We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 10
Gaba Sigma Instrumentations & Calibrations
Booth No. 13, Sector 110, TDI City,
Mohali-140307 (Punjab)
Mob.: +91-98766-96177, 98766-13855
E-mail : sigmacalibration@gmail.com
Web.: wwwsicindia.in
€€2340 Page 1/5
ULR No. : €C23402000000099F Certificate No. -SIC/IT/2019-20/6-028
CALIBRATION CERTIFICATE
IMPACT TESTER (CHARPY) AS PER ISO 148:2016:PART-2
{Direct Method)
Req, Date of Calibration 04.02.2020 Date of Calibration 14.02.2020
Certificate Issue Date 20.02.2020 ‘Next Calibration Reco Date 14.02.2023
aebiagige 88 Customer's Namer & Address :
IMachine Sr. No. 01/2014-1237
Make FE M/s. Kova fasteners Pvt. Ltd,
Room temp. (t 2°C) 20 8-30-1858/2B, Sherpur Kalan,
Location us. Phase -V, FocalPoint,Ludhiana,
iause 6. Dir
[clause 6.1 General
2) Foundation/Installation Jd) Anvil and Supports
lb) Machine framework Je) indicating equipment
Jc) Pendulum including the Hammer and Striker
6.2 [Foundation/installation Required [observed _ [Remarks
6.2.1 _ | Weight of padestal(Certified by manufacturer) Certified By Mig |_287.5 kg ok
6.2.2 [Weight of foundation(Certified during installation) 340 x weight of pendulum [Certified by Customer
(6.2.3. [Ensuring the bolts are tightened properly and torque value
recorded, Incase of any method of fixing Bolts tightening torque | >68 Nm ox
is used to make a note accordingly.
feaab [Ensuring the machine is Tree fom external vibration
for confirming a small container of water is placed on a ‘To be checked
location or on a reference point provided by the” by keeping a glass ok ok
manufacturer and if absence of ripples noticed then the of water
requirement has been met.
[6.3 | Machine Framework .
6.3.1 _ [inspection of the machine framework shall be determined by the following items:
a) |Free postion of pendulam
bb) |ocation of pendulum in elation to the supports
)_ [Transverse and radial play of pendulum bearings
8) _|clearance between the hammer and the framework
[6.3.2 _| Axis of rotation of the pendulum parallel tothe reference plane within 2/1000 0.3/1000_[_cer.ay ive
[6.33 |The machine shall be installed so that the reference 2/1000 Ge OK
plane is horizontal to within
5 fentereoreten nese ares texais | wninzemn | ozomm |
[635 | The plane of swing of pendulum shall be 90°+0.1'to avis 30201 Geaeawras | OK
Deals in : Material Testing Machines (UTM, Hardness, Impact and Calibrations)Page 2/5
ULR No. : 6234020000099 Certificate No. - SI¢/!T/2019-20/C-028
[clause _[Discription Required [Observed | Remarks
[63.6 |The striker shall make contact over the full thickness of test piece Full contact with Full contace: ‘OK
(i.e having dimension of Ssmm x10 mmx 10 mm) Test piece
[6.3.7 |The location of pendulum Is such that the center of striker and the —— ae OK
center gap between the anvils are coincident to within 0.5mm,
[6.3.8 [Axial play in the pendulum bearings shall not exceed 0.25 mm,
measured at the centre-of-rotation under a transverse force of 0.25mm 0.10 mm ok
lapproximately 4% of effective weight of the pendulum
[6.3.9 |Radial play of the shaft in the pendulum bearings shall not exceed
0.008 mm,When a force of 150 Nt 10N is applied at a distance L 0.08mm 0.02 mm oK
lperpendicular to the plane of swing of pendulum.
[6.3.10 |it is recommended that the mass of the base of the machine Physical nn ‘OK
framework be at least 12 times that of the pendulum, examination.
6.4 |Pendulum:
[6.4.1 |The verification of the pendulum (including striker) shall consist of determining the following quantities,
a. Potential Energy, Kp;
b. Error in the indicated absorbed energy, Ks;
Jc. Velocity of pendulum at instant of impact;
Jd. Energy absorbed by friction;
Je. Position of centre of percussion(i.e distance from the center of precussion to axis of rotation);
It. Radius of the striking edge of the striker;
g. Angle between the line of contact of the striker and the horizontal axis of the test piece.
[64.2 [potential Energy:
(1-c0s a) Where M= Force in N (F) x Length in mtr.(I]& a = Total Angle of fallin”
Parameter 1 2 3 ‘Average
Length in mtr) osiasa [ osi4sa | osiasa | osiasa
Inti Angle in” erie | ero | 6ri0" 6710"
Final Angelin ~ 738 [7438 | 7938" 74°38
[Total angle offallin ~ (a) qaras" | saree 14148!
Force in (ND 206.2 206.2 206.2
Potential Eneray: 300.06 |, 300.06 300.06
Nominal Energy Potential Energy % Error Remarks
Energy Kn{Joules) Energy KplJoules) : (Kn-kp)/Knxt00
300 300.06 -0.020 oO
Potential Energy Kp should be within #1% of Nominal Energy Kn
Note: Angle measurement is done to the accurecy of # 0.2"
Length and Force are measured to the accuracy of 20.2%Page 3/5
ULR No. : €€23402000000099F Centficate No. :-Si¢/IT/2019-20/¢-028
(6.43 [Energy absorbed/Eneray indicated & Error
Force M=tx 168.02 ‘Angle of Fall a=141" 68
sr. No, indicated absorbed energy = Fx x (1 cos Bcale) = M [eos B-cos )
indicated ‘Angle of rise ‘Absorbed Energy (0) Tolerance mit JRemarks
nergy () Keale= M (cos B-cos a) 0
J deg min i 1 J
1 o or 10 1.13 113) ()45t015
2 30 53° 03 30.76 0.76 28,50 to 31.50
3 0 ar o7 60.67 0.67, 58.50 t0 61.50
4 90 20" 90.39 0.39 88.50 10 91.50
5 150) 237 154.06 1.06 148.50 to 151.50
6 240 co 239.47 0.53) 237,00 to 243.00
7 300 on 300.06 0.06 237.00 to 303.00
6.44 Velocity V: ‘sqrt2x9.81x0.81484(1- cos141" 48')= 5.34misec
JO-45 |The energy absorbed by friction includes, But is not limited to Air resistance, Bearing friction and the friction of indicating
pointer. These losses shall be estimated,
[64.5.1 Losses due to pointer friction(i): p = KI-K2 _ { When scale graduated in energy units)
[Energy absorbed when the pendulum is released without specimen
For the first time = Ki 8 for second time = K2 (without resetting the pointer)
Energy 30) 20) 30) a0) Mean =KI-K2U)
Ki ° 0 0 0 0 Oa
K2 “0.4 “0.4 04 04 04
[6.4.5.2 [Determination of loss caused by bearing friction and air resistance for one half swings p' = 4/10(K3-K2)
JAfter K2 is determined, pendulum is placed in its location. Without resetting the pointer, release pendulum
Permit it to swing for 10 half swings, when it starts for 11th swing, move the pointer to about $% ofthe scale range capacity
K3 is observed as: 8}
"= 1/10 (K3 -K2) =1/10(8.0+0.4)= 0.84)
Total friction loss :- (P+P"), so measured,shall not exceed 0.5% of the nominal energy, Kn.
Pointer friction Bearirg friction & [Total loss pep’) [%onNominal€. | Remarks
loss p 0) Air resistance p'()) (Total 1oss/KN) %)
04 0.88 124 041% OK
16.4.6 —_|center of percussion :- .
Pendulum is allowed to complete 100 swings with an angle not exceeding S‘and noted
Time 1 (Sec.) asec) __[Ta(See) ‘Mean t (Sec.)
Sec 381 181 181 381
[Center of percussion @t :-0.2485x/(txt) imit= 0.995@ + 0.005¢ [Remarks
[8i8.81mm to 810.66mm Satisfactory
[Note = Tmax- Tmin should be within 0.2 secPage 4/5
ULR No. : €C23402000000099F Certificate No. :- SIC/IT/2019-20/C-028
Clause [Description Required observed Remarks
[6-4-7 |pimensions of Striker: Striker used = 2 mm/8 mm striker
[Parameters 2mm striker [e mm striker 2mm. OK.
[Radius required 2t025mm N/A ‘Checked with RG OK,
Width required 10 to 18 mm N/A 17.82 mm OK
[shoulder radius NA N/A 5
[Width of edge N/A NA =
[Angle of Striker 3021 N/A ‘checked with AG OK,
16.4.8 [The angle between the line of contact of the striker and the 90° 2° Gnaeus. OK
horizontal axis of the test piece shal be
[6.4.9 |The mechanism for releasing the pendulum from its initial position Physical
shall operate freely and permit release of the pendulum without initial Inspection OK oK
limpulse, retardation or side vibration.
Brake mechanism: Manual/ Electic ‘Manual ‘Manual OK
[6.4.12 [Machines with automatic lifting devices shall be constructed so that
the direct verification can be performed. Arrangement = Y/N
65 [Anvil and Supports
16.5.1 Ja) Configuration of the Supports;
lb) Configuration of the anvils;
Jc) Distance between the Anvils;
ld) Taper & Radius of the Anvils;
Je) Clearance for the broken test place to exit the machine.
[6.5.2 [Anvil supports where the specimen is placed shall be parallel on fae a
to the axis of rotation of the pendulam checked within 3/1000
Distance between the support plane is limited within 0.1 mm within 0.1mm, 0.015 OK.
[6.5.3 |The anvils and supports are verified as below:
[The supports are perpendicular to the anvils 90° 0.1" Checked with AG OK
[The planes facing the test piece shall be parallel and within 0.1mm ‘oimm, 0.015) x
Distance between anvils. 40 mm + 0.2mm, 40.00
Radius of A ‘mm+0.5mm_ Checked with 8. OK
[Angle of taper of Anvil wer Checked wih AG. OK
16.5.4 [Shrouds of the following specifications shall be provided for Requirement
Shroud Parameters
[Thickness Approx. 1.5mm OK
[Minimum Hardness 45 HRC OK.
[Radius at the underside corners ‘At least 1.5mm OK.
[Clearnce between shrouds and hammer overhang* Within 1.5 mm = OK.
*Not applicable for C type hammerPage 5/5
ULR No. : CC23402000000099F Certificate No. :- SIC/IT/2019-20/C-028
[6.6 indicating Equipment:-
Unit of measurement : Angle in '/ Energy in Joules ee al oe
|(Recommended ratios are 1:4, 1:5 or 1:10).
IC) Scale Interval - 3.0) 2 OK
ithe range fluctutaion)
/* The machine has been verified as per ISO:148 : 2016 (Part-2) clause 6 for Direct Verification and the errors/
Q %
Www gy
OD Cm
Name of Instruments _| Calibration Certificate No. Valid upto Identy/ Sr.No. Uc [Traceability
Weighing Scale ITCCS/2019/27132 }26.04.2020 WB-02 0.001 kg [Indiana Lab.
Digital Stop Watch ITCCS/2019/28650 [30.05.2020 ‘SW-369 £0.22% _|Indiana Lab.
Tape ITCCS/2019/27138 [27.04.2020 SIC/IT/MT-O1 ft 200 (um/M} indiana Lab.Sigma Instrumentations & Calibrations
Booth No. 13, Sector 110, TDI City,
Mohali-140307 (Punjab)
Mob.: +91-98766-96177, 98766-13855
E-mail : sigmacalibration@gmail.com
Web.: www-sicindia.in
Shoot No. 1/2
‘SICJUTMI2019-20/C-229
7
CC-2340
ULR No.: CC234020000000103F
Certificate No.:
CALIBRATION CERTIFICATE
UNIVERSAL TESTING MACHINE
DATE OF REQUEST 04.02.2020 DATE OF CALIBRATION : 14.02.2020
CERT. ISSUE DATE 20.02.2020 NEXT CAL. SUGG. ON 14.02.2021
MACHINE MODEL UTE -40 CUSTOMER'S NAME & ADDRESS
SR. NO. 1012013 - 5207
MAKE FIE Mis. Kova Fasteners Pvt. Ltd.
ROOM TEMP.(: 2°C) 20 8-30 - 1858/2 B, Sherpur Kalan,
LOCATION LAB. Phase-IV, Focal Point,
Ludhiana (Pb.)
Rango (KN) : 0-400 Calibration in:_Compression
[Detal of toree inst Se No. 34917 Inst. Caran Cer. Ref Trak Case
IMemurnginstument _[Capacty 100KN __dueon 17.08.2020 ___FRUOS/IENO7E4 __10Nto 100N
Detal of tree ns. Sr No 43811 Inet. Caran ‘ent Rt nat. Class =1
IMemuinginsiument _[capacty 10004N due on 17062020 ___FRUOQ/IB/0765 _100Nto 1000 KN
Fore) | Saat] Seat Dasenedl Wear] DH | WEror | WRpbIy. | LoadRes. | Cane
ww | 24 | temp. [7 2 z iN
to] 1051] 1.050 [1003 | t0a7 | 100 [1005 | acns [oa] —0m8 | 000
zo | 204 | 20% | 2063 | 208 | 20% | 2064 | ooo | oss | om | oe
ao | 4100 | ates | are | ater | asra | are | ooo | o22 | oor | coe
eo | sae | ose | exes | eave | 0205 | e260 | oor | o1 | o16 | o02
1o0_|_10492 | 1oas: | 04s | 1047 | toss | 1047 | oor | o10 | on | ove
Force) | Sid. atc] Ste at Observed Mean | Dit. | %eror | RDIY | Load Res.
wn | 24 | temp. [7 2 z i
soo] tos | 1009 | soar | 10a | toma [toa | ocae [ors | 010 | 008
to | 1087 | 1005 | 1670 | 1008 | tee: | 1582 | coos | oz | 036 | 00
no | 250 | 2520 | asia |- 252 | 2520 | 220 | aos | a3 | o16 | o1
so | asre | sare | 262 | 3266 | 280 | 3362 | oo | oa | oa | on
ao | 42s | a210 | aise | sor | ates | 40s | oo | oar | or | on
Dos Reacngr on Rerova tFocaGey | 004 | 004 | 002 [ee Uncen chee 0277
Relative zero ero) 001 | 0010 | 0.005
[sximum deviation newng Exp Uncetanty 2) 0706
ee
OP Sharma
Quality Manager
ie
Rajat Mankotia
Deals in : Material Testing Machines (UTM, Hardness, Impact and Calibrations)Sheet No. 2/2
An No.: €6234020000000103F Certificate No.: SICIUTM/2019-201C-229
Decent oe ceiver doe penervac ach oe wrens
ASPERIC-e28Pon ): 2018 IDENTICAL TO 16075004: 2004
{# THE MESUREMENTS ARE TRACEABLE TO NATIONAL STANDARD.
UNCERTAINTY OF MEASUREMENT IS AT APPROXIMATELY 95% CONFIDENCE LEVEL, k=2 FOR Veth-30 OR AS PER NABL-141
RESULT RELATE ONLY TO THE ITEM CALIBRATED.
{# THis CERTIFICATE MAY NOT BE REPRODUCED EXCEPT IN FULL UNLESS WRITTEN PERMISSION HAS BEEN OBTAINED
FROM MS. SIGMA INSTRUMENTATIONS & CALIBRATIONS, MOHALI
SIGMA monies & CALIBRATIONS
OP Sharma Rajat Mankotia
Quality Manager
Accredited by NABL ( Ministry of Science & Technology, Govt of India )Sigma Instrumentations & Calibrations
Booth No. 13, Sector 110, TDI City,
Mohali-140307 (Punjab)
Mob.: +91-98766-96177, 98766-13855
E-mail: sigmacalibration@gmail.com
‘Web.: www.sicindia.in
Certificate No. :_SIC/RHT/2019-20/C-275
CALIBRATION CERTIFICATE
ROCKWELL HARDNESS TESTER
DATE OF REQUEST : 04.02.2020 DATE OF CALIBRATION : 14.02.2020
CERT. ISSUE DATE : 20.02.2020 NEXT CAL. SUGG.ON : 14.02.2021
MODEL 1 TRS
‘SERIAL NUMBER : 2003/1278 CUSTOMER'S NAME & ADDRESS:
MAKE 2 FINE
RESOLUTION OF MACHINE =: 04 Mis. Kova Fasteners Pvt. Ltd.
MACHINE LOCATION : LAB, B-30 - 1858/2 B, Sherpur Kalan,
METHOD OF VERIFICATON : INDIRECT Phase-IV, Focal Point,
MEANS OF VERIFICATION: TESTBLOCK Ludhiana (Pb)
ROOM TEMP,+2°C) a)
ARONESS [EST STOTEST|UTS [WPL CERTIIGATENO,| OBSERVED READINGS JNO JOW—]RTTY [Uncon™
lscares lavock latocx {AND DUE DATE fen [or HR
sano _|vatuew ao Hae i i Na
Re [ostsuea]| zee [ou | “EBERE™ [aos [m7 | m0 ava] mz | me] ov | om | om
wane [oaescas| avee [om | MMEMCIRC™™ Toe [ «or | aoa] oa] ow | oz] ae | om | os8
wre [arezien] coer [om | MHEBCC™™ Toon | com] cos| os] oo7 | ove] oor | ow | om
ao car
wre [orecies| azar [ove | Mueeitec™™ [arr | are | 20a | ava] aos | as | on | om | ove
aS ae
wre [oretees| reas [owe | Mmmmertece® | re | 704 | 700] 706] 750 | 755 | ons | 07 | om
Taner
wre [oriserie| soar [ows | Mmmmpieecs® | cos [or [cor] ooo] ois | ove | oz | om | om
# ALL THE MASTER TEST BLOCKS USED FOR CALIBRATION ARE TRACEABLE TO NPL, NEW DELHI
‘# THIS MACHINE HAS BEEN VERIFIED FOR ITS ACCURACY AND REPEATABILITY AS PER IS-1586 (Part 2)2018 IDENTICAL TO ISO 6508-2:2018,
ASTM E18 AND THE RESULTS ARE FOUND WITHIN PERMISSIBLE LIMITS.
{THE RELATIVE EXPENDED UNCERTAINTY HAS BEEN COMPUTED AT 85% CONFIDENCE LEVEE, k=2 FOR VetP30 OR AS PER NABL-‘A,
ERROR NOT INCLUDED IN REPORTED UNCERTAINTY
# RESULT RELATE ONLY TO THE ITEM CALIBRATED.
# THIS CERTIFICATE MAY NOT BE REPRODUCED EXCEPT IN FULL UNLESS WRITTEN PERMISSION HAS BEEN OBTAINED
FROM MS, SIGMA INSTRUMENTATIONS & CALIBRATIONS, MOHALL
SIGMA _—_ & CALIBRATIONS
/ 2
Oslo BA
Authorised Signatory Calibrated By
OP Sharma ‘Subhash Mankotia
Quality Manager
Deals in : Material Testing Machines (UTM, Hardness, Impact and Calibrations)Sigma Instrumentations & Calibrations
Booth No. 13, Sector 110, TOI City,
Mohali-140307 (Punjab)
Mob: +91-98766-96177, 98766-13855
E-mail: sigmacalibration@gmail.com
Web.: www-sicindia.in
ULR No.: €C234020000000101F Certificate No. : _SIC/RHT/2019-20/C-274
CALIBRATION CERTIFICATE
ROCKWELL HARDNESS TESTER
DATE OF REQUEST : 04.02.2020 DATE OF CALIBRATION : 14.02.2020
CERT. ISSUE DATE : 20.02.2020 NEXT CAL.SUGG.ON : 14.02.2021
MODEL + RAS
‘SERIAL NUMBER 13/11/094 CUSTOMER'S NAME & ADDRESS:
MAKE SARS
RESOLUTION OF MACHINE O41 Mis. Kova Fasteners Pvt. Ltd.
MACHINE LOCATION : LAB B-30 - 1858/2 B, Sherpur Kalan,
METHOD OF VERIFICATON INDIRECT Phase-IV, Focal Point,
MEANS OF VERIFICATION ‘TEST BLOCK Ludhiana (Pb.)
ROOM TEMP,(+2°C) a)
HARDNESS [TEST —_SYOTEST|UTE [NPL CERTIHGATE NO. OBSERVED READINGS [SRO RPTTY Uncart™
Iscatts lavocx —|evocx ‘ND OUE DATE fm [ot HR
ISR.NO___|VALUE(H) | (H1,H2,H3,H4,H5) 1 [nan nt
wc | oxeaa| asse [ose| MRBTEC™ | was [avr] a7] mel m1 | a0 | om | oe | oni
RC [cxisoeas| ance [oar] memcieea® |co7 | woe] ar] «o2| a2 | wo] ow [om] ov
Ro [ mrearee| coat | ona | Menwcieses® 1s) | eos | oos| os] eo7 | eos | on | oa | oss
wR [rteaiea| aver | ova | ™umerioueae 1277 [ora | za1| zea] 206 | 201] oz | om | om
vine [orreroos[ res [ose | uemniesems | 751 | ves | ves | ror | veo | 705 | 048 | 000 | 070
wine [ovearse] ooa7 [oss | Mmmaoisse™™ sos [eos | vor| oar] soe | woe | ove | oxo | one
# ALL THE MASTER TEST BLOCKS USED FOR CALIBRATION ARE TRACEABLE TO NPL, NEW DELHI
{# THIS MACHINE HAS BEEN VERIFIED FOR ITS ACCURACY AND REPEATABILITY AS PER IS-1586 (Part 2)2018 IDENTICAL TO ISO 6508-2:2015,
[ASTM E18 AND THE RESULTS ARE FOUND WITHIN PERMISSIBLE LIMITS.
‘# THE RELATIVE EXPENDED UNCERTAINTY HAS BEEN COMPUTED AT 95% CONFIDENCE LEVEL, k=2 FOR Veff-20 OR AS PER NABL-141,
ERROR NOT INCLUDED IN REPORTED UNCERTAINTY
WRESULT RELATE ONLY TO THE ITEM CALIBRATED.
# THIS CERTIFICATE MAY NOT BE REPRODUCED EXCEPT IN FULL UNLESS WRITTEN PERMISSION HAS BEEN OBTAINED
FROM MIS, SIGMA INSTRUMENTATIONS & CALIBRATIONS, MOHALL
SIGMA INSTRUMENTATIONS & CALIBRATIONS
Gs Signatory Calibrated By
OP Sharma Subhash Mankotia
Quality Manager
Deals in : Material Testing Machines (UTM, Hardness, Impact and Calibrations)Sigma Instrumentations & Calibrations
Booth No. 13, Sector 110, TDI City,
Mohali-140307 (Punjab)
Mob.: +91-98766-96177, 98766-13855
E-mail: sigmacalibration@gmail.com
Web.: www.sicindia.in
ULR No.: €C234020000000100F Certificate No. :_SICIVHT/2019-20/C-273
CALIBRATION CERTIFICATE
VICKER HARDNESS TESTER
DATE OF REQUEST : 04.02.2020 DATE OF CALIBRATION : 14.02.2020
CERT. ISSUE DATE : 20.02.2020 NEXT CAL.SUGG.ON : 14.02.2021
MODEL vM- 60
‘SERIAL NUMBER ’ 01/2014 - 1450 CUSTOMER'S NAME & ADDRES:
MAKE PFE
RESOLUTION OF MACHINE 0.001 Mis. Kova Fasteners Pvt. Ltd.
MACHINE LOCATION LAB B-30 - 1858/2B, Sherpur Kalan,
METHOD OF VERIFICATON —: INDIRECT Phase-1V, Focal Point,
MEANS OF VERIFICATION: ‘TEST BLOCK Ludhiana (Pb.)
ROOM TEMP,(+2°C) nes
RARONEGS]TEST ——SYOTEST|UTS NLR FRI SBSERVED RERONGS VERO RPTY Oncart>
IscattsJavocx —avocx lceRmicaTe no. few (ier HV
sano [varuew D DUE DATE cue He) ao
wae | rion | rs2a0 [ons] eROuerteie Trea0] rena] 1850] 1050] sero] se48| 220 | «00 | 181
wavao | rower | cons | on | rovers” Tsao] ese0|ese0| ras0| voa0| eee«| 10 | e00 | aos
ALL THE MASTER TEST BLOCKS USED FOR CALIBRATION ARE TRACEABLE TO NPL, NEW DELHI
{# THIS MACHINE HAS BEEN VERIFIED FOR ITS ACCURECY AND REPETABILITY AS PER IS-1501(PART-2)-2013 AND THE RESUTS ARE FOUND
WITHIN PERMISSIBLE LIMITS
# THE RELATIVE EXPENDED UNCERTAINTY HAS BEEN COMPUTED AT 95% CONFIDENCE LEVEL, k=2 FOR Vetf>30 OR AS PER NABL-141
ERROR NOT INCLUDED IN REPORTED UNCERTAINTY
#® RESULT RELATE ONLY TO THE ITEM CALIBRATED.
{# THIS CERTIFICATE MAY NOT BE REPRODUCED EXCEPT IN FULL UNLESS WRITTEN PERMISSION HAS BEEN OBTAINED FROM
IWS, SIGMA INSTRUMENTATIONS & CALIBRATIONS, MOHALI
SIGMA INSTRUMENTATIONS & CALIBRATIONS . &
Calg ee at
Authorised Signatory librated By
OP Sharma Rajat Mankotia
Quality Manager
Deals in : Material Testing Machines (UTM, Hardness, Impact and C;