CBRE Fake Quotation

This document provides a quotation for electrical works from Bhuvanesh at economical rates for a company premises. The works include cable laying at Rs. 175/mtr for 150 mtrs amounting to Rs. 26,250, two earthings at Rs. 32,500 each totaling Rs. 65,000 and transformer mesh painting at a lump sum of Rs. 45,000 totaling Rs. 1,36,250 with a 5% discount of Rs. 6,813 bringing the grand total to Rs. 1,29,438. Payment terms include 70% after approval and 30% after completion of work.

Uploaded by

nichubharath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views2 pages

CBRE Fake Quotation

This document provides a quotation for electrical works from Bhuvanesh at economical rates for a company premises. The works include cable laying at Rs. 175/mtr for 150 mtrs amounting to Rs. 26,250, two earthings at Rs. 32,500 each totaling Rs. 65,000 and transformer mesh painting at a lump sum of Rs. 45,000 totaling Rs. 1,36,250 with a 5% discount of Rs. 6,813 bringing the grand total to Rs. 1,29,438. Payment terms include 70% after approval and 30% after completion of work.

Uploaded by

nichubharath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

STANDARD ELECTRICALS

#984, 1ST MAIN ROAD, VADDARAPALYA


PP LAYOUT NEARBMTC BUS DEPOT
UTTARAHALLI, BANGALORE-61
emailid:whatsinemailid@gmail.com
9482588857

Respected Sir,

My quotation at economical rates for works in your company premises


Sl.no WORK Unit Qty Rate Amount

1 Cable set righting work Mtr 150 175 26250

Earhing (2 side earthing including all labour, materials in


2 No. 2 32500 65000
standard or as per requirement from CBRE)

Transformer mesh Painting(painting with 1 coat of primer


3 1 job lumpsum 45000 45000
and good quality synthetic enamel paint)
TOTAL 136250
Discount @ 5% 6813

GRAND TOTAL 129438

ONE LAKH TWENTY NINE THOUSAND FOUR HUNDRED & THIRTY EIGHT ONLY

Properieter
Terms & Conditions of payment:
1.70 % of the total amount to be paid after approval
2.30% of the total amount after the work is finished.
Thanking You,
Bhuvanesh