Pipeline Replacement HSSE Report

This daily report summarizes HSSE activities for a pipeline replacement project. It notes 43 personnel on site, 1372 work hours without lost time incidents. Two medical treatment cases and one first aid case were reported. Hazards identified include a lack of medical certificates for helpers and unsafe sandblasting equipment. Pictures were also taken but not included. The report concludes with notes on restarting stringing activities with high safety supervision and initiatives for housekeeping and food storage.

Uploaded by

Moaatazz Nouisri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views19 pages

Pipeline Replacement HSSE Report

This daily report summarizes HSSE activities for a pipeline replacement project. It notes 43 personnel on site, 1372 work hours without lost time incidents. Two medical treatment cases and one first aid case were reported. Hazards identified include a lack of medical certificates for helpers and unsafe sandblasting equipment. Pictures were also taken but not included. The report concludes with notes on restarting stringing activities with high safety supervision and initiatives for housekeeping and food storage.

Uploaded by

Moaatazz Nouisri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 19

CONTRACTOR: SUB-CONTRACTOR: COMPANY:

Replacement (5km) of 24’’ Sirtica pipeline


( BEDA junction – ASSIDA junction)
DAILY HSSE REPORT

CONTRACTOR doc. n°: SUB-CONTRACTOR doc. n°: COMPANY doc. n°:


Sheet 1 of 2 DOC Category:

Replacement (5.2km) of 24’’ Sirtica pipeline


( BEDA junction – ASSIDA junction).

DAILY HSSE REPORT

12/22/2018 Issued for Information A.S.SOUISSI S.JAMMOUSSI M.HASNAOUI JILANI SALHI

REV. DATE DESCRIPTION OF REVISION PREPARED BY CHECKED BY APPROVED BY CONDUCTED BY


DAILY HSSE REPORT

Replacement (5km) of 24’’


Sirtica pipeline ( BEDA
junction – ASSIDA junction)

Area: Yard/CAMP Weather Conditions : Date:

Report Details
Project Replacement (5.2km) of 24’’ Sirtica pipeline ( BEDA junction – ASSIDA junction)
DAAM Representative MOHEDIN ELHASSNAOUI
CLIENT HAROUGE
CLIENT representative at site RAMDEV
Report date 16/10/2019
Activity start date WELDING/LIFTING AND CLUMPSING/STRINGING/WRAPPING
Activity description WELDING/LIFTING AND CLUMPSING/STRINGING/WRAPPING
PTW Ref REFER TO THE PTW REGISTER

TRANSPORTATION & JOURNEY MANAGEMENT


Kilometers
Type Registration
Today
PICK UP TOYOTA 900412 ON
PICK UP TOYOTA 63423 ON
PICK UP TOYOTA 100898 OFF
ISUZU 1999246 ON
HSSE KPIs
Today Field operations start to date
DAAM Personnel 43
Total field Working hours 1372WITHOUT LTI
TBT conducted DAILY
Fatalities (FAT) 0
LTIs 0
Lost Work Days 0
Date of the last LTI

Restricted Work Injury (RWI) 0


Restricted Work Days 0
Medical Treatment Case (MTC) 2
First Aid Case (FAC) 1
Incident 1
Near Miss 0
Hazards/Finding 0
HIPO 0
Management Walk Around 0
Total training hours 6
HSSE HIGHLIGHTS
NO MEDICAL FITNESS CERTIFICATE OF MANY HELPERS AVAILIBILITY .
LACK OF PPE
NO WHIP CHECK FOR HOSES (SANDBLASTING /CLUMPSING) IS A REAL PRESSURE DANGER.

HSSE LOWLIGHTS / HAZARDS and FINDINGS


LACK OF PROJECT EQUIPEMENT MAINTENANCE .

UNSAFE SANDBLASTING EQUIPEMENT (NO WHIPS TO TIE THE HOSES(Air hose safety cables)/COMPRESSOR NEED MAINTENANCE /DAMAGED H

THE HOO APPROVAL TO USE EXCAVATOR FOR LIFTING

PICTURES
Other Concerns / Observations
RESTART STRINGING ACTIVITY WITH HIGH CONSTRUCTION -SAFETY SUPERVISION

HOUSEKEEPING COMPAIGN
SAFE FOOD STORAGE.
16/10/2019

Report Details
placement (5.2km) of 24’’ Sirtica pipeline ( BEDA junction – ASSIDA junction)
OHEDIN ELHASSNAOUI
AROUGE
AMDEV
/10/2019
ELDING/LIFTING AND CLUMPSING/STRINGING/WRAPPING
ELDING/LIFTING AND CLUMPSING/STRINGING/WRAPPING
EFER TO THE PTW REGISTER

SPORTATION & JOURNEY MANAGEMENT


Kilometers
Field operation start to date

HSSE KPIs
Field operations start to date

HSSE HIGHLIGHTS
PERS AVAILIBILITY .

NG) IS A REAL PRESSURE DANGER.

LOWLIGHTS / HAZARDS and FINDINGS

THE HOSES(Air hose safety cables)/COMPRESSOR NEED MAINTENANCE /DAMAGED HOSES.

TOR FOR LIFTING

PICTURES
Other Concerns / Observations
TRUCTION -SAFETY SUPERVISION

N
Daily PTW REGISTER
DATE:28/06/2019

Attached Cetificates
Ex: Excavation
Performing Number of
PTW Type JSA Attached Lift: Lifting Issuing Area
Activity Authority Company Persons Opening Date Validity Closure Date Status
PTW N° HOT/COLD (Doc Ref, Title) Rad: Radiography Authority (Spread, KP, DJ)
(Task Owner) Involved
E.Is: Electric Isoalation
M. Is: Mechanical Isolation

54 COLD BEVELLING HAROUGE MOHEDIN HASNAOUI DAAM YARD 21/03/19 27/03/19 Closed
56 HOT CUTTING AND WELDING HAROUGE MOHEDIN HASNAOUI DAAM YARD 21/03/19 27/03/19 Closed
Radiography Closed

53 COLD STRINGING HAROUGE MOHEDIN HASNAOUI DAAM SITE 21/03/19 27/03/19 Closed

63 COLD BEVELLING HAROUGE MOHEDIN HASNAOUI DAAM 12 YARD 28/03/19 2/4/2019 Closed

64 COLD STRINGING HAROUGE MOHEDIN HASNAOUI DAAM 6 SITE 22/03/19 2/4/2019 ClOSED

66 COLD BEVELLING HAROUGE BAKRI ABDALH DAAM 6 YARD 4/4/2019 10/4/2019 CLOSED

HOT CLUMPSING HAROUGE MED HEDI DAAM 3 SITE 11/4/2019 17/04/2019 CLOSED

70 HOT W QUALIFICATION TEST HAROUGE MOHEDIN HASNAOUI DAAM HOO WORK SHOP 8/4/2019 9/4/2019 ClOSED

HOT GRINDING HAROUGE MED HEDI DAAM SITE 10/4/2019 16/04/2019 ClOSED

HOT WELDIING HAROUGE MED HEDI DAAM SITE 11/4/2019 17/04/2019 CLOSED

HOT WELDIING HAROUGE MED HEDI DAAM SITE 25/4/2019 1/5/2019 CLOSED

HOT CLUMPSING HAROUGE MED HEDI DAAM SITE 25/4/2019 1/5/2019 CLOSED

HOT WELDIING HAROUGE ABDELHMID ZITONI DAAM BEDA JUNCTIOM 2/5/2019 8/5/2019 CLOSED

HOT CLUMPSING HAROUGE ABDELHMID ZITONI DAAM BEDA JUNCTIOM 2/5/2019 8/5/2019 CLOSED

COLD LIFTING HAROUGE ABDELHMID ZITONI DAAM BEDA JUNCTIOM 9/5/2019 15/05/2019 CLOSED

HOT WELDIING HAROUGE ABDELHMID ZITONI DAAM BEDA JUNCTIOM 9/5/2019 15/05/2019 CLOSED

HOT CLUMPSING HAROUGE ABDELHMID ZITONI DAAM BEDA JUNCTIOM 9/5/2019 15/05/2019 CLOSED

HOT WELDIING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 13/06/2019 20/06/2019 CLOSED

COLD LIFTING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 13/06/2019 20/06/2019 CLOSED

COLD CLUMPSING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 13/06/2019 20/06/2019 CLOSED

COLD SAND REMOVEL HAROUGE ABDELHMID ZITONI DAAM BEDA JUNCTIOM 18/06/2019 24/06/2019 CLOSED

HOT WELDIING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 21/06/2019 27/06/2019 CLOSED

COLD CLUMPSING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 21/06/2019 27/06/2019 CLOSED

COLD LIFTING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 21/06/2019 27/06/2019 CLOSED

COLD CLUMPSING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 5/7/2019 12/7/2019 CLOSED

COLD LIFTING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 5/7/2019 12/7/2019 CLOSED

HOT WELDING HAROUGE MOHAMED BELHEDI DAAM BEDA JUNCTIOM 5/7/2019 12/7/2019 CLOSED

170 COLD BENDING HAROUGE ABDELHMID ZITONI DAAM 5 BEDA JUNCTIOM 15/07/2019 22/07/2019 CLOSED
171 HOT
178 COLD
179 COLD
182 COLD
COLD
HOT
COLD
COLD
COLD
HOT
HOT
COLD
COLD
HOT
COLD
COLD
COLD
COLD
COLD
HOT
COLD
COLD
COLD
HOT
HOT
COLD
COLD
COLD
Daily PTW REGISTER

UP HILL TEST HAROUGE MED HEDI DAAM 7 HOO WS


OPENING ROADS HAROUGE MOHEE DAAM 3
BENDING HAROUGE ZITONI DAAM 5
STRINGING HAROUGE MOHEE DAAM 9
STRINGING HAROUGE MED BLHDI DAAM 10
WELDING HAROUGE MED BLHDI DAAM 12
LIFTING HAROUGE MED BLHDI DAAM 10
STRINGING HAROUGE MOHEE DAAM 10
LIFTING AND CLUMPSING HAROUGE MED BLHDI DAAM
WELDING HAROUGE MED BLHDI DAAM
WELDING HAROUGE MED BLHDI DAAM
LIFTING AND CLUMPSING HAROUGE MED BLHDI DAAM
STRINGING HAROUGE MED BLHDI DAAM
WELDING HAROUGE MOHEE DAAM
LIFTING AND CLUMPSING HAROUGE MOHEE DAAM
WRAPPING HAROUGE MOHEE DAAM
STRINGING HAROUGE MED BLHDI DAAM
LIFTING AND CLUMPSING HAROUGE MED BLHDI DAAM
WRAPPING HAROUGE MED BLHDI DAAM
WELDING HAROUGE MED BLHDI DAAM
LIFTING AND CLUMPSING HAROUGE MED BLHDI DAAM
SANDBLASTING AND W HAROUGE MED BLHDI DAAM
STRINGING HAROUGE MED BLHDI DAAM
WELDING HAROUGE MED BLHDI DAAM
WELDING HAROUGE MED BLHDI DAAM
SANDBLASTING AND W HAROUGE MED BLHDI DAAM
LIFTING AND CLUMPSING HAROUGE MED BLHDI DAAM
STRINGING HAROUGE MED BLHDI DAAM
16/07/2019 16/07/2019 CLOSED
23/07/2019 1/8/2019 CLOSED
23/07/2019 1/8/2019 CLOSED
24/07/2019 2/8/2019 CLOSED
31/08/2019 6/9/2019 CLOSED
4/9/2019 10/9/2019 CLOSED
4/9/2019 10/9/2019 CLOSED
7/92019 13/9/2019 CLOSED
11/17/2019 17/09/2019 CLOSED
11/9/2019 17/09/2019 CLOSED
18/9/2019 24/09/2019 CLOSED
18/9/2019 24/09/2019 CLOSED
22/09/2019 28/09/2019 CLOSED
24/09/2019 30/09/2019 CLOSED
24/09/2019 30/09/2019 CLOSED
24/09/2019 30/09/2019 CLOSED
1/10/2019 7/10/2019 CLOSED
1/10/2019 7/10/2019 CLOSED
1/10/2019 7/10/2019 CLOSED
1/10/2019 7/10/2019 CLOSED
7/10/2019 14/10/2019 CLOSED
7/10/2019 14/10/2014 CLOSED
7/10/2019 14/10/2019 CLOSED
7/10/2019 14/10/2019 CLOSED
15/10/2019 21/10/2019 OPEN
15/10/2019 21/10/2019 OPEN
15/10/2019 21/10/2019 OPEN
15/10/2019 21/10/2019 OPEN
‫‪REPLACEMENT :‬‬

‫ي موقع تبستي‬
‫*‪N‬‬ ‫االسم‬
‫سليم المسعودي ‪1‬‬
‫عبد المجيد التبيني ‪2‬‬
‫‪3‬‬ ‫شريف محمد علي‬
‫‪4‬‬ ‫سليم ابوصفيفة‬
‫‪5‬‬ ‫الجيالني الصالحي‬
‫‪6‬‬ ‫محي الدين الحسناوي‬
‫‪7‬‬ ‫علي موسي‬
‫‪8‬‬ ‫حسين الصردي‬
‫‪9‬‬ ‫عبدالرحمن محمد‬
‫‪10‬‬ ‫االسعد المناعي‬
‫‪11‬‬ ‫ابوكثير ابو علي‬
‫‪12‬‬ ‫صالح العبيدي‬
‫‪13‬‬ ‫علي المثلوثي‬
‫‪14‬‬ ‫عبد السالم الشواط‬
‫‪15‬‬ ‫ناجح بن بلقاسم‬
‫‪16‬‬ ‫عبد الحليم عدالت‬
‫‪17‬‬ ‫عبد المجيد العصلب‬
‫‪18‬‬ ‫مختار احمد‬
‫‪19‬‬ ‫عبدالرحمن مختار‬
‫‪20‬‬ ‫اد ريس سليمان‬
‫‪21‬‬ ‫الثوم فاشر‬
‫‪22‬‬ ‫بكري ادم‬
‫‪23‬‬ ‫رمزي الدريدي‬
‫‪24‬‬ ‫عبد الحميد الزيتوني‬
‫‪25‬‬ ‫ادم بشىر‬
‫‪26‬‬ ‫توفيق ضيفي‬
‫‪27‬‬ ‫ايوب الغريسي‬
‫‪31‬‬ ‫بركة محمد‬
‫‪32‬‬ ‫محمد شكو‬
‫‪33‬‬ ‫راشد مبارك‬
‫‪34‬‬ ‫محمد الهادي‬
‫‪35‬‬ ‫محمد يونس‬
‫‪37‬‬ ‫شريف محمد علي‬
‫‪38‬‬ ‫احمد لكيالن‬
‫‪39‬‬ ‫مجيد الصالحي‬
‫‪40‬‬ ‫نوري بن زيد‬
‫‪41‬‬ ‫يامن بن غربية‬
‫سليم عطية ‪42‬‬
‫‪43‬‬ ‫ياسين المناعي‬
‫‪44‬‬ ‫بدر حداد‬
‫‪45‬‬ ‫زبير كباش‬
‫‪46‬‬ ‫حامد ادم‬
‫‪47‬‬ ‫فيصل مختار‬
‫‪48‬‬ ‫بشير محمد‬
‫محمد علي ‪49‬‬
‫‪50‬‬ ‫مهدي طاهر‬
‫‪51‬‬ ‫وهيب قجة‬
‫‪52‬‬ ‫ادقار ارسو‬
‫‪53‬‬ ‫شكرى بن صالح‬
‫‪54‬‬ ‫وناس بن صالح‬
‫‪55‬‬ ‫على الصالحي‬
‫‪56‬‬ ‫وائل علي‬
‫‪57‬‬ ‫ابراهىم محمد‬
‫‪58‬‬ ‫امادو‬
‫‪59‬‬ ‫احمد حمد‬
‫‪60‬‬ ‫مختار احمد‬
‫‪61‬‬ ‫على صالح‬
‫‪62‬‬ ‫حسن بكر‬
‫‪63‬‬ ‫بكر سنى‬
‫‪64‬‬ ‫عصام عرب‬
‫‪65‬‬ ‫محمد سيد‬

‫‪EXPIR‬‬
‫‪VALID‬‬
‫)‪(10km) of 24’’ Sirtica pipeline ( BEDA junction – ASSIDA junction‬‬

‫قائمة موظفي موقع تبستي‬


‫المسمي الوظيفي‬ ‫الجنسية‬ ‫صالحية التصريح‬
‫لحام‬ ‫‪ 24/10/2019‬تونسي‬
‫مشرف‬ ‫‪ 17-10-2019‬تونسي‬
‫سائق‬ ‫‪ 23-12-2019‬ليبي‬
‫فني‬ ‫‪ 23-8-2019‬تونسي‬
‫مسؤول سالمة مهنية‬ ‫‪ 24-10-2019‬تونسي‬
‫مدير الموقع‬ ‫‪ 30-1-2020‬ليبي‬
‫مساعد طباخ‬ ‫‪ 7/12/2019‬سوداني‬
‫طباخ‬ ‫‪ 13-11-2019‬مغربي‬
‫عامل كامب‬ ‫‪ 7/11/2019‬سوداني‬
‫لحام‬ ‫‪ 24-10-2019‬تونسي‬
‫لحام‬ ‫‪ 23-8-2019‬تونسي‬
‫لحام‬ ‫‪ 24-10-2019‬تونسي‬
‫لحام‬ ‫‪ 23-8-2019‬تونسي‬
‫فني‬ ‫‪ 24-10-2019‬تونسي‬
‫فني‬ ‫‪ 24-10-2019‬تونسي‬
‫لحام‬ ‫‪ 24-10-2019‬تونسي‬
‫سائق‬ ‫‪ 31-12-2019‬ليبي‬
‫سائق‬ ‫‪ 31-12-2019‬ليبي‬
‫سائق‬ ‫‪ 24-2-2020‬ليبي‬
‫عامل‬ ‫‪ 31-12-2019‬ليبي‬
‫مشغل اليات‬ ‫قيد االجراء سوداني‬
‫فني‬ ‫‪ 7/12/2019‬سوداني‬
‫لحام‬ ‫‪ 13/11/2019‬تونسي‬
‫فني‬ ‫‪ 23-8-2019‬تونسي‬
‫عامل‬ ‫‪ 31/12/2019‬ليبي‬
‫لحام‬ ‫‪ 24/10/2019‬تونسي‬
‫فني‬ ‫‪ 24-10-2019‬تونسي‬
‫عامل‬ ‫‪ 31/12/2019‬ليبي‬
‫مسؤول‬ ‫‪ 31/12/2019‬ليبي‬
‫عامل‬ ‫قيد االجراء سوداني‬
‫مشرف‬ ‫‪ 24/10/2019‬تونسي‬
‫سائق اليات‬ ‫قيد االجراء سوداني‬
‫سائق‬ ‫‪ 20-12-2019‬ليبي‬
‫عامل‬ ‫‪ 31/12/2019‬ليبي‬
‫مسؤول الجودة‬ ‫‪ 22/9/2019‬تونسي‬
‫فني‬ ‫‪ 13/11/2019‬تونسي‬
‫فني‬ ‫‪ 13/11/2019‬تونسي‬
‫فني‬ ‫‪ 13/11/2019‬تونسي‬
‫فني‬ ‫‪ 13/11/2019‬تونسي‬
‫سائق اليات‬ ‫‪ 16/02/2019‬ليبي‬
‫سائق‬ ‫‪ 30/09/2019‬سوداني‬
‫عامل‬ ‫‪ 21/02/2019‬ليبي‬
‫عامل‬ ‫‪ 21/02/2019‬ليبي‬
‫سائق‬ ‫ليبي‬
‫سائق‬ ‫سوداني‬
‫مسؤول‬ ‫سوداني‬
‫سائق‬ ‫ليبي‬
‫لحام‬ ‫‪ 2/10/2019‬فلبينى‬
‫فني‬ ‫‪ 26/10/2019‬تونسي‬
‫فني‬ ‫‪ 26/10/2019‬تونسي‬
‫فني‬ ‫‪ 26/10/2019‬تونسي‬
‫سائق‬ ‫‪ 31/12/2019‬ليبي‬
‫فني‬ ‫‪ 6/10/2019‬سوداني‬
‫فني‬ ‫‪ 17/10/2019‬غانى‬
‫فني‬ ‫قيد االجراء سوداني‬
‫سائق‬ ‫‪ 21/11/2019‬ليبي‬
‫سائق‬ ‫‪ 21/2/2020‬ليبي‬
‫عامل‬ ‫‪ 7/4/2020‬ليبي‬
‫عامل‬ ‫‪ 7/4/2020‬ليبي‬
‫مسؤول‬ ‫‪ 22/10/2019‬تونسي‬
‫مساعد طباخ‬ ‫‪ 13/04/2020‬ليبي‬
N*
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
Replacement (10km) of 24’’ Sirtica pipeline ( BEDA junction – ASSIDA junction)
P.O.B

Name Qualification ON / OFF Site HSE Induction & Orientation

SLIM MASSOUDI WELDER ON DONE

ABDELMAGID TIBINI GT MANAGER ON DONE

MAGID SALHI QAQC ON DONE

SLIM BOUSSFIFA PIPE FITTER OFF DONE

JILANI SALHI SAFETY ON DONE

MOHEDINE HASNAWI SITE MANAGER ON DONE

ALI MUSSA COOK HELPER ON DONE

HOUCINE SERDI COOK ON DONE

ABDRAHMN MED LAUNDRY ON DONE

LASAAD MENAAI WELDER ON DONE

BOUKTHIR BEN KLIFA WELDER OFF DONE

SLEH ABIDI WELDER ON DONE

ALI MATHLOTHI WELDER OFF DONE

ABDSLEM CHWAT COATING ON DONE

NAJEH BN BELGACEM COATING OFF DONE

ABDHALIM ADALET WELDER OFF DONE

ABDEL MAJID SOALB DRIVER ON DONE


MOKTHAR AHMED DRIVER OFF DONE
SALEM ELWADIY DRIVER OFF DONE
MOHAMED MOSSA DRIVER OFF DONE
ALTOM FISHER OPERATOR ON DONE
BADR HADED OPERATOR ON DONE
RAMZI DRIDI WELDER ON DONE
ABDEHAMID ZITONI BENDING OPERATOR OFF DONE
MAHMOUD CHELBI WELDER OFF DONE
TAOUFIK DHIFI WELDER ON DONE
GHRISSI AYOUB BEVELLING MACHINE OPERATOON DONE
BEKRI ABDALLH BEVELLING MACHINE OPERATOON DONE
ABD AZIZ MED LABOUR OFF DONE
OMAR MBAREK LABOUR OFF DONE
DAIO ZIN LABOUR OFF DONE
NASER EDINE OMAR LABOUR OFF DONE
RACHED MBAREK LABOUR OFF DONE
MOHAMD HEDI CONSTRUCTION SUPERVISOR ON DONE
SADAM MOHAMED CRANE OPERATOR OFF DONE
RAMI BOUJELBEN PIPE ENGINEER OFF DONE
MOHAMED KHILL DRIVER OFF DONE
ALTOM FISHAR BULLDOZER OPERATOR OFF DONE
RAMI BOUJELBEN ENGINEER OFF DONE
ALI SIF DRIVER OFF DONE
MOKTHAR AHMED TRUCK DRIVER OFF DONE
CHRIF MOHAMED ALI DRIVER OFF DONE

ADEM BACHIR HELPER ON DONE


IDRISS SLIMANE HELPER OFF DONE
AHMED KILANI HELPER ON DONE
MOHAMED CHAKO HELPER OFF DONE
BARAKA MOHAMED HELPER OFF DONE
MAGED AHMED DRIVER ON DONE
YACINE MANAII TECHNICIAN ON DONE
YAMEN BEN GHARBIA TECHNICIAN ON DONE
NOURI BEN ZID TECHNICIAN ON DONE
SLIM ATIA TECHNICIAN ON DONE
ZOBIAR KABECH DRIVER OFF DONE
HAMED ADEM HELPER ON DONE
FIACEL MOKHTAR HELPER ON DONE
MOHAMED ALI DRIVER ON DONE
BACHIR MOHAMED DRIVER OFF DONE
MEHDI TAHR RESPONSIBLE ON DONE
WAHIB GHOGA DRIVER ON DONE
EDGAR ARSO WELDER OFF DONE
CHOKRI BEN SALH COATING ON DONE
WANES BEN SALH COATING ON DONE
ALI SALHI COATING ON DONE
WAEL GHOGA DRIVER ON DONE
IBRAHIM MHAMED SANDBALSTER ON DONE
BKR AMADO MECHANIC ON DONE
AHMED HMED SANDBALSTER ON DONE
MOKHTAR AHMED SANDBALSTER ON DONE
ALI SALH HELPER ON DONE
ISSAM ARAB ENGINEER ON DONE
HASSN ABOU BAKR HELPER ON DONE
ABOU BKR SONI HELPER ON DONE
MOHAMED SIAD COOK HELPER ON DONE
MATERIALS;
4 EXCAVATOR
COMPRESSOR NOT CERTIFIED
2 LAODER
MOBILE CRANE
TOYOTA PICK UP
ISUSU CAR
2 INTERNAL CLUMPS/ OUT SERVICE NOT CERTIFIED
3 TRUCKS EQUIPIED BY 6 WELDING MACHINES
BULLDOZER
2*SANDBLASTER
2*COMPRESSOR
NOT CERTIFIED