Installation Guide for ZXCTN 6120S
Installation Guide for ZXCTN 6120S
                                                                                                                ZTE CORPORATION
                                                                                                                Address: NO. 55 Hi-tech Road South ShenZhen P.R.China 518057
                                                                                                                Tel : +86-755-26771900 Fax:+86-755-26770801
                                                                                                                Technical Support Website: http://support.zte.com.cn
                                                                                                                Email: support@zte.com.cn
      Safety Instructions
The safety precautions must be strictly followed to ensure personal safety.
◆ When operating the ZTE equipment, abide by the local laws and regulations. If no local regulations are available, follow the information
  provided in this document.
◆ The personnel in charge of installation must be trained and qualified for installing or maintaining the equipment.
◆ Personnel protection
  • Before operating equipment, take off the personnel jewelry that conduct electricity, such as watches, chains, bracelets and rings.
  • Wear personnel protective articles.
  • Note the safety signs and warnings pasted on the equipment. Never cover or remove the safety signs and warnings.
◆ Equipment installation safety
  • When carrying the cabinet, wear protective gloves.
  • Before touching the cabinet, subracks, boards or cables, wear anti-static gloves or an anti-static wrist strap to prevent the electrostatic
    discharge of the human body from damaging sensitive components.
  • The personnel who install the electrical facilities must be qualified, because improper electrical installation can result in fire, electric
    shocks, explosions, personal injury or death.
      Tools
The following diagrams are only for reference. The tools and meters that are purchased on site prevail. All the meters must be calibrated
and proofed before they are used.
       Gloves             Anti-static gloves             Anti-static                 Tape                     Multimeter                Spanner             Network cale tester               Ladder
    Used during              Used during                Used during                                     Measures insulation and
                                                                                                                                                                                     Used for work at heights
                                                                               Measures a length        electric performance          Secures bolts          Test a network cale
    installation             installation               installation
 Hydraulic
 Pressure Crimper          Percussion drill             Paper knife               Nail hammer                  Marker               Torque spanner              Baking gun              Punching bit
 Powerfully presses or         Drills a lole       Cuts paper and unfolds       Knocks in and pulls       Marks positions of            Fastens bolts        Sprays glue and fast    Forms a dimple on the
 cuts cable                                        box                          out the nail              ground drilling holes                              paste                   floor to guide the drill bit
    Installation Flow
Start
Installation preparation
 Install a system main board             (P9)                  Paste the cable labels                         Instructions of cable signal                 (P14)
                                                                       (P17)
            • The inside equipments of cabinet, including power distribution unit, ZXCTN 6120S, fan unit, dustproof unit, boards and subrack cables,
              have been installed before they leave the factory.
            • The installation of 300mm, 600mm and 800mm depth cabinet, please refer to Bearer Network Product Cabinet (300 mm-Deep) Quick
              Installation Guide, Bearer Network Product Cabinet (600 mm-Deep) Quick Installation Guide or Bearer Network Product Cabinet
              (800 mm-Deep) Quick Installation Guide.
            • The installation flows of installing the subrack ourdoors and in network box are similar to the installation flow of installing subrack in the
              cabinet. For details, refor to “5. Installing the Subrack Outdoors” and “6. Installing the Subrack In the Network Box”.
                                                                                2
Wall-mounted Installation Flow
Start
Installation preparation
                                                                  Unpacking and
                                                                    inspection
            The installation flow of installing the subrack on the desktop is similar to the installation flow of installing subrack on the wall. For
            details, refor to “4. Installing the Subrack On the Desktop”.
                                                                                3
    Unpacking and inspection
Unpacking the packing box to insure the number of goods is same with the one in the purchase order, and goods is intact. This chapter
describes the unpacking operation steps of wooden box and boards box.
Wooden box: Using to packing cabinet and subrack.
Boards box:Using to packing boards, terminal equipments and cables.
Precondition
Already got flat-head screwdriver, nail hammer, diagonal pliers, paper knife and anti-static gloves (or anti-static ).
A. Engineering supervisor and customers count goods by referring to Unpacking Inspection Guide to insure the package is intact.
B. Unpacking the outer packing of wooden box.
  a. Transport the wooden box to the install place in the machine room by forklift or manual work.
  b. Unlock tongues by flat-head screwdriver. As shown below, remove the upper cover and planks all around.
  c. Take out the components list, technical documents and the public goods which need to be installed from the package No.1.
         In the engineering installation, there are several packages to deposit goods. For easy to distinguish, packages are numbered such as No.1, No.2
         and No.3.
1 2
C. As shown below, when unpacking the outer packing of boards, anti-static gloves should be worn.
D. Count, check, transport and deposit goods.
For the boards, which will not be installed immediately, should be put in the original packages and sealed.
                                                                              4
         1. Installing Subrack on Wall
             • When installing ZXCTN 6120S horizontally, there should be at least 200 mm reserved space around the equipment, except for mounted wall.
             • Make sure that there is enough space from the roof of the equipment room after installing the wall-mounted bracket. If the top-cabling mode is used
               to lay cables in the equipment room, the distance between the top cabling rack and the top of the wall-mounted bracket should be no less than
               200 mm.
             • The wall-mounting bracket should be installed properly and firmly. The horizontal and vertical deviations should be less than one thousandth of
               cabinet height.
             • For the equipment rooms with high shockproof requirements, devices should be reinforced to meet the shockproof requirements.
             It is forbidden to drill hole on the wall-mounted bracket without permission. The drilled hole, which is not compliance with the requirements, will
             damage the supporting structure of the wall-mounted bracket.
         A                                                                                   B        65 mm
                                   465 mm
Drill bit
Ø12
                                                                         245 mm
120 mm
4-ø12
                                                                                                                                             Expansion Pipe
                                                                                                                                                spring washer
                        Expansion Bolt
Screw
                                                                                                                                             plane washer
                                                                                                                                                            M12X80 mm
                                                                                                                                                            Hex Bolt
                                                                                   5
 E
                                                              The vertical installation procedure is the same as the horizontal installation. The fan
                                                              must be installed in the lower part of the device.
A B
        There should be at least 3U(1U=44.45 mm) reserved space in the bottom of the cabinet to insure the installation.
        If there are more than three subracks installed in the cabnet, windshields wounld be settled between subracks.
A B
Subrack installation with front support lug is only available for 600 mm depth and 800 mm depth cabinets.
A B
                                                                                 Anti-backflow
                                                                                 U plug-in box
                                                                             7
      Anti-backflow U plug-in box should be installed with back support lug
A B
After getting the equipments or borads, the first time power on should be recorded.
                                                                              8
2.6.2 Installing AC Board
A B
                                                                               6120S has two DC board, which are PWA and PWDC. As a result
                                                                               of the same installation methods of these two boards, we set PWDC
                                                                               as an example to introduce the DC board installation.
     press the
     handle      handle
                                       2
          press the                         1
          handle                 2
                                                 1
                          2
A B
Handle
When plugging and unplugging an optical fiber , avoid damaging the ceramic ferrule and the plug.
 A                                             B                                             C
               Take off the dust cap
Dust cap
                     Dust cap
                                                    Optical
                                                   Attenuator
                                                                           10
• Unplug an Optical Attenuator
                                 B
 A
3. cable installation
                                     11
3.2 Connecting the External Power Cable and Protective Earth Cable
                                                           User power supply supplies -48 V DC input power for the power
                                                           distribution box by the out cabinet cable. The installation is
                                                           according to the power supply condition of user and make the
                                                           cable outlet on site.
3.3 Connecting the cabinet Grounding Cable and Subrack Grounding Cable
                                           12
3.4 Installing Subrack DC Power Cables
                                                  • When installing equipment in the cabinet, subrack DC power cables
                                                    supply power to equipment through the -48 V output of power
                                                   distribution box.
                                                  • If the equipment is not installed in the cabinet, it will be need to
                                                    according to the power supply condition of user and make the cable
                                                    outlet on site.
                                           13
3.6 Connecting the Signal Cables
     • Straightly install the cable, without curl and stacking.
     • If the bend radius of the root of the cable is reduced, the outer
       protective sleeve can be taken off by 30 cm~50 cm.
                                                                           14
15
Instructions of LTC/Qx interface cable signal                                    Instructions of GPS input/output cable signal (The other terminal is customized)
Pin Number           Cable Spectrum       Signal Definition                      Pin       Cable Spectrum Signal             Signal Definition
End A     End B                                                                  Number
                                                                                 End A
1         1          White/Orange         TD+: positive sending signal           1         White/Orange        -             -
2         2          Orange               TD-: negative sending signal           2         Orange              -             -
3         3          White/Green          RD+: positive receiving signal         3         White/Green         1PPS-         Negative pulse per second signal
4         4          Blue                 -                                      4         Blue                -             -
5         5          White/Blue                                                  5         White/Blue          -             -
6         6          Green                RD-: negative receiving signal         6         Green               1PPS+         Positive pulse per second signal
7         7          White/Brown          -                                      7         White/Brown         TOD-          Negative time signal
8         8          Brown                                                       8         Brown               TOD+          Positive time signal
Instructions of alarm input/output cable signal Instructions of 120 Ω BITS/GPS cable signal
5 ALM3- Alarm touch point B of signal 3 4 Blue BITS_Tx+ Positive sending signal of external BITS
6                      Alarm touch point B of signal 2                           5         White/Blue        BITS_Tx-       Negative sending signal of external BITS
        ALM2-
7       ALM4+          Alarm touch point A of signal 4                           6         Green             1 PPS+         positive pulse per second signal
Pin Number          Cable                        Pin Number       Cable                           Type                  End A       Signal Definition
                    Spectrum                                      Spectrum
                                                                                                  75 Ω single coaxial   1           Singal transmit path
End A End B                                      End A End B                                      cable
                    White/Orange                                  White/Orange                                          2           Singal return path, connected to
1        3                                       1       1                                                                          protection ground
2        6          Orange                       2       2        Orange
3 1 White/Green 3 3 White/Green
4 4 Blue 4 4 Blue
5 5 White/Blue 5 5 White/Blue
6 2 Green 6 6 Green
7        7          White/Brown                  7       7        White/Brown
8        8          Brown                        8       8        Brown
To install the subrack horizontally, refer to the procedure described in Section “2.2 Installing Subrack in Cabinet”.
         •    The subrack must be pushed into the cabinet smoothly and straightly. If it is hard to push the subrack into the cabinet, check whether the cabinet
              or subrack is deformed. Forced pushing may result in device damage.
         •    During the outdoor installation, air deflector plates or U-shaped subracks must be installed in empty slots.
The vertical installation procedure is the same as the horizontal installation. The fan must be installed in the lower part of the device.
                                                                                     16
         A                                                   B
To install the subrack horizontally, refer to the procedure described in Section “2.2 Installing Subrack in Cabinet”.
A B
                                                                                17
                  At about 2 cm distance of
                  the cable connector, fold
                  the cable tail to the left.
                                                                             For the vertical cable, the label head should face the left,
                                                                             and for the horizontal cable, the cable head should face
                                                                             downward.
Specification Diagram
Cable strap
                                                              18
19
20
9.2 Measuring Resistance Between Output Terminals of Power Distribution Subrack
Connection Terminal Positions of Power Distribution Subrack
   Output-48V    Output               Input            Output   Output-48V
    RTN(1-4) -48V (1-4)             -48V (1-2)       -48V (1-4) RTN(1-4)
      1234       1 2 3 4                1 2         4 3 2 1       4321
                             Input PE
                                                                              Before measuring the resistance between output terminals
                                                                              of the power distribution subrack, ensure that the switch of
                                                                              external power supply equipment is set to OFF.
Output PE 1 2 Output PE
                                                                         21
9
If the cable connector is not firm, we can use cross screwdriver to screw the fastening nut tightly or the captive screw .
Steps
A. Check power cables of the subrack. Ensure that the power cables are correctly connected with the power supply board on the
   corresponding subrack.
B. Verify that the connectors at both ends of the subrack power cables are firmly connected.
C. Set the corresponding subrack power switch located on DC power distribution subrack to ON.
D. Observe indicator status on the power supply board.
   • If the green indicator is constantly on, it indicates that the power supply is normal.
   • If the indicator is not lit, it indicates that the power supply is invalid. Check the power supply and eliminate the faults.
E. Check the indicator panel on the top of the cabinet. If the green indicator is solid on, the power supply for the cabinet indicator panel is
   normal.
                                                                               22
9.6 Checking Board Status
A.1 Clean the end faces of the optical interfaces on an optical module with dust-free cotton swabs
          • You must wear anti -static gloves.
          • The optical module is removed.
          • It is forbidden to install, remove, or shake the optical module with force.
          • You must avoid the direct contact between hands or other objects and the pins of optical modules. The tote box of each optical module must be
            stored in an anti -static bag to prevent static electricity from being damaged.
          • When you hold an optical module, the electrical interfaces of the optical module must be kept away from other hard objects to prevent the contacts
            of the electrical interfaces from being scratched or damaged.
A. Drop a small amount of cleaning solvents onto a dust-free cotton swab.
B. Lightly insert the dust-free cotton swab into the jack of the optical module (see the following figure).
C. Turn the dust-free cotton swab counterclockwise to clean the end faces of optical interfaces.
D. Install the cleaned optical module in the board.
          • During engineering, various types of dust-free cotton swabs can be used for fiber cleaning. You can select an appropriate type as required.
          • Each cotton swab can only be used to clean one optical module.
          • Each optical module can be cleaned by multiple cotton swabs.
          The cleaned optical interfaces must be used immediately and cannot be touched. The unused optical interfaces must be covered with dust-proof
          caps.
You must ensure that the board laser is shut down and the connections at both ends of fibers are disconnected.
23