JOB NO 25511378 Date: 21/07/2018
Project Location : Fabrication yard JSA No.: 03
P&M and Equipment, Hydraulic crane F-15, Sling; Wire Rope Sling,D-shackle Rev. No.: 01
Tools & tackles involved ,lifting belt, air compressor, blasting hopper,Painting pot,
Handtools.
Job Description: Blasting & painting work. Prepared By: Mr. Suresh V.B.
(Contractor Site
Sequence of Operation – Activity Tools &tackles Hazards Safety measures / precautions
Eng. Sup)
Sl. Risk Risk level
Steps used & involved at Responsibility
No. level after
Job Classification: Mechanical manpower various Reviewed By: Mr. Saket Kumar Action by
H/M/L control
deployed steps
(Contractor
1.1.1 Maintain proper housekeeping
HSEM)
at work location.
Name of the Site 1.1.2 Don’t keep unwanted
Approved By: materialMr. Vijay Kumar Singh
1. Mr. Suresh V.B. L at site. L Site engineer
Engineer: 1.Slip& Trip
Area clearance Hand tools (Contractor
1.1.3 Inspection of work site to be
hazard
RCM/Site
done before start the job.
Manager)
2. 1. Crane H 2.1.1Ensure that the ground is L Site engineer
PPE / safety device trippinggoggle, hand gloves, Status.
stable; fully extended outriggers; Issued for
Safety helmet, Safety shoe, Safety
required due to use outrigger pads; use steel implementation/ review
Blasting hood, Blasting goggle, Nose mask, Ear plug,
unstable
Leather hand glove, Boiler suit, etc. plates as pads if ground is
ground suspected or not stable.
conditions 2.1.2 Ensure the capacity of
and over lifting tools & lifting equipment.
loading. 2.2.1Ensure, proper lifting tools
2. Falling and tackles used.
of load due 2.2.2 Ensure only inspected &
to improper certified lifting tools & tackles to
lifting be used.
tools. 2.3.1Ensure the material secured
Lifting & shifting of material with Hand tools, properly before lifting the
Page 1 of 5
hydraulic crane (F-15). Lifting tools & 3 Falling of material.
tackles. loose 2.4.1Lifting plan should be
materials provided for all critical lifts &
while above 10TON.
lifting. 2.4.2 Only qualified Rigger must
4. Critical be deployed.
lift. 2.4.3All lifting gears must be
5. Injury inspected and certified. Prior to
due to use any lifting gear, a pre
pinching or inspection to be conducted.
crushing. 2.5.1Communicate the pinching
hazards through daily JSTI.
3. 1. Physical H 3.1.1Provided a sufficient blasting L Site engineer
injury due to shed.
flying 3.1.2Proper use of PPE's and
blasting grit Deployed Skilled blaster (must use
in air. blasting hood by blaster during any
2. Eyes grit blasting work.)
injury & 3.1.3 Pre job discussion /TBT
Air Breathable should be done before start the
Blasting activity compressor, problems activity.
Hand tools. due to flying 3.1.4 Detail health chechup to be
blasting grit done for grit blaster.
and dust in 3.1.5 Required job/work permit
air. shall be obtained frol concern
3. Explosive authority.
of 3.2.1 Use safety goggles, nose
compressor mask, ear plug and provided require
hose. PPE`s for all people involve in
4. Electric blasting work.
shock. 3.3.1 Ensure hose connected by
5. Entry of whip check.
unauthorize 3.3.2 Only third party certified air
d person. compressor will be taken into use.
6. Poor 3.3.3 Operability of safety relief
illumination. valve of compressor has to be
checked & callibration certificate of
Page 2 of 5
PRV should be ensured.
3.3.4 Trained & experienced
operator should be engaged &
compressor to be checked daily
basis prior to start the work.
3.3.5 Working pressure at
compressor discharge not to exceed
5 bars.
3.4.1 Only authorised electrician
perform their job.
3.4.2 Electrical DB fitted with
ELCB with proper rating.
3.4.3 Rain protection shed to be
provide for electrical DB.
3.5.1 Area should be cordoned off
with proper signage.
3.6.1 If job performed at night
arrangement of adequate
illumination to be provided.
Air receiver/ 1. Explosive 4.1.1 Proper use of air receiver
Air receiver/ Hopper(running) Hopper, hopper due hopper and use with valid TPI.
Hand tools. to receive Check Pressure gauge meter and
over lode skilled operator deployed.
air& 4.2.1. Use extra safety valve in
blasting grit. hopper & strict supervision.
4. 2. Serious H 4.2.2 Staging has to be made to L Site engineer
injury, access to open the top cover.
fracture, 4.2.3 Ensure there is no residual air
fatal due to pressure in the hopper while loading
explosive of grit.
hopper.
5. 1. Eye H 5.1.1Proper PPE`s to be use (safety L Site engineer
injury\skinni show, safety helmet, safety goggles)
ng due to and provided any require PPE`S for
Painting activity Hand tools spray of spray painting work. Skilled painter
paint flying deployed.
in air. 5.1.2 Precaution will be taken
according to MSDS.
5.1.3 Involved workmen should be
Page 3 of 5
protect all body parts properly.
5.1.4 DCP or foam type fire
extinguisher should be kept at work
time.
5.1.5 Proper lighting & ventilation
to be ensured.
5.1.6 Used cotton cloth should be
kept & disposed properly at safe
place.
1. 6.1.1Ensure plenty of cold
Unavailabil drinking water is available at site
Heat Stress Management ity of 6.2.1 Ensure adequate rest shelter
drinking is available for workmen to take
6. water rest. L Site engineer
2. Lack of
or
inadequate
rest shed
1. 7.1.1 Housekeeping shall be
Tripping maintained after completion of work
/slipping for the day.
Housekeeping & close Hand tools hazard due 7.1.2 Ensure proper illumination on
7. of work for the day to poor M walkway. L Site engineer
illumination
& poor
housekeepin
g
1. Extreme 8.1.1Effective TBT shall include
weather about weather condition.
condition 8.2.1Emergency Response at
2. Leakage workplace.
8. H L Site engineer
Emergency Response of toxic or 8.2.2 Ensure emergency vehicle
flammable arrangement at workplace.
gases. 8.2.3 Ensure availability of First aid
box at workplace.
Page 4 of 5
General precaution for Demolition:
1) Instruction should be given for “NO SMOKING” and ensure that no fire/ hot work occurs nearby.
2) Tools & nails are to be kept in a toolbox never carry the nails in bags or in pockets.
3) Materials shall be kept in arrange way on the ground. The foreman shall ensure good housekeeping.
4) Tie the lifeline while making beam bottom at the outer side.
5) Support the lifeline at every 5 m length.
6) Helpers should not be allowed to work at outer side.
7) Ensure access wherever you work.
8) Check for defective tools.
9) The included angle for the ladder is 75 degree and the ladder should extend at least 1 m beyond the landing platform.
10) The ladder must be secured at the top and bottom. Do not use top rung or top step of the ladder.
11) Never use brittle materials like brick as a packing material for shutter supporting towers.
12) Do barricading/Identified/highlight while doing breaking work at outer side.
13) While demolition keep one helper to remove the nails and stack the shutters properly (neatly) and ensure proper access.
14) 1/3 of portion of the tower only can be projected beyond periphery of the slab as cantilever.
15) In such cases the Wallers to be secured by hooks embedded in concrete.
16) Props used at periphery must be braced adequately.