Concrete Log Book

This concrete inspection sheet documents concrete activities at a site. It records details such as the location, start and finish dates of concreting, total quantity poured to date, client and project title. It also tracks metrics for each concrete item/structure like quantity, casting date, bulk density, air content, slump, temperatures and scheduled crushing dates for cube tests at 7 and 28 days. Signatures are included to verify preparation and review of the log.

Uploaded by

bhct1987
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views2 pages

Concrete Log Book

This concrete inspection sheet documents concrete activities at a site. It records details such as the location, start and finish dates of concreting, total quantity poured to date, client and project title. It also tracks metrics for each concrete item/structure like quantity, casting date, bulk density, air content, slump, temperatures and scheduled crushing dates for cube tests at 7 and 28 days. Signatures are included to verify preparation and review of the log.

Uploaded by

bhct1987
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Concrete Inspection Sheet # CI-9

Location of Site: Start Concrete :

Finish Concrete:
Description of Concrete Activities: Total Quantity of Concrete to Date:
Concreting
Log Book m³
Client: Project Title:

QYT m³/ea Total Casting Bulk Test Air Slump Concrete Air Grade Crushing
Date Density Cube Content Temp. Temp. Date
Item Structure [ea] [m³] [m³] [kg/m³] # [%] [mm] [°C] [°C] 7 Days 28 Days

Prepared by MAN: Reviewed by Owners´ Engineer: Page:


Concrete Inspection Sheet # CI-9
Location of Site: Start Concrete :

Finish Concrete:
Description of Concrete Activities: Total Quantity of Concrete to Date:
Concreting
Log Book m³
Client: Project Title:

QYT m³/ea Total Casting Bulk Test Air Slump Concrete Air Grade Crushing
Date Density Cube Content Temp. Temp. Date
Item Structure [ea] [m³] [m³] [kg/m³] # [%] [mm] [°C] [°C] 7 Days 28 Days
Name/Signature/Date Name/Signature/Date