This document provides a job safety analysis for a standard penetration test project. It lists the work location, supervisor, HSE officer, task, tools/equipment involved, work personnel, and a step-by-step analysis of the job tasks including potential hazards, risks, and control measures. The tasks include machine turn on, boring/drilling, SPT testing, and finishing testing. Hazards include being struck by equipment or pinched, and risks include hematoma or physical injury. Control measures specify using proper PPE and following SOPs for all tasks.

Uploaded by

sipil teknik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
333 views2 pages

Safety Guide for Construction Teams

This document provides a job safety analysis for a standard penetration test project. It lists the work location, supervisor, HSE officer, task, tools/equipment involved, work personnel, and a step-by-step analysis of the job tasks including potential hazards, risks, and control measures. The tasks include machine turn on, boring/drilling, SPT testing, and finishing testing. Hazards include being struck by equipment or pinched, and risks include hematoma or physical injury. Control measures specify using proper PPE and following SOPs for all tasks.

Uploaded by

sipil teknik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JOB SAFETY ANALYSIS (JSA)

ANALIS KERJA AMAN

Date/Time Project Company


During Project Standard Penetration Test Dewata Makmur Bersama
Tanggal / Waktu Proyek Proyek

Work Location Supervisor HSE Officer


Sei Baloi Substation Angra P Ronny G
Lokasi Kerja Pengawas Petugas HSE
Task / Pekerjaan:
Cone Penetration Test

Put a cross sign (X) in the following column □/ Berilah tanda silang (X) pada kolom □ berikut ini:

Area of work involved /Daerah kerja yang terlibat: Tools and equipment involved/ Alat kerja yang terlibat :

☐At closing room/ Di ruang tertutup atau ☐ At close water/ Di dekat air 1. CPT Machine 6.
sempit
☐ On the vessel/ Di atas kapal 2. Wrench 7.
☒ At open yard/ Di ruang terbuka

☐ At Workshop/ Di ruang kerja


☐ At height / Di ketinggian 3. Pump 8.

☐ Other/Lain-lain: ……………………… ☐ …………………………………. 4. Tripod 9.

5. Accessories 10.

Work Personnel Members/ Anggota Kelompok Kerja


Name Designation Name Designation
No No
Nama Jabatan Nama Jabatan
Nazri Helper
1 Mulyono Engineer 5
2 Bakir Technician 6

3 Kasino Technician 7
4 Nazri Helper 8
JOB SAFETY ANALYSIS (JSA)
ANALIS KERJA AMAN

Completion Date
No/ Job Steps Potential Risk Control Measures
Tanggal
No Tahapan Pekerjaan Hazards Resiko Tindakan Pengendalian
Pemenuhan
Potensi Bahaya
1 Tool Box Meeting -n/a- -n/a- Use PPE

Daily Check list Stuck down by equipment Physical Hazar Use PPE
2
3 Machine Turn on Stuck down by equipment Hematoma Physical hazard Performing activity follow sop
Pinched by equipment Use PPE
4 Perform Boring/ Drilling Stuck down by equipment Hematoma Physical hazard Performing activity follow sop
Pinched by equipment Use PPE
5 SPT Test Stuck down by equipment Hematoma Physical hazard Performing activity follow sop
Pinched by equipment Use PPE
6 Finish Testing Stuck down by equipment Hematoma Physical hazard Performing activity follow sop
Pinched by equipment Use PPE