Cost of Klinker Against C3S

The document compares the cost savings from decreasing C3S content versus using additives in two cement kiln lines. For kiln line I, decreasing C3S by 6% saves 86470.59 rupees per day, while using 12% additives saves 539208.24 rupees per day, a difference of 452737.65 rupees. For kiln line II, decreasing C3S saves 106852.82 rupees, additives save 458568.24 rupees, a difference of 351715.42 rupees. Using additives provides greater cost savings compared to decreasing C3S alone for both kiln lines.

Uploaded by

Irfan Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
905 views2 pages

Cost of Klinker Against C3S

The document compares the cost savings from decreasing C3S content versus using additives in two cement kiln lines. For kiln line I, decreasing C3S by 6% saves 86470.59 rupees per day, while using 12% additives saves 539208.24 rupees per day, a difference of 452737.65 rupees. For kiln line II, decreasing C3S saves 106852.82 rupees, additives save 458568.24 rupees, a difference of 351715.42 rupees. Using additives provides greater cost savings compared to decreasing C3S alone for both kiln lines.

Uploaded by

Irfan Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Clinker Cost estimation analysis v/s C3s for kiln Line I

1 % decrease in limestone = decrease 6.04 Kcal/kg-cli

total pile capacity 10000 ton

coal NCV 5700 Kcal/kg-coal

total production 1850 tons

total coal consumed 420 tons

Total Kcal/kg-cli. 1294.05 kcal/kg-cli

Heat of formation 408.00 Kcal/kg-cli.

coal equivalent to HOF 132.42 tons

= 31.53 % of total coal

Out of 420 ton of T.coal cosumed effective coal for HOF 132.42 TONS

After decrease 6 kcal/kg of HOF effective coal is 130.47 TONS

Total coal required for 131.77 ton effective coal 413.82 tons

Diff. in total coal consumed 6.18 tons

Rate of i ton of coal 14000 PKR

Price of coal saved 86470.59 rupees per day

12% Additives used in cement mill

cement mill feed 70 TPH 1680 TPD rate/ton rupees

Additives 12 %

% of Gypsum 3.5 % 58.80 2057 120951.60

Pozzolona 2.83 47.54 1650 78447.60

GGBS 2.83 47.54 1720 81775.68

HSLS 2.83 47.54 270 12836.88

Fly Ash 30.00 450 13500.00

CLINKER 61.6 1034.88 307511.76

12% CLINKER SAVED 8.4 TONS 201.6 total 4200 846720.00

Difference of saving between clinker and additives 539208.24 rupees per day

Summary

By decreasing 6% C3S we can save 86470.59 Rupees/day

By using additives to save 12% clinker 539208.24 Rupees/day

Diff. of C3S 452737.65 Rupees/day


Clinker Cost estimation analysis V/S C3s for kiln Line II
1 % decrease in limestone = decrease 6.04 Kcal/kg-cli

coal NCV 5700 Kcal/kg-coal

total production 2850 tons

total coal consumed 480.00 tons

Total Kcal/kg-cli. 960.00 kcal/kg-cli

Heat of formation 412.56 Kcal/kg-cli.

coal equivalent to HOF 206.28 tons

= 42.98 % of total coal

Out of 480 ton of T.coal cosumed effective coal for HOF 206.00 tons

After decrease 6 kcal/kg of HOF effective coal is 203.00 tons

Total coal required for 203 ton effective coal 472.37 tons

Diff. in total coal consumed 7.63 tons

Rate of 1 ton of coal 14000.00 PKR

Price of coal saved 106852.82 rupees per day

12% Additives used in cement mill

cement mill feed 70 TPH 1680 TPD rate/ton rupees

Additives 12 %

% of Gypsum 3.5 % 58.80 2057 120951.60

Pozzolona 2.83 47.54 1650 78447.60

GGBS 2.83 47.54 1720 81775.68

HSLS 2.83 47.54 270 12836.88

Fly Ash 30.00 450 13500.00

CLINKER 61.6 1035 307511.76

12% CLINKER SAVED 8.4 TONS 201.6 Total 3800 766080

Difference of saving between clinker and additives 458568.24 rupees per day

Summary

By decreasing 6% C3S we can save 106852.82 Rupees/day

By using additives to save 12% clinker 458568.24 Rupees/day

Diff. of C3s 351715.42 Rupees/day