Village Electrification Policy

This document outlines the criteria for village electrification projects in Pakistan. It lists six programs and specifies the maximum distance allowed from existing 11kV power lines and required minimum population or number of houses. Projects must meet both the distance and population/house thresholds, such as being within 2km of lines and having at least 50 people for the Khushhal Pakistan Programme (Districts). Exceptions and clarifications are also noted.

Uploaded by

hanif khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views1 page

Village Electrification Policy

This document outlines the criteria for village electrification projects in Pakistan. It lists six programs and specifies the maximum distance allowed from existing 11kV power lines and required minimum population or number of houses. Projects must meet both the distance and population/house thresholds, such as being within 2km of lines and having at least 50 people for the Khushhal Pakistan Programme (Districts). Exceptions and clarifications are also noted.

Uploaded by

hanif khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Criteria for Village Electrification

Criteria
Sr. Distance from
No. Projects existing Population
Remarks
11-KV Line

1 Khushhal Pakistan Programme-I (MNA's) - -


Village / settlement for electrification is described as
consisting of minimum 10 compact Houses. A
2 Khushhal Pakistan Programme-II (P.M.D) - -
Cluster of 10 Houses within radius of 400 ft. may be
considered as 10 compact Houses.
3 D.O.P (Village Electrification) - -

2-K.M 50 Persons i) Villages / Settlements having a population of 50


and above must also fulfill the condition of minimum
10 compact houses within a radius of 400 feet.
4 Khushhal Pakistan Programme ii) As clarified by P&D Department, Govt: of Punjab's
letter No. P&D/DP/40/03 dated 20-1-2007, villages /
(Districts)
3-K.M 100 Persons settlements thoses are part of village mentioned in
the 1998 Census Book / Revenue Record and meet
5 Khushhal Pakistan Programme (MPA's) the population & distance from 11 KV Line Criteria
are elegible for rural electrifcation schemes,
received vide CE(RE) Lahore No. 541-43 dated 13-2-
5-K.M 200 Persons 2007

5 Bahawalpur Rural Development Project 6-K.M 200 Persons -

50 Persons
6 Cholistan Development Authority 8-K.M -
08 Houses