Inspection and Test Plan (Reinforced Concrete Slab Construction)

The document provides an inspection and test plan for reinforced concrete slab construction of Phase IV of the Jabal Omar Development project. It outlines 6 required approvals prior to work commencement including shop drawings, material submittals, formwork design, method statements, surveys, and permits. It then details a 7-point inspection plan to be followed during construction, checking items like reinforcement installation, embedded components, formwork, concrete sampling and strength testing, and formwork removal. Records will be generated and various parties will hold, witness, review and approve points during the process.

Uploaded by

ray
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views2 pages

Inspection and Test Plan (Reinforced Concrete Slab Construction)

The document provides an inspection and test plan for reinforced concrete slab construction of Phase IV of the Jabal Omar Development project. It outlines 6 required approvals prior to work commencement including shop drawings, material submittals, formwork design, method statements, surveys, and permits. It then details a 7-point inspection plan to be followed during construction, checking items like reinforcement installation, embedded components, formwork, concrete sampling and strength testing, and formwork removal. Records will be generated and various parties will hold, witness, review and approve points during the process.

Uploaded by

ray
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JABAL OMAR DEVELOPMENT

INSPECTION AND TEST PLAN


PROJECT- PHASE IV
ZONE S09, S10 AND S11 (REINFORCED CONCRETE SLAB CONSTRUCTION)

Fixing of reinforcement, supply and installation of formwork, MEP embeds and pouring for CONCRETE
WORK SCOPE
SLAB
MAIN CONSULTANT EHAF
MAIN CONTRACTOR RUWAD CIVIL CONSTRUCTION

PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS


Item Frequency of Hold, or Witness Point
Description of Operation/Inspection, Test and Approval Records Generated
No. Inspection & Test Plan Subcont. RCC EHAF
Approved Shop
1 Shop Drawings- Civil & Structural, MEP Once Sub* R R&A
Drawings
Materials Submittals- Concrete Mix, Reinforcement, Mill Certificate, Mix
2 Embedded Pipes, Curing Compound, Concrete Repair Once Design, Data Sheets, Sub R R&A
Materials, PVC Spacers, Couplers Batch Certificates
Propriety Design &
3 Formworks System – Design and Calculation Once Sub R R&A
Drawings
4 Method Statement, Inspection & Test Plan, Check List Once MS, ITP, CL Sub R R&A
Approved Drawings,
5 Survey reference and Bench Marks (drawings) Once Sub** R R&A
Control Point
Permits, Licenses, NOC’s and Authority Approvals (if
6 Once Approval of work Sub** R R&A
required)
Note*- All deviation from the approved drawings/documents to be recorded and discussed with the Main Consultant prior to
proceeding. * Other subcontractor/sub consultant engaged by RCC. ** By RCC

Page 1 of 2
JABAL OMAR DEVELOPMENT
INSPECTION AND TEST PLAN
PROJECT- PHASE IV
ZONE S09, S10 AND S11 (REINFORCED CONCRETE SLAB CONSTRUCTION)

PART 2- INSPECTION AND TEST DURING CONSTRUCTION OF WORKS- CONCRETE SLAB

Item Frequency of Hold, or Witness Point


Description of Operation/Inspection, Test and Approval Records Generated
No. Inspection & Test Plan Subcont. RCC EHAF
Prior to start the
1 Setting out- Alignment, Orientation, openings, level IR, Survey Report H H RC
Rebar & Formwork
Formwork Fixation- Form Release Agent Application,
2 By Area/Layout IR/CL H H S
Edge Setting out, Openings, Dimension, Supports
Steel Reinforcement Installation- Overlap, coupler, bar
3 By Area/Layout IR/CL H H S
sizes, bar marks, bars position/arrangement
4 Embedded MEP items installation By Area/Layout IR/CL H H S
Consultant Inspection and Approval for
5 By Area/Layout IR H H I&A
Reinforcement, MEP and Formworks prior to casting
Concrete Order and Casting- Sampling: Slump/Flow, Delivery notes, Pour
6 By Area/Layout H H RC
Temperature, Compressive Strength Record
Shutter/Formwork Removal- Release and removal of
7 shutter and props are as per required in the By Area/Layout Deshuttering record H H S
specification.
Abbreviations: Sub- SUBMIT, H- HOLD, R&A- REVIEW & APPROVE, RC- RANDOM CHECK, I&A- INSPECT & APPROVE, S- SURVEILANCE,
CL= CHECKLIST, IR- INSPECTION REQUEST