REPORT OF
INSPECTION AND EVALUATION
Site : Grand miracle hotel, Siem Reap
Date : 09‐01‐2021
Inspected by: Sorn Sothea (Civil Engineer)
I. Inspection work and Evaluation
The consultant inspected the site with a set of structural
drawing and renovated recommendation drawing. The consultant team
have seen some construction error and un‐professional work as shown
below with photo attached.
1. Figure 1,2: Grout‐mixing problem.
2. Figure 3: Missing plate
3. Figure 4,5,6: Fail welding
4. Figure 6,7: Fail welding
Figure 1 : grout‐mixing problem
Figure 2 : grout mixing problem
Figure 3 : missing plate Figure 4: fail welding
Figure 5: fail welding Figure 6: fail welding
Figure 7: fail welding Figure 8: fail welding
II. Recommendation
As the inspection report have shown there are many construction
errors, the consultant rejects to the work as shown in the picture
above. The consultant still have strongly recommend improving the
skill‐workmanship to follow standard and follow the structural and
recommendation drawing.