8.conclrete Flooring

The document provides a job safety analysis for concrete flooring work. It identifies potential hazards for soil filling, ground compacting, and concrete pouring activities. It lists recommendations to mitigate risks for each activity such as using proper PPE, barricading work areas, and ensuring only authorized personnel perform tasks.

Uploaded by

Francis Vinoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

8.conclrete Flooring

The document provides a job safety analysis for concrete flooring work. It identifies potential hazards for soil filling, ground compacting, and concrete pouring activities. It lists recommendations to mitigate risks for each activity such as using proper PPE, barricading work areas, and ensuring only authorized personnel perform tasks.

Uploaded by

Francis Vinoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

REZAYAT COMPANY LTD.

(YERP/DAELIM)
JOB SAFETY ANALYSIS ACTIVITY: Concrete flooring
Item Sequence Of Job Potential Hazard Person at risk Recommendation
01 Soil filling & leveling Personnel injury Working crew 1. Banks man must be deployed with dumper and he will give
Signal to driver while reversing and unloading soil.
2. No unauthorized person enters in the area.
3. Work permit shall be obtained prior to start the work.

02 Ground compacting Personnel injury Hand compact machine 1. Hand compact machine operator must be authorized and
operator Certified.
2. Area to be barricaded before start the work.
3. While re fueling compacting m/c engine must be stopped.
4. Unauthorized personnel shall not enter in the area.
5. Machine shall not leave un attended while engine working.

03 Concrete pouring Inhalation, Hands and Working crew 1. Proper and required PPEs must be used.
feet mordant, 2. The personnel who work in concrete shall wear Gum boots
Eye injury and
Rubber hand gloves.
3. Trained personnel only allow to pour the concrete inside
Shuttering area and leveling it.
4. After flooring area must be barricaded and warning sign
“ WET CONCRETE”
5. After detach the shuttering boards protruding nails must be
bent or removed from the boards.

Prepared by: Reviewed by: Approved by:


Rajesh kunta

Supervisor/Foreman Permit Receiver Safety Officer