The document is a site checklist for well HRDH-1856 dated November 22, 2019. It details the equipment, certifications, and procedures for the well site to ensure safety and compliance. Key items checked include available and certified iron, SCBA, H2S monitors, locks, tags, certifications for the crew, generator condition, hoses, grounding, fire extinguishers, and pressures for the frac tank, pump, and maximum wellhead.

Uploaded by

Mohamed El-Sawah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

Z BS Checklist

The document is a site checklist for well HRDH-1856 dated November 22, 2019. It details the equipment, certifications, and procedures for the well site to ensure safety and compliance. Key items checked include available and certified iron, SCBA, H2S monitors, locks, tags, certifications for the crew, generator condition, hoses, grounding, fire extinguishers, and pressures for the frac tank, pump, and maximum wellhead.

Uploaded by

Mohamed El-Sawah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Site : Site-26 Well Name : HRDH-1856

Day : Date : 22-Nov-2019


BS Check List Name Gin No Position
Ok Not Ok Majdi Babou 4585170 Day Shift Operator
FSR Availability Ok Ali Alomran 4750949 Day Shift Helper
FSR Certification Ok Mohamed Ismail 5881016 Night Shift Operator
___
Iron Requirments Abdullah Bdress 5241693 Night Shift Helper
___
Expired Iron Day Operator OFF
___
Leaking Iron Night Operator OFF
___
Extra Iron Day Helper Off
Iron Certification List Inventory Ok Night Helper Off
SCBA Certified Ok Unit Type CPF-377
H2S Monitor available and certified Ok Unit FAN CPF-37709A0131
Plastic Chains below POP OFF valve Ok Front Engine Hour Meter 1431
Locks and the Key with WSC Ok Rear Engine Hour Meter 1439
Tags on Pop Off Ok Unit Condition
Quest and Passport Certification All crew Ok

Laptop Condition Ok

LP Connections conditions Ok

LP Hoses condition Ok

Laptop Asset No Ok

Grounding for all Equipment Ok

Fire extingesher covered and certified Ok

Power Inverter Ok

USB to serial converter N/A

Seals availability Ok

O-Rings availability Ok

Pipe Jack Ok Comments


Valve Bar Ok

Grease Gun Ok

High Pressure Grease Ok

Hammers Ok

Zero spills under the unit Ok

Frac Tank STEM Ok Frac Tank Asset Number SSF-51111F1059

C-Pump STEM Ok C-Pump Asset Number SUS23516Y0113


STEM Pre Job Ok Batch Mixer Asset Number
STEM Post Job Ok Laptop Asset Number 1008037
Maximum Wellhead Pressure & Tubing Pressure 9500 psi Additional Information
Mixing Caluclation N/A

ST 5 Compliance Ok Volume in Frac Tank 10 BBL


Barrier Tape Warning signs and Grounding Ok Fluid in Frac Tank Brine
OPSD ( Over Pressure ShutDown ) 9600 psi Last Pressure in TCA 4500 psi

Prime up procedures followed Ok Last Pressure in Tubing 7500 psi


Pressure Testing procedures followed Ok

Spill & Secondary containment available Ok

Recording ( Flow Rate & Pressure & K-Factor ) Ok

Equipment Rigdown sequence known Ok

Equipment stored securely Ok

Operator Signature Mohamed Ismail. Site Coordinator Signature