Loading Computer System: Seacos MACS3 Version NET 1.1 Stowman
Loading Computer System: Seacos MACS3 Version NET 1.1 Stowman
Manual
______________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
STOWMAN seacos MACS3 Version .NET 1.1
Content
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 3 of 43
STOWMAN seacos MACS3 Version .NET 1.1
Using the STOWMAN interface, the analysis of the cargo handling sequence is very fast.
The close integration with the Belco module and with the core of the seacos MACS3 system
provides rapid cargo compatibility checks and ship stability calculations.
Using STOWMAN as an integral part of the stowage planning process helps to ensure that
the stowage and crane operations sequence will be efficient. This can reduce the amount of
time spent in stowage planning significantly.
Note: You should be familiar with the seacos MACS3, Belco and Planning User Manuals
prior to reading this manual!
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 4 of 43
STOWMAN seacos MACS3 Version .NET 1.1
and dangerous goods, proper cargo securing) according to the requirement of classification
societies.
Data, describing the mathematical model of ship structure are stored in *.dat and *.shp files.
Cargo units and tanks are stored in loading condition files (*.mxml) and can be entered
manually during planning or imported from UN/EDIFACT BAPLIE-files (*.edi) and PaCKage
files (*.pck), prepared by the previous Belco version. Securing materials and their
distribution are stored in loading condition files (*.mxml). Securing materials can be
assigned manually during planning strictly according to the Cargo Securing Manual or with
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 5 of 43
STOWMAN seacos MACS3 Version .NET 1.1
optimisation. This information can be also imported from PaCKage files (*.pck), prepared by
the previous Belco version.
All conditions together (for single ship) can be stored in one *.mvoy file.
Arrival
Loading Conditions seacos MACS3
Condition Cargo &
Manager Core
CraneSplit
Condition
Views
Check
PrePlan
Condition
Departure Report
Condition module
Simulation
Condition
Result
dialogs
Real-Time
Condition
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 6 of 43
STOWMAN seacos MACS3 Version .NET 1.1
Using the STOWMAN interface, the analysis of the cargo handling sequence is very fast.
The close integration with the Belco module and with the core of the seacos MACS3 system
provides rapid cargo compatibility checks and ship stability calculations. Using STOWMAN
as an integral part of the stowage planning process helps to ensure that the stowage and
crane operations sequence will be efficient. This can reduce the amount of time spent in
stowage planning significantly.
Note: You should be familiar with the Belco and Planning User Manuals prior to reading
this manual!
The STOWMAN for Shipping Lines uses several loading conditions – one departure
condition per port call. It can be either pre-planned (for future port calls) or real (from
previous port calls) condition. The arrival condition (before discharge) for some port call is
assumed departure condition from previous port call. Each loading condition contains
information about cargo on board and on pier and use the crane configuration for quay,
specified in port call.
Data, describing the mathematical model of ship structure are stored in *.dat and *.shp files.
Cargo units and tanks are stored in loading condition files (*.mxml) and can be entered
manually during planning or imported from UN/EDIFACT BAPLIE-files (*.edi) and PaCKage
files (*.pck), prepared by the previous Belco version. Securing materials and their
distribution are stored in loading condition files (*.mxml). Securing materials can be
assigned manually during planning strictly according to the Cargo Securing Manual or with
optimisation. This information can be also imported from PaCKage files (*.pck), prepared by
the previous Belco version. The containers to load at port call can be imported from text
files to the pier window. All conditions together (for single ship) can be stored in one *.mvoy
file.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 8 of 43
STOWMAN seacos MACS3 Version .NET 1.1
DaGo
Database
Departure
Loading Conditions seacos MACS3
Condition for Cargo &
Manager Core
Port Call <A> CraneSplit
Condition
Views
Check
Report
…… module
Result
Departure
dialogs
Condition for
Port Call <Z>
Ship structure
&
Cargo Securing
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 9 of 43
STOWMAN seacos MACS3 Version .NET 1.1
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 10 of 43
STOWMAN seacos MACS3 Version .NET 1.1
In the picture above 5 tab pages for 5 corresponding loading conditions are shown. These
conditions are:
1) Arrival condition is either a real departure condition, received from previous terminal, or
some estimated condition, which should be corrected later according to the real situation
on board. It can be loaded also prior to arrival at current port.
2) Preplan is an estimated departure condition for this port, prepared by central planner.
3) Real-time condition represents the actual state of the loading/discharge/restow process,
received from terminal information system, for the purpose of monitoring.
4) Departure condition is the resulting condition for the planning process. It is normally an
arrival condition where:
containers with current port as destination port are discharged from board
(automatically by STOWMAN)
all containers that prevent discharge of containers from a) are placed on pier for
future re-stow (automatically by STOWMAN)
all containers that should be loaded and re-stowed at this port are loaded at
proper positions in order to provide optimal stowage, and (optionally) compatibility
with IMDG regulations and Cargo Securing Manual.
5) Simulation condition is a virtual loading condition which allows you to visually replay the
whole stowage process from arrival condition to departure condition, or to see the
loading condition at any point during transition from arrival to departure.
You can switch between conditions by pressing on the corresponding tab page. The
contents of the panels (e.g., of Bay View or Stability Panel) will be adjusted automatically.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 11 of 43
STOWMAN seacos MACS3 Version .NET 1.1
All operation related to the single loading condition are described in the User Manuals for
seacos MACS3, Belco and Planning Modules.
In the picture above 10 tab pages for 10 loading conditions – each for departure from
corresponding port calls - are shown. Departure condition is the resulting condition for the
planning process. It is normally an arrival condition, i.e. the departure condition from
previous port where:
containers with current port as destination port are discharged from board
(automatically by STOWMAN)
all containers that prevent discharge of containers from a) are placed on pier for future
re-stow (automatically by STOWMAN)
all containers that should be loaded and re-stowed at this port are loaded at proper
positions in order to provide optimal stowage, and (optionally) compatibility with IMDG
regulations and Cargo Securing Manual.
You can switch between conditions by pressing on the corresponding tab page. The
contents of the panels (e.g., of Bay View or Stability Panel) will be adjusted
automatically.
All operation related to the single loading condition are described in the User Manuals
for seacos MACS3, Belco and Planning Modules.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 12 of 43
STOWMAN seacos MACS3 Version .NET 1.1
Cargo blocks moved by different cranes are represented by boxes of different colors (one
color for each crane) with number of loading and discharging cargo moves inside it. The up
arrow, directed to the ship, means loading operations, and the down arrow, directed from
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 13 of 43
STOWMAN seacos MACS3 Version .NET 1.1
ship, means discharge operations. ‗W‘ in left corner of the move block means overweight of
containers, ‗O‘ means overlapping (e.g. cranes, operating with neighbor bays, can overlap).
Click right under the vessel sideview and select Auto Crane Split.
The crane split will be done automatically.
How to distribute moves per cranes:
-Select the cranes and click on move blocks
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 14 of 43
STOWMAN seacos MACS3 Version .NET 1.1
if automatically generated sequence numbers (you can see them in ―Others‖ group box on
―Trade‖ tab page in the Cargo Editor window) should be used for loading, if they are
available.
On the figure below the screenshot of the schedule panel in parent view mode is shown.
In this mode you can see move blocks and change following their parameters:
Assigned crane
Start and end time for the sequence of move block operations
Delay after performing all operations (e.g. for relocating the crane to the bays for a
new sequence), in minutes
Red balloon with exclamation sign means warning: ‗OW‘ means overweight of containers,
‗OL‘ means overlapping (e.g. cranes, operating with neighbor bays, can overlap).
You can select the move blocks for all cranes or for a specific one by selecting crane in
combo box in the bottom left corner of the panel. You can combine move blocks (if possible)
by pressing the ―Combine blocks‖ button. You can print or export move blocks in Adobe
PDF format by pressing ―Print‖ and ―Pdf‖ buttons correspondingly.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 16 of 43
STOWMAN seacos MACS3 Version .NET 1.1
By double-click on selected move blocks, the schedule panel changes to the single moves
mode. Here single moves and involved containers for the selected move block are shown
(see the figure below):
You can change the order of moves by selecting the job and pressing ―Up‖ or ―Down‖
buttons. You can join two jobs (if possible) by selecting two neighbour row headers and
pressing ―Switch twin/tandem‖ button. You can split move blocks starting from selected one
by pressing ―Split block‖ button.
You can print or export moves in Adobe PDF format by pressing ―Print‖ and ―Pdf‖ buttons
correspondingly.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 17 of 43
STOWMAN seacos MACS3 Version .NET 1.1
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 18 of 43
STOWMAN seacos MACS3 Version .NET 1.1
files (*.svoy) containing information only about 3 sequential port calls, can be used in
StowMAN for Shipping Lines
Load Multiport Export list (in StowMAN for Shipping Lines only): the containers from
this file will be distributed among port calls automatically, depending on their POL.
Load Arrival and Preplan Conditions for Terminals (normally BAPLIE or MOVINS)
Load the Terminal export lists (containers, which should be loaded in this port). If the
container in the list never occurs in Cargo List, it will be added on pier (and, if the
position is available, also on board). If Cargo Unit with such Serial or Booking
number is already in the Cargo list, the existing information for this Cargo Unit will be
updated from the export list.
Save results of voyage planning as EDIFACT file (BAPLIE, MOVINS, COARRI,
COPRAR).
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 19 of 43
STOWMAN seacos MACS3 Version .NET 1.1
You can delete some weight groups by pressing the ―Delete‖ button.
You can add or edit the name and criteria for a single weight group by pressing the
corresponding ―Add‖ and ―Edit‖ buttons. In this case the following dialog box will be
displayed on the screen:
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 20 of 43
STOWMAN seacos MACS3 Version .NET 1.1
3.7.5 Restower
In this window you can see the re-stowed containers, their old and new positions, serial
number, ports of loading and discharge, weight, operator.
The reason for restow, shift flag, cost object, internal number can be set in dialog window
―Restow details‖ after pressing ―Edit‖ button. If the container should be shifted (re-stowed in
one crane move without placing it on the pier), please check the ―Shifter‖ check box.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 21 of 43
STOWMAN seacos MACS3 Version .NET 1.1
3.7.6 Cranes
In this dialog window you can define the following parameters for terminal cranes:
name and abbreviation
performance in discharge and loading operations
minimal distance to the next crane
maximal working load
Rubber Tired Gantry (RTG) flag
the flag, if the crane can be located independently (e.g. in case of crane on separate
rails)
order on terminal (from left to right)
flags for single, tandem, twin and quad lifts
the colour for displaying on the Crane Split panel
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 22 of 43
STOWMAN seacos MACS3 Version .NET 1.1
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 23 of 43
STOWMAN seacos MACS3 Version .NET 1.1
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 24 of 43
STOWMAN seacos MACS3 Version .NET 1.1
3.7.8 Deadspace
The table on the right side of this dialog box shows the calculated deadspace – the stowage
positions, which cannot be used due to the one of the following reasons:
odd sized cargo in neighbor stacks
stack weight limit restrictions
height restrictions
exceeding lash forces
General Cargo blocking the stack
The summary per operator and reason is showed in the bottom left part of the dialog.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 25 of 43
STOWMAN seacos MACS3 Version .NET 1.1
Weight group of cargo, associated with cargo location in PrePlan condition should
comply with the weight group of the current container on pier (weight groups can be
defined in ―Weight groups‖ dialog box), or
Weight difference between the weight of the container on pier and the weight of the
pre-planned container in PrePlan condition.
3.7.10 Summary
This dialog window shows the summary of operated containers and moves per port call.
The columns of the table are container information for loaded, discharged and restowed
containers. All cargo units will be classified, depending on these criteria, and their
summaries (number of units, TEUs and weight, as well as number of specially handled
containers like DG, OOG, Reefer) will be shown in the corresponding cells. You can see the
list of the containers belonging to the cell by selecting and clicking on the selected cell.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 27 of 43
STOWMAN seacos MACS3 Version .NET 1.1
under ―Belco/Display‖ menu item). Otherwise, standard criteria, defined on ―Color‖ tab page
in the ―Display‖ dialog box (available under ―Belco/Display‖ menu item), will be used.
By pressing ‗Add‘ or ‗Edit‘ button the new dialog window will be opened. There you can
specify the limitations of TEUs and of the total weight (in tons) for each operator:
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 28 of 43
STOWMAN seacos MACS3 Version .NET 1.1
Partner operator means that in case if cargo of this operator is above the limit, the unused
allocations of Partner operator can be used (partner switch)
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 29 of 43
STOWMAN seacos MACS3 Version .NET 1.1
First of all you should load the pre-stow (load the voyage file and switch to the departure
pre-stow of correspondent port call).
Since the quality of merged data cannot be better as the quality of source data, please
ensure using condition check, that all problems that could be resolved at the time are
resolved:
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 30 of 43
STOWMAN seacos MACS3 Version .NET 1.1
After checking of pre-stow is completed, open the ―Merge with Terminal‖ dialog box using
Planning menu:
In both preplan and terminal groups all container will be splited according to their origin into
Remain-On-Board (ROBs) containers and Loaders.
Then load the preliminary or final departure file from terminal using ―Select Condition‖
button in Terminal group. File name and file processing progress will be shown
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 31 of 43
STOWMAN seacos MACS3 Version .NET 1.1
After both condition are loaded and processed, the result of condition comparison will be
shown in comparison group the results are shown separately for ROB and Loaders. Cargo
units, that were in pre-stow, but are not in the terminal condition, are treated as rejected.
Cargo, that was not in pre-stow condition, but appears in the terminal condition are treated
as added.
ROBs are splitted according to their position (untouched and restowers)
Loaded container however, are splitted twice: not only according to their nature (ordinary,
specials and IMDG), and also according to their position (loaded to the same position as it
was in prestow or re-planned by terminal to another position on board).
At this point you can decide for either full automatic merge or make some manual
adjustments.
During full automatic merge information of ROB container will be taken from pre-stow. For
the loaders information about Dangerous Goods, Remarks and Booking numbers will be
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 32 of 43
STOWMAN seacos MACS3 Version .NET 1.1
taken from preplan, other information – from terminal. Cargo position on board will always
taken from terminal condition.
If you want to make manual adjustments, please press ―Merge‖ button of the corresponding
cargo category in comparison group. Information that is different in prestow and terminal
conditions, will be highlighted: it will be red, if current source of this information item is
Terminal, and yellow, if this information was taken from prestow:
You can switch the source of information for any row or groups of rows by first selecting
corresponding cargo units in the list, and selecting the data source for specific information
item – if the source of conflicting item will change, its color and cell value will be also
changed.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 33 of 43
STOWMAN seacos MACS3 Version .NET 1.1
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 34 of 43
STOWMAN seacos MACS3 Version .NET 1.1
Figure below contains allocation in one 20-feet bay with 3 hatch-covers for 3 different
PODs:
In bottom hold tiers under portside hatch-cover and in outer portside stack on deck -
for 20 feet containers, that should be discharged in Antwerp (BEANR, pale green
colour); top tier in hold under portside hatch-cover and in inner portside stacks on
deck - for 40 feet containers with same destination;
In bottom hold tiers under central hatch-cover - for 20 feet containers, that should be
discharged in Rotterdam (BEANR, aqua colour); top tier in hold under central hatch-
cover and in central stacks on deck - for 40 feet containers with same destination;
In bottom hold tiers under starboard hatch-cover and in outer starboard stack on
deck - for 20 feet containers, that should be discharged in Le Havre (FRLEH,
medium orchid colour); top tier in hold under starboard hatch-cover and in inner
starboard stacks on deck - for 40 feet containers with same destination;
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 35 of 43
STOWMAN seacos MACS3 Version .NET 1.1
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 36 of 43
STOWMAN seacos MACS3 Version .NET 1.1
The menu item ―Save Allocation‖ saves allocations in mxml file. The menu item ―Load
Allocation‖ loads previously saved allocations from mxml file, allowing you to reuse
previously defined allocations, and to form the base of ―good‖ allocations.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 37 of 43
STOWMAN seacos MACS3 Version .NET 1.1
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 38 of 43
STOWMAN seacos MACS3 Version .NET 1.1
If ―Add sequence number‖ check box is active, the automatically increasing sequence
number will be generated. This number can be used in crane split for creation of crane
loading sequences in the same order, in which they were planned.
If ―Single selection at pier‖ is active, only clicked container will be selected when you click
on pier container. Otherwise, the clicked container and all container below in the pier list will
be selected.
If ―Use pier Recap as filter for Bay View‖ is selected, then you will see only containers for
selected POD/of selected operator, depending on ―Recap‖ menu item state in Pier context
menu. All other containers will be filtered out.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 39 of 43
STOWMAN seacos MACS3 Version .NET 1.1
If ―Filter in BayView: always show hazardous and reefers‖ is active, then DG- and reefer
containers will be always shown, even if they are filtered out by BayView filter.
If ―Enable planning in TotalView‖ is active, than you will we able to plan/unplan the
containers even in TotalView mode of BayView. Please note, that even on the middle size
vessels it can be difficult to trace operations visually, if all containers are displayed
simultaneously.
If ―Allow unplan of ROB‖ is active, than you will be able to un-plan the ROB Cargo, even
occasionally. Please be careful with this option and try to keep it unchecked until you plan
on-demand restowers.
If ―Default birthing side sb‖ is active, than the vessel will be considered as bithing not on the
portside, but on starboard.
If ―Shade ROB while planning‖ is active, than the container, remaining on board during this
port call will be shaded and not full-colored.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 40 of 43
STOWMAN seacos MACS3 Version .NET 1.1
Belco area with buttons for switching between Viewing/Planning Mode, Quick
Search on board, Undo Last step, List of DaGo on board, and for the lashing
according to the default lashing plan.
Planning area with most important operations from planning menu: Restow List,
allocations, checks, ROB processing settings, etc
Tools area with buttons for Port Call List, Condition Check, Merge with Terminal,
Print/PDF
Bay View selector
Color criterion selection area
Text criterion selection area
Filter criterion selection area
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 41 of 43
STOWMAN seacos MACS3 Version .NET 1.1
Beside location and quay, for each report you can define:
1) one or two PDF configuration,
2) (optionally) To, CC and BCC fields
3) (optionally) Format of the subject line
4) (optionally) Attachments in any of the formats, supported by MACS3
5) Compression (no compression; attachments only; all items)
To send the report, select ―Send Port reports…‖ item in ―Planning‖ menu. First of all
StowMAN will try the exact port/quay combination, then just port location, and then –
general configuration, where the location is not defined. The report creation progress will
be shown in notification window in right-bottom part pf the main display.
_________________________________________________________________________________________________________________
INTERSCHALT maritime systems AG – Wilhelmstrasse 7-9 – 24937 Flensburg – phone +49 (0) 461 43041-0
fax +49 (0) 461 43041-499 (-498) – email to: macs3@interschalt.de
Page 43 of 43