Clinker Cost estimation analysis v/s C3s for kiln Line I
1 % decrease in limestone = decrease 6.04 Kcal/kg-cli
total pile capacity 10000 ton
coal NCV 5700 Kcal/kg-coal
total production 1850 tons
total coal consumed 420 tons
Total Kcal/kg-cli. 1294.05 kcal/kg-cli
Heat of formation 408.00 Kcal/kg-cli.
coal equivalent to HOF 132.42 tons
= 31.53 % of total coal
Out of 420 ton of T.coal cosumed effective coal for HOF 132.42 TONS
After decrease 6 kcal/kg of HOF effective coal is 130.47 TONS
Total coal required for 131.77 ton effective coal 413.82 tons
Diff. in total coal consumed 6.18 tons
Rate of i ton of coal 14000 PKR
Price of coal saved 86470.59 rupees per day
12% Additives used in cement mill
cement mill feed 70 TPH 1680 TPD rate/ton rupees
Additives 12 %
% of Gypsum 3.5 % 58.80 2057 120951.60
Pozzolona 2.83 47.54 1650 78447.60
GGBS 2.83 47.54 1720 81775.68
HSLS 2.83 47.54 270 12836.88
Fly Ash 30.00 450 13500.00
CLINKER 61.6 1034.88 307511.76
12% CLINKER SAVED 8.4 TONS 201.6 total 4200 846720.00
Difference of saving between clinker and additives 539208.24 rupees per day
Summary
By decreasing 6% C3S we can save 86470.59 Rupees/day
By using additives to save 12% clinker 539208.24 Rupees/day
Diff. of C3S 452737.65 Rupees/day
Clinker Cost estimation analysis V/S C3s for kiln Line II
1 % decrease in limestone = decrease 6.04 Kcal/kg-cli
coal NCV 5700 Kcal/kg-coal
total production 2850 tons
total coal consumed 480.00 tons
Total Kcal/kg-cli. 960.00 kcal/kg-cli
Heat of formation 412.56 Kcal/kg-cli.
coal equivalent to HOF 206.28 tons
= 42.98 % of total coal
Out of 480 ton of T.coal cosumed effective coal for HOF 206.00 tons
After decrease 6 kcal/kg of HOF effective coal is 203.00 tons
Total coal required for 203 ton effective coal 472.37 tons
Diff. in total coal consumed 7.63 tons
Rate of 1 ton of coal 14000.00 PKR
Price of coal saved 106852.82 rupees per day
12% Additives used in cement mill
cement mill feed 70 TPH 1680 TPD rate/ton rupees
Additives 12 %
% of Gypsum 3.5 % 58.80 2057 120951.60
Pozzolona 2.83 47.54 1650 78447.60
GGBS 2.83 47.54 1720 81775.68
HSLS 2.83 47.54 270 12836.88
Fly Ash 30.00 450 13500.00
CLINKER 61.6 1035 307511.76
12% CLINKER SAVED 8.4 TONS 201.6 Total 3800 766080
Difference of saving between clinker and additives 458568.24 rupees per day
Summary
By decreasing 6% C3S we can save 106852.82 Rupees/day
By using additives to save 12% clinker 458568.24 Rupees/day
Diff. of C3s 351715.42 Rupees/day