'' = 1'-0''
Note:
1.Detail is for roadway widths and skew * FOR OFFICE USE ONLY *
SUBSTRUCTURE - PI
2 OF 4
ER
1''
'
• '
2 @ 3'' = 6''
-6'
*
9''
S S 0.8 S *
* S S
A B B B B B B
A
1'' x •'' scoring all around
cap to facilitate possible
future widening.
ELEVATION
Scale: ‘'' = 1'-0''
*
*If possible
Note:
1.Criteria for individual pier units shall be as
shown on sheets 1 and 2 of 4. * FOR OFFICE USE ONLY *
SUBSTRUCTURE - PI
3 OF 4
ER
c c
of column and of column and
c c
of footing. of footing.
7'-0'' min. 3'-6''
2'-0'' 1'-6''
min.
*If rock is present
these notes must
Three #6 @ 4'' c/c each way appear on Plans.
n.
n.
'm i
'm i
Rock
'
3'
(Rebar mat pattern Line
-6'
-0'
2'
'
3'
3''cl.
-0'
shown on Plan View
1'
showing pile pattern.)
2'-6'' min.
Dowels
10'' x 10'' x Minimum Depressed Key,
centered in column at top Main column bars shown solid.
and bottom of column.
2'' clear to spiral.
Spirals
APPROVAL
Note: STATE OF MARYLAND
1.Reinforcing steel for column spirals shall be DIRECTOR DEPARTMENT OF TRANSPORTATION
OFFICE OF STRUCTURES
cold drawn steel conforming to ASTM A 82. STATE HIGHWAY ADMINISTRATION
2.The design bearing pressure for spread DATE: <DATE> OFFICE OF STRUCTURES
4 OF 4
ER
c Pier
Flow
90
One vertical
rebar at
this bend.
'
2'
PLAN
Scale : ‚'' =1'-0''
Corner rebar to be
continuous around corner.
Top of Footing
ELEVATION
Scale : ‚'' =1'-0''
Note:
1.Angle to be steel conforming to ASTM A-36.
SUBSTRUCTURE - PI
APPROVAL
2.Angle to be hot dipped galvanized, after STATE OF MARYLAND
DIRECTOR DEPARTMENT OF TRANSPORTATION
fabrication, in accordance with ASTM A-123. OFFICE OF STRUCTURES
STATE HIGHWAY ADMINISTRATION
DATE: 01/22/2001 OFFICE OF STRUCTURES
VERSION
1.0
1 OF 1
ER
2'
‚'' Thick Fiberglass Jacket
'
(no shop or field seams).
Cast-in-Place
Concrete Column
6 gage 4 gage
Mean Waterline
(Average of
L/2
mean high
water and
mean low
water). **
ve
Protecti
t of
L/2
mi
Li
* Unless otherwise
specified L=8'.
APPROVAL
Notes: STATE OF MARYLAND
DIRECTOR DEPARTMENT OF TRANSPORTATION
1. For fiberglass requirements see 921.11. OFFICE OF STRUCTURES
STATE HIGHWAY ADMINISTRATION
2. For other fiberglass jacket requirments DATE: 01/22/2001 OFFICE OF STRUCTURES
see Special Provisions.
VERSION
3. Inside of jacket shall be thoroughly cleaned. FIBERGLASS JACKET FOR
CAST-IN-PLACE CONCRETE COLUMN
1.0
1 OF 1
ER
'
3'
Jacket * = L
‚'' Thick Fiberglass Meanwater
Fiberglass Tape
Jacket (No shop or Line (Average
2'' Wide, shop
L/2
applied. field seams). of mean high
berglass Spacers
water and
ve
mean low
Protecti
water). **
Concrete Pile
- one
A
t of
2'-0'' max. at
Fi
face of jacket
mi
m um
Li
ni
L/2
row s m i
Spacers to be
placed at equal
Fill space with
intervals. Maximum
Tw o
pourable epoxy grout.
spacing 2'-0''
'
3'
(Typical)
*Unless otherwise
PLAN specified L=8'.
Scale: •'' = 1'-0''
** Unless otherwise
specified, locate
at this elevation. ELEVATION
Scale: …'' = 1'-0''
B
Top of Jacket
'
3'
see Detail C below
n
ƒ''
'm i
Finish with
'
fillet for
'
1'
2'
2'
drainage
'
1'
SECTION B-B
B Scale: None
'
'
‹
Scale: None
'
3''
ˆ
DETAIL C
Scale: None
Notes:
1. No vertical joints allowed.
SUBSTRUCTURE - PI
1 OF 1
ER
Bent cap
Substructure
Concrete
'
1'
'
6'
Voids to be filled
with grout
B B
berglass jacket
'
Typ.
-0'
ƒ'' x 6'' long studs
1'
each side of web as
T
shown
berglass jacket
mi
Plans for li ts
n fi
Approximate
F
water surface
thi
D
grout w i
fi
A
See
of
Approximate
ts of
stream bed
R
mi
Li
D
'
6'
Steel H pile
ƒ'' x 6'' long
studs @ 1'-0'' c/c
each side of web ELEVATION
as shown Scale: •''= 1'-0''
'
5' One piece Notes:
‚'' fiberglass jacket 1. Fiberglass shall conform to 921.13.
2'' min.
(no shop or field seams) 2.For fiberglass and grout material
requirements see Special Provisions.
Steel H pile 3.Clean pile area to be jacketed
just prior to placing jacket.
Voids to be 4.Cost of studs to be included in
filled with ‚'' x 2'' wide pertinent protective jacket item.
grout fiberglass spacer bound to
inside face of jacket with
2''
fiberglass tape in shop (Typ.)
Continuous 1•'' slab * PRELIMINARY DRAFT *
SUBSTRUCTURE - PI
1 OF 1
ER
B
Cast-in-place
concrete footing.
PLAN
Scale: None
'
Equal Spacing
spacing Limits of fiberglass
Joint to be sealed with
(max spacing tape through each
epoxy and epoxy grout.
2'-0'' typ.) trough (Typical).
2•''2•''
ng
anchor (typical). A
'
‚ '
‚'' protective
jacket.
'
Cast-in-place
'
‚ '
'
‚ '
'
7'
… '
concrete footing.
Top of Footing
4''
‚'' Protective Jacket
'
4'
'
ng
3'
Footi
‚'' x 2'' Protective
Jacket Anchor.
2'' 2'' 8'' Fiberglass tape width of
each trough extend 3'' onto
jacket face each side of trough.
‚'' Protective Jacket
SECTION A-A
DETAIL A Scale: 1 •'' = 1'-0''
Scale: None
SUBSTRUCTURE - PI
APPROVAL
STATE OF MARYLAND
Notes: DIRECTOR DEPARTMENT OF TRANSPORTATION
1. For Fiberglass requirements see 921.11. OFFICE OF STRUCTURES
STATE HIGHWAY ADMINISTRATION
2. For other fiberglass and epoxy grout DATE: 01/22/2001 OFFICE OF STRUCTURES
material requirements see Special Provisions.
VERSION
3. Inside of jacket shall be thoroughly cleaned. FIBERGLASS JACKET FOR
CAST-IN-PLACE CONCRETE FOOTING
1.0
1 OF 1
ER