CT Parameter Calculation Guide
CT Parameter Calculation Guide
  Voltage at + 5%                                                                                             19.95
  FL current at +5% of rated Voltage=                                                                        8682.2
  (Considering 100 m of 2.5 sq.mm Cu cond. cable between busduct CT &                                          8.87
  GRP the resistance of 2.5 sq.mm Cu cond cable at 70oC in W / km (from
  KEI catalogue)
  Fault Current in KA Taking higher value of the fault contribution from i.e.                                108.52
  fault contribution from system / fault contribution from gen
Vk = 20RCT + 37
Im  15 mA at Vk/2
                                                                                                                               Page 1 of 20
   CT with group-1/group-2 protection
= VK  40 RCT+200V
CT ratio 600/1A
CLPS , VK  40 RCT+200V
Im  30 mA at VK/2
                                                                                                                           Page 2 of 20
      iii) Core –3 (metering)
           600/1A
           Typical Meter burden in ohm (from catalogue of Conzerv model)                                             0.4
           Typical Anolgue Meter burden in ohm (from catalogue of AE/Rishab) &                                       4.5 Total 5Nos
           Transducer                                                                                                    Analogue meter
                                                                                                                         connected & max
                                                                                                                         4 nos of
                                                                                                                         transducer per CT
         Max. Burden margin Consider for future use                                                                     2
         Total Burden on CT = Lead Burden+ Meter Burden
                                                  2                                                   =Sqr(1)*(Rct+2Rl)
         Lead Burden for lead length of 270M= I x(Rct+2RL)
                                                                                                             =Rct+4.79
         Rct Assumed for CT Sec.1A is 6 ohm for 600/1Amp                                                          10.79
         Total Burden on CT = Lead Burden+ Meter Burden+burden margin                                            17.69
         Consider for future use
         20 VA, CL-0.2                                                              20 VA arrived at considering all the
                                                                                    meter connected
v) Core –5
VK  40 RCT + 150V
Im  15 mA at VK/2
A GT Bushing CTs
         % Impedence of GT is                                                                                   14.50%
         GT full load current on HV side =                                          Considering SPAE 10 relay with
         512.40                                                                     Setting relay burden =5.4 VA
Considering the Source impedance based on 40kA, max. earth fault current
         3457.15
          = 3607.70 as GT impedance Zt = 14.5%
                                                                                                                                Page 3 of 20
      
CT parameters chosen
CT ratio 600/1A
ii) Core - 2 Neutral CT-GT inverse time ground O/C relay (51NGT)
Base-MVA 355
      System contribution
      = Base MVA / (Zspu+Zgt)                                                                          2499.49
= 2499.49 MVA
                                                                                                                  Page 4 of 20
        Total fault MVA(Contribution from Generator & GT system) =                                                6701.17
        3252.91+2499.49
                                   = 5752.40 MVA
        However the ratio of rated burden of CT & the connected burden is about     Vdesin=BurdenxALF/CT Secondary
        10 times. Therefore the voltage, developed by the CT (200V) will be
        increased by that ratio, therefore the CT does not saturate and hence CT
        chosen is ok.
CT chosen – 800/1A
        10VA, CL 5P20
        Typical Relay burden in ohm (from ABB catlogue)                                                                0.1
        Total Burden on CT = Lead Burden+ Relay Burden
                                                2                                   =Sqr(1)*(Rct+2Rl)
        Lead Burden for lead length of 125M= I x(Rct+2RL)
                                                                                    =Rct+2.2175
        Rct Assumed for CT Sec.1A is 7 ohm for 600/1Amp                                                             9.2175
        Total Burden on CT = Lead Burden+ Meter Burden+burden margin                                                9.3175
        Consider for future use
        10 VA, CL-5P20                                                              As relay used is Numerical type,
                                                                                    hence 10 VA considered is more
                                                                                    than Sufficient.
        Current on 20 kV side =
        577.35
VK >40RCT+92.7
VK  40RCT+92.7V 2x8.87x100/1000
Im  15mA AT VK/2
        Total running load in KVA on the 6.6 kV bus ( higher of the two buses U1A                                   18451
        and U1B taken from UAT sizing calculation)
        Total running load in Amp on the 6.6 kV bus ( higher of the two buses U1A                                  1614.04
        and U1B taken from UAT sizing calculation)
        
        2 RL = 2 x 8.87 x 0.1 (1 run 2.5 mm2 cable / phase, L = 100 meters)   =                                      1.774
        2.661W
                                                                                                                             Page 5 of 20
       VK selected is  40RCT+80V
Im  15 mA at Vk/2
VK = 9.21x(Rct+2x0.887+0.1)
v)     51 N – UAT- LV.
       Earth Fault current to be restricted to 300Amp.
       For neutral CT to be located in NGR.
       300/1A, 15VA, CL 5P20
           100
                                                                         
        100 X 100
D ST LV side CTs
i)     Core –1 ( metering)
       Total running load in KVA on the 6.6 kV bus ( higher of the two buses C1A                                 22292
       and C1B taken from ST sizing calculation)
                                                                                                                          Page 6 of 20
                   Total running load in Amp on the 6.6 kV bus ( higher of the two buses C1A                                1950.04
                   and C1B taken from ST sizing calculation)
                   
25 MVA , 220/6.9 KV
                   2 RL = 2 x 8.87 x 0.20 (1 run 2.5 mm2 cable / phase, L = 250 meters) =                                     4.435
                   4.435W
Vk = 10.29x(Rct+4.435+0.1) 46.67
                   = 11RCT+46.67 V
                   i.e. CTR chosen - 2500/1A, 11RCT+50V, Im  15mA at Vk/2
                   2 RL = 2 x 8.87 x 0.15 (1 run 2.5 mm2 cable / phase, L = 250 meters)     =                                 4.435
                   2.661W
                                                                                                                                       Page 7 of 20
VK = 40x1(RCT + 4.435 + 0.1) = 40RCT+181.4
VK selected is  40RCT+200V
Im  15 mA at Vk/2
0
X
%
1
2
1
I
R
1
1
M
9
5
 1
 K
40
 0
  .
  0
  8
  1
  1
  0
  0
  4
  2
   1
   .
    2
    2
    Z
    0
    2
    V
    
    0
    3
    0
    V
    .
    4
     2
     0
      5
      1
       X
       x
       x
       R
       x
       A
       8
        2
        6
        1
        x
         1
         x
         1
         1
           0
            6
            0
            
            
            1
          . 6
             x
             2
              3
              3
              2                              
                                             0
                                              1
                                               . 5
                                                 .
                                                   9
                                                   6
                                                       4
                                                           Page 8 of 20
                                                     CT sizing for 6.6 kV System
                                                                                                                                                 Page 9 of 20
       10 VA, CL5P20                                                                 As relay used is numerical(SPAJ-140C) type,
                                                                                     hence 10 VA considered is more than
                                                                                     Sufficient also Lead burden is less than
                                                                                     above assumed buden as relay & Ct are at
                                                                                     the same Switchgear.
iii.   For Metering Core
       Typical Meter burden in ohm (from catalogue of                                                                         0.2
       Conzerv model)
       Typical Anolgue Meter burden in ohm (from                                                                                  1
       catalogue of AE/Rishab) & Transducer
       Burden margin Consider for future use                                                                                      2
       Total Burden on CT = Lead Burden+ Meter Burden
                                               2                                     =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                                     =Rct+0.7096
       Rct Assumed for CT Sec.1A is 6 ohm for 750/1Amp                                                                   6.7096
       Total Burden on CT = Lead Burden+ Meter                                                                           9.9096
       Burden+burden margin Consider for future use
       10 VA, CL-0.5                                                                 As meter used is Multifunction type, hence
                                                                                     10 VA considered is more than Sufficient
                                                                                     also Lead burden is less than above
                                                                                     assumed buden as Meter & CT are at the
                                                                                     same Switchgear. Also Rct is max typical
                                                                                     value for 750Amp Primary
                                                                                                                                      Page 10 of 20
       Rct Assumed for CT Sec.1A is <=4 ohm                                                                                 6.7096
       Total Burden on CT = Lead Burden+ Relay Burden                                                                       6.7096
       10 VA, CL5P20                                                                 As relay used is numerical(SPAJ-140C) type,
                                                                                     hence 10 VA considered is more than
                                                                                     Sufficient also Lead burden is less than
                                                                                     above assumed buden as relay & Ct are at
                                                                                     the same Switchgear.
ii.    For Metering Core
       Typical Meter burden in ohm (from catalogue of                                                                         0.2
       Conzerv model)
       Typical Anolgue Meter burden in ohm (from                                                                                   1
       catalogue of AE/Rishab) & Transducer
       Burden margin Consider for future use                                                                                       2
       Total Burden on CT = Lead Burden+ Meter Burden
                                               2                                     =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                                     =Rct+0.7096
       Rct Assumed for CT Sec.1A is 4 ohm for 100/1Amp                                                                   4.7096
       Total Burden on CT = Lead Burden+ Meter                                                                           7.9096
       Burden+burden margin Consider for future use
       10 VA, CL-0.5                                                                 As meter used is Multifunction type, hence
                                                                                     10 VA considered is more than Sufficient
                                                                                     also Lead burden is less than above
                                                                                     assumed buden as Meter & CT are at the
                                                                                     same Switchgear.
6      Coal Mill-1A, 1B, 1C, 1D, 1E, 1F                      400     43.74   50/1    3C x 185 mm2
i.     For O/C & E/F Protection
       R relay in ohm (from relay catalogue of ABB model                                                                      0.1
       SPAJ)
       Total Burden on CT = Lead Burden+ Relay Burden
       Lead Burden for lead length of 40M= I2x(Rct+2RL)                              =Sqr(1)*(Rct+2Rl)
                                                                                     =Rct+0.7096
                                                                                                                                       Page 11 of 20
       Rct Assumed for CT Sec.1A is <=1 ohm                                                                          1.7096
       Total Burden on CT = Lead Burden+ Relay Burden                                                                1.8096
       10 VA, CL5P20                                                          As relay used is numerical(SPAJ-140C) type,
                                                                              hence 10 VA considered is more than
                                                                              Sufficient also Lead burden is less than
                                                                              above assumed buden as relay & Ct are at
                                                                              the same Switchgear.
ii.    For Metering Core
       Typical Meter burden in ohm (from catalogue of                                                                  0.2
       Conzerv model)
       Typical Anolgue Meter burden in ohm (from                                                                           1
       catalogue of AE/Rishab) & Transducer
       Burden margin Consider for future use                                                                               2
       Total Burden on CT = Lead Burden+ Meter Burden
                                               2                              =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                              =Rct+0.7096
       Rct Assumed for CT Sec.1A is 5 ohm for 50/1Amp                                                             1.7096
       Total Burden on CT = Lead Burden+ Meter                                                                    4.9096
       Burden+burden margin Consider for future use
       10 VA, CL-0.5                                                          As meter used is Multifunction type, hence
                                                                              10 VA considered is more than Sufficient
                                                                              also Lead burden is less than above
                                                                              assumed buden as Meter & CT are at the
                                                                              same Switchgear.
                                                                                                                               Page 12 of 20
      Rct Assumed for CT Sec.1A is <=12 ohm                                                                                 12.7096
      Total Burden on CT = Lead Burden+ Relay Burden                                                                        12.8096
      15 VA, CL5P20                                                                   As relay used is numerical(SPAJ-140C) type,
                                                                                      hence 15 VA considered is more than
                                                                                      Sufficient also Lead burden is less than
                                                                                      above assumed buden as relay & Ct are at
                                                                                      the same Switchgear.
ii.   For Metering Core
      Typical Meter burden in ohm (from catalogue of                                                                            0.2
      Conzerv model)
      Typical Anolgue Meter burden in ohm (from                                                                                    1
      catalogue of AE/Rishab) & Transducer
      Burden margin Consider for future use                                                                                        2
      Total Burden on CT = Lead Burden+ Meter Burden
      Lead Burden for lead length of 40M= I2x(Rct+2RL)                                =Sqr(1)*(Rct+2Rl)
                                                                                      =Rct+0.7096
      Rct Assumed for CT Sec.1A is 12 ohm for                                                                             12.7096
      2000/1Amp
      Total Burden on CT = Lead Burden+ Meter                                                                             15.9096
      Burden+burden margin Consider for future use
      20 VA, CL-0.5                                                                   As meter used is Multifunction type, hence
                                                                                      20 VA considered is more than Sufficient
                                                                                      also Lead burden is less than above
                                                                                      assumed buden as Meter & CT are at the
                                                                                      same Switchgear.
9     Unit Service Transformer-1A & 1B                     2500     219.79   300/1    3C x 240 mm2
i.    For O/C & E/F Protection
      R relay in ohm (from relay catalogue of ABB model                                                                         0.1
      SPAJ)
      Total Burden on CT = Lead Burden+ Relay Burden
      Lead Burden for lead length of 40M= I2x(Rct+2RL)                                =Sqr(1)*(Rct+2Rl)
                                                                                      =Rct+0.7096
      Rct Assumed for CT Sec.1A is <=6 ohm                                                                                   6.7096
      Total Burden on CT = Lead Burden+ Relay Burden                                                                         6.8096
      10 VA, CL5P20                                                                   As relay used is numerical(SPAJ-140C) type,
                                                                                      hence 15 VA considered is more than
                                                                                      Sufficient also Lead burden is less than
                                                                                      above assumed buden as relay & Ct are at
                                                                                      the same Switchgear.
ii.   For Metering Core
      Typical Meter burden in ohm (from catalogue of                                                                            0.2
      Conzerv model)
      Typical Anolgue Meter burden in ohm (from                                                                                    1
      catalogue of AE/Rishab) & Transducer
      Burden margin Consider for future use                                                                                        2
      Total Burden on CT = Lead Burden+ Meter Burden
                                              2                                       =Sqr(1)*(Rct+2Rl)
      Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                                      =Rct+0.7096
      Rct Assumed for CT Sec.1A is 6 ohm for                                                                              6.7096
      2000/1Amp
      Total Burden on CT = Lead Burden+ Meter                                                                             9.9096
      Burden+burden margin Consider for future use
      10 VA, CL-0.5                                                                   As meter used is Multifunction type, hence
                                                                                      10 VA considered is more than Sufficient
                                                                                      also Lead burden is less than above
                                                                                      assumed buden as Meter & CT are at the
                                                                                      same Switchgear.
10    Spare motor feeder on all the Unit-1 buses           5400     590.47   600/1    CT Details same as Feedpump Motor feeder
11    Spare transformer feeder on all Unit-1 buses         2500     219.79   300/1    CT Details same as Unit service Trans.
12    ESP Service Transformer Feeder-1A & 1B feeder        2500     219.79   300/1    feeder
13    Tie to C1A & C1B                                                       2000/1   CT Details same as I/C feeder from Unit
                                                                                      Transformer
                                                                                                                                       Page 13 of 20
       = 40*1*(Rct+2x0.7983+0.1)                                             RL = 8.87X0.09 (Considering 90m Length
       = 40Rct+67.864V                                                       from Motor terminal to Relay)=0.7983 R relay
                                                                             = 0.1
       Vk>= 40Rct+70V, Im<=30mA at Vk/2
ii.    For O/C & E/F Protection
       R relay in ohm (from relay catalogue of ABB model                                                              0.1
       SPAJ)
       Total Burden on CT = Lead Burden+ Relay Burden
                                               2                             =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                             =Rct+0.7096
       Rct Assumed for CT Sec.1A is 7 ohm                                                                        7.7096
       Total Burden on CT = Lead Burden+ Relay Burden                                                            7.8096
       10 VA, CL5P20                                                         As relay used is numerical(SPAJ-140C) type,
                                                                             hence 10 VA considered is more than
                                                                             Sufficient also Lead burden is less than
                                                                             above assumed buden as relay & Ct are at
                                                                             the same Switchgear.
iii.   For Metering Core
       Typical Meter burden in ohm (from catalogue of                                                                 0.2
       Conzerv model)
       Typical Anolgue Meter burden in ohm (from                                                                          1
       catalogue of AE/Rishab) & Transducer
       Burden margin Consider for future use                                                                              2
       Total Burden on CT = Lead Burden+ Meter Burden
                                               2                             =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                             =Rct+0.7096
       Rct Assumed for CT Sec.1A is 7 ohm for 750/1Amp                                                           7.7096
       Total Burden on CT = Lead Burden+ Meter                                                                  10.9096
       Burden+burden margin Consider for future use
       15 VA, CL-0.5                                                         As meter used is Multifunction type, hence
                                                                             15 VA considered is more than Sufficient
                                                                             also Lead burden is less than above
                                                                             assumed buden as Meter & CT are at the
                                                                             same Switchgear.
                                                                                                                              Page 14 of 20
       10 VA, CL-0.5                                                                 As meter used is Multifunction type, hence
                                                                                     10 VA considered is more than Sufficient
                                                                                     also Lead burden is less than above
                                                                                     assumed buden as Meter & CT are at the
                                                                                     same Switchgear. Also Rct is max typical
                                                                                     value for 750Amp Primary
                                                                                                                                      Page 15 of 20
       Total Burden on CT = Lead Burden+ Meter                                                                           7.9096
       Burden+burden margin Consider for future use
       10 VA, CL-0.5                                                                 As meter used is Multifunction type, hence
                                                                                     10 VA considered is more than Sufficient
                                                                                     also Lead burden is less than above
                                                                                     assumed buden as Meter & CT are at the
                                                                                     same Switchgear.
6      Coal Mill-2A, 2B, 2C, 2D, 2E, 2F                      400     43.74   50/1    3C x 185 mm2
i.     For O/C & E/F Protection
       R relay in ohm (from relay catalogue of ABB model                                                                      0.1
       SPAJ)
       Total Burden on CT = Lead Burden+ Relay Burden
                                               2                                     =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                                     =Rct+0.7096
       Rct Assumed for CT Sec.1A is <=1 ohm                                                                              1.7096
       Total Burden on CT = Lead Burden+ Relay Burden                                                                    1.8096
       10 VA, CL5P20                                                                 As relay used is numerical(SPAJ-140C) type,
                                                                                     hence 10 VA considered is more than
                                                                                     Sufficient also Lead burden is less than
                                                                                     above assumed buden as relay & Ct are at
                                                                                     the same Switchgear.
ii.    For Metering Core
       Typical Meter burden in ohm (from catalogue of                                                                         0.2
       Conzerv model)
       Typical Anolgue Meter burden in ohm (from                                                                                   1
       catalogue of AE/Rishab) & Transducer
       Burden margin Consider for future use                                                                                       2
       Total Burden on CT = Lead Burden+ Meter Burden
       Lead Burden for lead length of 40M= I2x(Rct+2RL)                              =Sqr(1)*(Rct+2Rl)
                                                                                     =Rct+0.7096
       Rct Assumed for CT Sec.1A is 5 ohm for 50/1Amp                                                                      1.7096
                                                                                                                                       Page 16 of 20
       Total Burden on CT = Lead Burden+ Meter                                                                                 4.9096
       Burden+burden margin Consider for future use
       10 VA, CL-0.5                                                                    As meter used is Multifunction type, hence
                                                                                        10 VA considered is more than Sufficient
                                                                                        also Lead burden is less than above
                                                                                        assumed buden as Meter & CT are at the
                                                                                        same Switchgear.
8      Main Incomer from Unit Aux transformer                                  2000/1   CT Details same as I/C feeder from Unit
                                                                                        Transformer
9      Unit Service Transformer-2A & 2B                     2500      219.79   300/1    CT Details same as Station Service
                                                                                        transformer feeder to SST Transformer
10     Spare motor feeder on Unit-2 buses                   5400      590.47   600/1    CT Details same as Feedpump Motor feeder
11     Spare transformer feeder on Unit-2 buses             2500      219.79   300/1    CT Details same as Unit service Trans.
12     ESP Service Transformer Feeder-2A & 2B feeder        2500      219.79   300/1    feeder
                                                                                                                                         Page 17 of 20
       R relay in ohm (from relay catalogue of ABB model                                                                          0.1
       SPAJ)
       Total Burden on CT = Lead Burden+ Relay Burden
                                               2                                        =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                                        =Rct+0.7096
       Rct Assumed for CT Sec.1A is 7 ohm                                                                                    7.7096
       Total Burden on CT = Lead Burden+ Relay Burden                                                                        7.8096
       10 VA, CL5P20                                                                    As relay used is numerical(SPAJ-140C) type,
                                                                                        hence 10 VA considered is more than
                                                                                        Sufficient also Lead burden is less than
                                                                                        above assumed buden as relay & Ct are at
                                                                                        the same Switchgear.
iii.   For Metering Core
       Typical Meter burden in ohm (from catalogue of                                                                            0.2
       Conzerv model)
       Typical Anolgue Meter burden in ohm (from                                                                                      1
       catalogue of AE/Rishab) & Transducer
       Burden margin Consider for future use                                                                                          2
       Total Burden on CT = Lead Burden+ Meter Burden
                                               2                                        =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                                        =Rct+0.7096
       Rct Assumed for CT Sec.1A is 7 ohm for 750/1Amp                                                                       7.7096
       Total Burden on CT = Lead Burden+ Meter                                                                             10.9096
       Burden+burden margin Consider for future use
       15 VA, CL-0.5                                                                    As meter used is Multifunction type, hence
                                                                                        15 VA considered is more than Sufficient
                                                                                        also Lead burden is less than above
                                                                                        assumed buden as Meter & CT are at the
                                                                                        same Switchgear.
                                                                                                                                          Page 18 of 20
       = 40*1*(Rct+2x3.548+0.1)                                                         RL = 8.87X0.4 (Considering 400m Length
       = 40Rct+287.84V                                                                  from Motor terminal to Relay)=3.548 R relay
                                                                                        = 0.1
       Vk>= 40Rct+290V, Im<=30mA at Vk/2
ii.    For O/C & E/F Protection
       R relay in ohm (from relay catalogue of ABB model                                                                           0.1
       SPAJ)
       Total Burden on CT = Lead Burden+ Relay Burden
       Lead Burden for lead length of 40M= I2x(Rct+2RL)                                 =Sqr(1)*(Rct+2Rl)
                                                                                        =Rct+0.7096
       Rct Assumed for CT Sec.1A is <=5 ohm                                                                                    5.7096
       Total Burden on CT = Lead Burden+ Relay Burden                                                                          5.8096
       10 VA, CL5P20                                                                    As relay used is numerical(SPAJ-140C) type,
                                                                                        hence 10 VA considered is more than
                                                                                        Sufficient also Lead burden is less than
                                                                                        above assumed buden as relay & Ct are at
                                                                                        the same Switchgear.
iii.   For Metering Core
       Typical Meter burden in ohm (from catalogue of                                                                              0.2
       Conzerv model)
       Typical Anolgue Meter burden in ohm (from                                                                                      1
       catalogue of AE/Rishab) & Transducer
       Burden margin Consider for future use                                                                                          2
       Total Burden on CT = Lead Burden+ Meter Burden
                                               2                                        =Sqr(1)*(Rct+2Rl)
       Lead Burden for lead length of 40M= I   x(Rct+2RL)
                                                                                        =Rct+0.7096
       Rct Assumed for CT Sec.1A is 5 ohm for 200/1Amp                                                                      5.7096
       Total Burden on CT = Lead Burden+ Meter                                                                              8.9096
       Burden+burden margin Consider for future use
       10 VA, CL-0.5                                                                    As meter used is Multifunction type, hence
                                                                                        10 VA considered is more than Sufficient
                                                                                        also Lead burden is less than above
                                                                                        assumed buden as Meter & CT are at the
                                                                                        same Switchgear.
                                                                                                                                          Page 19 of 20
       10 VA, CL5P20                                              As relay used is numerical(SPAJ-140C) type,
                                                                  hence 10 VA considered is more than
                                                                  Sufficient also Lead burden is less than
                                                                  above assumed buden as relay & Ct are at
                                                                  the same Switchgear.
iii.   For Metering Core
       Typical Meter burden in ohm (from catalogue of                                                      0.2
       Conzerv model)
       Typical Anolgue Meter burden in ohm (from                                                               1
       catalogue of AE/Rishab) & Transducer
       Burden margin Consider for future use                                                                   2
       Total Burden on CT = Lead Burden+ Meter Burden
       Lead Burden for lead length of 40M= I2x(Rct+2RL)           =Sqr(1)*(Rct+2Rl)
                                                                  =Rct+0.7096
       Rct Assumed for CT Sec.1A is 7 ohm for 750/1Amp                                                 7.7096
Page 20 of 20