0% found this document useful (0 votes)
79 views13 pages

Trinidad Gas Pipeline Projects 2010

The document discusses natural gas demand growth and infrastructure projects in Trinidad and Tobago. It forecasts increased demand from new metals plants, more power generation needs, and expansion of existing plants. New gas fields and industrial estates are being developed. It provides details on the network of gas pipelines, ongoing projects like the North-East Offshore pipeline and Tobago pipeline, and local content levels for those projects.

Uploaded by

Michael Rush
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views13 pages

Trinidad Gas Pipeline Projects 2010

The document discusses natural gas demand growth and infrastructure projects in Trinidad and Tobago. It forecasts increased demand from new metals plants, more power generation needs, and expansion of existing plants. New gas fields and industrial estates are being developed. It provides details on the network of gas pipelines, ongoing projects like the North-East Offshore pipeline and Tobago pipeline, and local content levels for those projects.

Uploaded by

Michael Rush
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Natural Gas Demand Growth

• Forecasted demand growth


– Start up of new Metals plants
Update
U d t on – I
Increasedd power generation
ti requirements
i t
– Debottlenecking of existing plants
Pipeline and Infrastructure Projects – Increase in LIC Sector & CNG expansion
• New Gas fields being developed
– BHP Billiton
• N
New E
Estate
t t development
d l t
Trinidad and Tobago Petroleum Conference
– Union Industrial Estate
25th-26th January 2010
Presented by:
– Tamana EnTech Park
Wade Hamilton – – Cove Industrial Estate
Vice president Technical Services

Network Pipeline Network


Network Gas Pipelines Total of 799 Km
Transmission Capacity of 4.4 Bcf/d
– Offshore Transmission Gas Pipelines 198 Km
– Onshore Transmission Pipelines 360 Km

– Large Diameter Distribution Pipelines 155 Km

– Small
S ll Di
Diameter
t DiDistribution
t ib ti PiPipeline
li 65 K
Km

– New gas pipeline additions @ end of 2010 177 Km


Major Ongoing Projects
• North-East Offshore (NEO) Transmission Pipeline
• T
Transmission
i i Pi Pipeline
li tto C
Cove EEstate,
t t TTobago
b
• Distribution Pipeline to Union Industrial Estate
• Liquid Fuels Pipeline Network
• Distribution Pipeline to Tamana In-Tech
In Tech Park
• Expansion of the Distribution System North East Offshore Pipeline
(NEO)

NEO Project Overview NEO Progress


• The Project Key Data
– The construction of 36 inch offshore Capacity 1000 mmscfd
pipeline from the BHP Billiton field to Length 94 km
th 36 iinch
the hB
Budd Off
Offshore
h pipeline
i li Diameter 36-inch
• Project Drivers Capex US$ 350 Million
– Open access to new field where there Completion Date
is no gas pipeline infrastructure
– Opportunity to develop other marginal
fields as it lowers the infrastructure
development cost for other players
players.
– New source of gas from BHP for
Domestic market

HDD Shore Approach Mayaro HDD Mayaro


NEO Progress

Tobago Pipeline Project


Mayaro Bay Regulator Station Abyssinia Facility

Tobago Pipeline Project Overview Tobago Pipeline Progress


• The Project Key Data
Capacity 110-120 mmscfd
– The construction of a 12 inch
Length 54 km
diameter line from BHP Billiton
Diameter 12-inch
field to Cove Estate Tobago
Capex US$ 164 Million
• Project Drivers Completion Date
– Gas
G Supply
S l to
t Power
P
Generation Plant at Cove.
– Gas Supply to Light Industry at
Cove
Pipeline Shore Approach HDD Tobago
– Transportation of gas for Tobago
Eastern Caribbean Gas
Pipeline Co.
HDD Tobago Completion
– Domestic supply to Tobago
Tobago Pipeline Progress Tobago Pipeline Progress

Pipelay BargeTobago Pipelay Supply Barge


Pi b
Pipe being
i L Lowered
d iinto
t th
the W
Water
t Pi b
Pipe being
i L Lowered
d iinto
t th
the W
Water
t

Tobago
g Gas Processing
g Facility
y Tobago Gas Processing Facility
– Plant Capacity
– Single
Si l ttrain
i
• min. 15 mmscfd
• max.
max 100 mmscfd
– Metering system
Tobago Gas Processing Facility Progress

Building Firewater
Control & MCC
Foundation Works
At
Cove Estate

Odorization Building Tank Bases


Foundation

Tobago Gas Processing Facility Progress Concrete Coating Process at la Brea


NEO/Tobago Local Content Project Overview Cove Estate

Total local Content 18% „ Tobago Receiving/Metering Station


> Cove Industrial Estate, Tobago
> Processing Capacity: 100MMSCFD
Service Type Contractor „ Tobago Pipeline BHPB

Civil works Carillion > Start: BHPB Gas Export Platform, Offshore Platform

> Ends: Cove Industrial Estate, Tobago


Mechanical API > 54km
54k long
l
> Water depth: 34-92m
Sub-sea Geotechnical/Geophysical Capital Signal > Size: 12”
Horizontal Directional Drilling Support OTSL
„ North East Offshore (NEO) Pipeline
Concrete Coating Bredero Shaw/TCL > Start: BHPB Gas Export Platform, Offshore
> Ends: New Abyssinia, Trinidad
Pressure Vessels Mustapha Engineering Works > 94km long
> Water depth: 12m-62m
> Size: 36”

Overall Project Status


Tobago
Engineering Design 100%
Civil Works Facility 65%
HDD Installation of 12 inch pipe 100%
O
Overall
ll 60%

NEO
Engineering Design 100%
HDD Installation of 36 inch pipe 65%
9 kkm off onshore
h 36” pipeline
i li 0%
Overall 60%
Project Overview
• New Supply to Union and LABIDCO Estates
– C
Construction
t ti off 11 kkm 24 inch
i h di
diameter
t spur pipeline,
i li IInlet
l t
Receiving Station , metering and regulation station to deliver 250
mmscfd
– Construction of 2 km low pressure HDPE distribution pipeline for
tenants in the Labidco estate
– Capex US$ 42 million

Distribution Pipeline to Union


& Labidco Industrial Estates

Union Estate Union Estate


• Current Status • Construction Feb 2010
– Pipeline Contract awarded API Pipeline Company
• Engineering Design Completed – Civil works contract pending award Jan 2010
• Universal Pegasus Enesco
– Mechanical Works to Tender Feb 2010
– EIA Contractor REAL - CEC awarded
• Expected First Gas Commissioning to
– Material procurement May 08 – Aug 09 Estate Julyy 1st 2010
• Pipe contract for 24 Inch & 16 Inch - Tubecero
Mexico
Photos of Union & Labidco

Liquid Fuels Pipeline Network


Map Showing Union & Labidco Estates ROWs being cleared at Union Estate

Liquid
q Fuel Pipeline
p Network Project
j
ƒ Construct an 8“ Steel Multiproduct Pipeline from PAP to
Caroni ((35km Long)g) to transport
p two ((2)) g
grades of
gasoline (95 Octane; 92 Octane) Diesel Fuel & Jet Fuel.
ƒ Construct a new state of the art Road Tank Wagon
Loading Facility at eTecK’s
eTecK s Industrial Estate at Caroni
Caroni.
ƒ Construct a dedicated Jet Fuel Pipeline (11 km Long)
from Caroni to Piarco Airport
ƒ Capex US$ 115 Million
ƒ Target Completion Q4 2010
Liquid Fuel Pipeline Route LA
Liquid Fuel Pipeline

USE
Curucaye
ST.
AUD

ROAD
REY

CLAIR

ROAD
New

ROAD
BELMONT
JEFFE

Town No. 1007

L
ROYA
Mucurapo WOODBROOK No. 1035 229.9

RIV
RS

ROAD

ER
CITY OF SIDE 269.3

CAURA
ST. JOSEPH
PORT OF
HIGHWAY GONZALES
No. 1006
SAN Mount D'or
RD. TUNAPUNA
JUAN MOUNT
COUNTY OF ST GEORGE
ST.
WR

SPAIN 173.7 BARATARIA


Malick Champs
IGH

HOPE Fleurs Paradise


East Dry Petit Bourg

T
TSO

INO
River LAVENTILLE Morvant EASTERN MAIN ROAD
No. 19

LOP
N

Ann's CUREPE Auzonville


St. Joseph & 164.9
MOUNT LAMBERT Port of Spain Tunapuna
ROAD TACARIGUA
St.
BEETHAM H/WAY VALSAYN PARK
ST. AUGUSTINE EL DORADO
CHUR DINSLEY
CHHIL EAS
L TER LA ARIMA
HIGHWAY N
El Socorro
ROOSEVELT FLORISSANTE
Real MAIN
Spring
Aranjuez
AROUCA MALABAR
D'ABADIE
PROPOSED FREDERICK SETTLEMENT

ROA
SETTLEMENT INDUSTRIAL D

D
ROA MALONEY

BUTL
LAVENTILLE Lapai
Caroni Village
ESTATE CHURCHILL 92.0
108.0

ER
SWAMP

GROVE
• Replacement of existing antiquated loading facilities at
Frederick GOLDEN
Village
GROVE

ROAD
CARONI LA

GOLDEN
HIGHWA
CAR

MAUSICA
ONI HORQUETTA
CARONI SWAMP
PIARCO

ROA
RESERVE INTERNATIONAL AIRPORT
ROAD Carapo

D
No. 1019 CARONI
CUNUPIA NORTH CARAPO

BAN
WARD OF 26.4
RD.

K
Piarco Village Carapo

ROAD
Centeno
Kelly Village
COUNTY OF CARONI Warren

ROAD
MON
PROPOSED END

Sea Lots and PAP with new state of the art facilities.
facilities
WARREN

Warner's
PLAISIR
POINT AT PIARCO
St. Helena

RD.
BEJUCAL ROAD BEJUCA
ROAD ROAD

MUNROE ROAD GILLIS ONI


MUNROE ROAD CAR
CA
Aripo Point Chin Chin Village
Nancoo
10.0 Savanna Village
CUNUPIA

URIAH

D
ROA
25.0 Madras Settlement

CARONI
JERNINGHAM JUNCTION

BUTLER
5.5 CHIN CHIN
ROAD
ESMERALDA

OUR
ROAD

SAVANNAH
406 Ø (16")

EAV
8.5 17.5 LAS LOMAS
ROA

SOUTHERN
END
6.0 D
13.0 MACNAIR

• Increased security of supply from either of two (2)


Felicity RAVINE

HIGHWAY
CHA SABLE

ROAD
RAGOONANAN ROAD
GUA
6.0 NAS
Monstrose
MAIN 24.0

St. Thomas
Chaguanas
ENTERPRISE
COUNTY OF CARONI
RO
AD
LONGDENVILLE
8.5
Longdenville MONTROSE

)
Baarrancones Point

0"
Chaguanas FOREST
FOREST RESERVE
WARD OF 68.0

(1
2.0 Cumberbatch RESERVE
LONGDENVILLE

Ø
TODD'S ROAD

SOLOMON
CHAGUANAS
NORTH

4
FOREST
RAVINE SABLE

25
RESERVE

loading
g facilities at Caroni or Sea Lots.
ROA

AD
18.0

CAP
D

RO
4.0
34.0

HOCHOY
BARRANCONES 9.0 62.0

ARO
Brickfield WARD OF
BAY
CHAGUANAS STATION
26.0
Agostini
Palmiste

VALL
Coryal Chandernagore

HIGHWAY
TODD'S TODD'S ROAD
14.0

EY
Wyaby Todd's SOUTH
F.R.
Butler BRASSO Road
No. 1018 Carapichaima
3.7 332.5

D
Waterloo Chase Callsen

ROA

OAD
Field 43.0

RO
MAIN
N
14.0 FREEPORT
WAT

MISSION

port
S
ERL

TODD'

Free
RN FOREST RESERVE
OO

WARD OF ROA THE


D SOU ORT

ROA
H FREEP

D
5.0 8.0 COUVA 60.0 ARO
ETC Freeport
Orange Valley 19.0 ROAD No. 319 CAP
STR

• Reduced Road Tank Wagon traffic on the highways.


ARENA 41.5
N
LAND Caparo

LA
BEA CUE 77.0 CHICK
MC STA
Free RD WARD OF MONTSERRAT Mamoral
y
Mar

Couva port
St.

ROAD Mamoral
FRE 75.5 88.0
Cascajal Point 2.0 Felicity MC BEAN MAMORAL
27. 0 EPO
Hall Upper 55.0
RT
Carapichaima 37.0
ROAD

HIGHWAY

9.0 No.1 82. 48.0


Brasso
ROAD

52.5
AD

RD. Piedra
RO

SSO
18.0 Jiatoo

BRA
No. 1857 CALCUTTER San Francisco Flanagin
WATERLOO

WARD OF
MAIN

1 Settlement Town
24.
86.0
Chickland EY
SOUTHERN

VALL

ent
25.5

tlem
COUVA MONTSERRAT
Set

CARONI
co

ST. Andrew
COUNTY OF
ncis

14.0 Exchange Balmain 59.0


Spring 81.0 D
Fra

ARO
l STATION
Cangrejos Point ROA
San

ysa

CAP
MAIN Pre

• Elimination of emissions from loading facilities.


Couva 6.0
Brasso
ROAD Preysal
OR RIVULET ROAD

SSO
CANGREJOS BAY

BRA
41.0 n
WARD OF COUVA

D
California Balma I

ROA
Gran Pepper a
Savonetta Point in A t
Gran Couva Village n
Basterhall Couva COUV u
12.5 RIV o
2.0 RAILWAY ROA
Dow ROAD ULE M
No . 321 D
T
ROAD INDIAN TRA ROAD
141.5
8.0 IL g
Monkey Point n
Ouplay o
PHOENIX PARK 1040
Carolina Indian RD. WARD OF MONTERRAT L

BRASSO
No.

AD
Chain COR No. 43
INDIA

89.0 Gordon

RO
VALVE STATION Gordon ROAD
O

Settlem OSA 205.1 CARRY


MAY

ent Settlement
N

PHOENIX TRA L s Tabaquite


a t H i l l
WARD IL r
SOU

Phoenix Park RD. t s e


OUTHERN

n
M o BAQUITE
TABAQUIT
Friendship PARK ROAD

ROAD
Guaracara
254 Juntion
GUARACARA

Point Lisas
Ø (10 DIAMO OF CARONI TAB

") AQU
RD.

ND Spring
SOLOMON

ITE
NT
D

• Phased-out, expensive marine and Jet Fuel handling


ROAD

Vale 73.0
ROA

ASA CED Tortuga


ITE
MAY

3.0 16.0 Diamond PLE Tortuga


AR D
L

ROAD
HIL

ROA 198.0 AQU


HILL
O
MT.

TAB
L

ROA
HIL

AR

ROAD
CED

CLAXTON AR Morichal
CED FOR
BAY AD
CLAXTON RO RES
BAY

ARO
SOLEDAD
No.

PIP
1044
Mayo
130.2
RD.

WARD

River
PIERRE
MAIN

ROAD OF POINTE -A-


AGE 32.0
MIT
HER
ROAD

WARD OF Blue Basin

St. Margaret

ARA
Piparo

from PAP.
ROAD Centre Hill
POINTE - A - PIERRE
BONNE PIP GUARAC
Bonne
AVENTURE Rive
PETROTRIN RECEIVER Aventure
ARO
D
KELLY ROA PASCUAL r
ROAD

STATION JUNCTION
ro
O
ARILL

Pipa
R
GASP

La Eckel Vile
TABAQUITE

Carriere
SISTERS
ROAD

ROAD
Gasparillo Busy Corner
e Bonne
HOY

Terre
svill ARA WILLIAMSVILLE
iam Hardbargain

ITE
HOC

RAC
San Fernando Will

AQU
GUA
GUARACARA D

TAB
TABAQU ROA
ITE
Marabella
Hill

Union Reform
WARD OF ial
Cor
RD.

Haswaron TORRIB
SAVANA
LOMON

TAROUBA Marabella GRANDE Jackson


Hill
SOL

BAY
Mount
Mount
San Stewart
Fernando Stewart NAPARIMA
Prince
ROAD s Town Iere
Spring Vistabela Tarouba WARD
Vale
ARO NEW GRANT
MAY

St. Joseph MAY MAYARO


Pique A
ARO

La Buen
BONTOUR ARIM Palmyra George
BAY No. 92 Mon Repos Intento Village
178.6 NAP
Tarouba
PASS

ROA

ROAD
PRINCES Indian
IMA
LADY

Farallon
D

Walk Robert
BY

NAPAR
DO

Rock Ste. Madeleine TOWN Hindustan


St. Julien
NAN
HAILES

PLEASANTVILLE ROAD
MANAHAMB
FER

Coffee 87.8 MATI DUNMORE No. 1024


10 ° 16' 25.9" RD. RE Craignish LDA Hill 120.1
Latitude
SAN

AVENUE Manahambre Village ROAD


508 Ø (20")

Longitude 61 ° 29' 11" Sainte


INTH RE Croix Sixth
Palmiste No. 1023 Company
COR RO HAMB 89.6
n
ALLYS AD MANA
Victoria Tow
CREEK
MOR

ces
San
CIPE

ROAD Golconda Fernando Prin Woodlands Lothian WARD


UGA

TRUNK Lengua
RO

TH ROAD Woodlands
Duncan
SOU MAIN Third
ROA

Canaan Company
ROAD

La St. John
D

Romain St. John WARD


Cipero Croix
Ste. CIPER

CREE
K
SOUTHERN
COUNTY OF Esperance
VICTORIA O
Fourth
914Ø(36")
PAPOUR

Company
O PLAISANCE RD.
E

ROAD

QUIT ROAD
PHILLIPIN

CON Rambert
IX

MOS
CRO

COR
Diamond
E

D Fifth
OF
ST.E

ROAD Company
Concord
DUM

FREEMANS Hermitage Cipero


A

Ste. Croix
FRI

BAY
OND
ROAD
ES

OTAHEITE BAY
GODINEAU
GOLC

SWAMP
STE
ROA

FORREST
R
ROAD
COUNTY

Carbon Footprint Reduction Liquid Fuel Pipeline Network Project


• Engineering Contact awarded to KBR
– Engineering
g g Design
g 100% completed
The benefit of the project is that the pipeline will – Procurement being handled by KBR 90% completed
eliminate the use of Road tanker wagon for • Pipe Supply - Ansa Technologies 100% completed
transportation of jet fuel as well as the elimination of the • Control
C Building & Utilities Engineering – LeeYoung &
use of the Ship for transportation of products to SeaLots Partners 98% completed
• Pipeline Construction completed
Carbon Reduction - 3.5 million tonnes/yr • Main Mechanical works to be awarded Q1 2010
• Expected Commissioning latter part Q4 2010
Local Content Project Progress Pictures
• Overall Local Content Value approx. 37% Pipeline Construction
Environmental Kaizen Trinidad Ltd
Building & Utilities Lee Young & Partners
Site prep Namalco
Pipeline from PAP to Pierre Fecility Rd South M Contractors Ltd-

Pipeline from Pierre Rd to Caroni and Caroni to Trinweld Contractors Ltd


Piarco
Tanks Foundations Jagmohan
g
Main Product Storage tanks- Damus

Site Inspectors & Project management Service Trinidad Project Management Services

In PAP - Product Tanks Chicago Bridge Iron Works (CBI)

HDD Along the Route Aerial View of Pipelay


Along the Route
Site Preparation At Caroni The Caroni Facility

Expansion of Distribution System


Tamana InTech Park Tamana InTech Park Progress
– Construction of 3 km 6
inch supply line and 10
k off 6 inch
km i h llow pressure
distribution network within
the Estate.
– Contractor API
– Commissioning Feb 2010

eTech Tamina Park Progress New Projects 2010 -2013


• Aggressive Development programme for
LIC sector
– Diego Martin pipeline extension
– CNG EExpansion
i PProgramme
– Gas to Secondary Schools
– Promotion of Gas Cooling
Distribution System Expansion
• eTeck Diamond Vale
Industrial Estate
– Construction of 6 km of
pp
6 in diameter pipeline
from Westmoorings to
Diamond Vale
– CEC Awarded
– Construction to
commence Q2 2010

Reforestation
NGC’s
NGC s “No
No Net Loss”
Loss Principle
• Additionally, NGC has adopted a “No Net
Loss” Principle with regard to forest
Loss
removal.
• NGC h has committed
itt d tto replant
l t 315 h
ha off
critically degraded forest areas
• In 2009 38 ha was replanted bringing us to
a total of 88 ha to date
52

You might also like