0% found this document useful (0 votes)
45 views4 pages

Report of Inspection

The consultant inspected the Grand Miracle Hotel in Siem Reap and found several construction errors, including grout mixing problems, a missing plate, and failed welds, as shown in the attached photos. The consultant rejects the work shown in the photos due to the construction errors. The consultant recommends improving skill and workmanship to follow standards and drawings.

Uploaded by

Sothea Born
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views4 pages

Report of Inspection

The consultant inspected the Grand Miracle Hotel in Siem Reap and found several construction errors, including grout mixing problems, a missing plate, and failed welds, as shown in the attached photos. The consultant rejects the work shown in the photos due to the construction errors. The consultant recommends improving skill and workmanship to follow standards and drawings.

Uploaded by

Sothea Born
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

REPORT OF

INSPECTION AND EVALUATION

Site  :  Grand miracle hotel, Siem Reap 
Date  : 09‐01‐2021 
Inspected by: Sorn Sothea (Civil Engineer) 

I. Inspection work and Evaluation 
The consultant inspected the site with a set of structural 
drawing and renovated recommendation drawing. The consultant team 
have seen some construction error and un‐professional work as shown 
below with photo attached. 
1. Figure 1,2: Grout‐mixing problem.  
2. Figure 3: Missing plate 
3. Figure 4,5,6: Fail welding 
4. Figure 6,7: Fail welding 

 
 
Figure 1 : grout‐mixing problem
 

 
Figure 2 : grout mixing problem 
 

   

Figure 3 : missing plate  Figure 4: fail welding 
 

 
Figure 5: fail welding  Figure 6: fail welding 
 

   

 
Figure 7: fail welding  Figure 8: fail welding 
II. Recommendation 
As the inspection report have shown there are many construction 
errors, the consultant rejects to the work as shown in the picture 
above. The consultant still have strongly recommend improving the 
skill‐workmanship to follow standard and follow the structural and 
recommendation drawing. 
 