0% found this document useful (0 votes)
147 views2 pages

PM 100F (100 HOUR Interval) : Checklist

This maintenance checklist is for a Caterpillar D6T bulldozer with serial number prefix GCT and equipment number PM 100F. The checklist details a 100-hour maintenance interval including performing initial 100 service hour maintenance and adjusting the C-frame. No parts are listed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
147 views2 pages

PM 100F (100 HOUR Interval) : Checklist

This maintenance checklist is for a Caterpillar D6T bulldozer with serial number prefix GCT and equipment number PM 100F. The checklist details a 100-hour maintenance interval including performing initial 100 service hour maintenance and adjusting the C-frame. No parts are listed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Model: D6T Customer Name:

Serial Number (Prefix/Range): GCT Equipment Number:


PM 100F (100 HOUR
Maintenance Interval: INTERVAL) Work Order Number:
Last Updated Data Date: 9/5/2019 Equipment SMU:

Parts Manual Media Number: SEBP4963 Equipment Location:

OMM Media Number: Print Date: 12/12/2020

Employee:
NOTE: THIS PLANNED MAINTENANCE CHECKLIST IS MEANT TO BE A QUICK REFERENCE ONLY. IT DOES
NOT REPLACE THE OPERATION AND MAINTENANCE MANUAL ("OMM") APPLICABLE TO YOUR CATERPILLAR
PRODUCT. THE DATA ON THIS CHECKLIST MAY BE CHANGED OR UPDATED WITHOUT NOTICE.

Checklist

Seq Instruction OK Comments

1 PERFORM 100 SERVICE HOUR MAINT INITIAL

2 ADJUST C-FRAME

12/12/2020 Page 1 of 2
Part Information

Qty Part Number Description Notes Seq

12/12/2020 Page 2 of 2

You might also like