Riau GFPP 275 MW IPP Project Discipline: Temporary Jetti

The daily work report summarizes activities on October 23, 2019 for the Riau GFPP 275 MW IPP Project. Excavation and dredging work continued on deepening the river area for the barge. Concrete sheetpile work involved procuring sheetpile material. Reinforcing bar work was conducted to make frames and assemble trays for a 12,000x1,400x240 concrete wall. Land clearing of 10,000 square meters was also performed for the loading yard preparation, with 700 square meters cleared that day. Manpower and equipment usage is also documented.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views3 pages

Riau GFPP 275 MW IPP Project Discipline: Temporary Jetti

The daily work report summarizes activities on October 23, 2019 for the Riau GFPP 275 MW IPP Project. Excavation and dredging work continued on deepening the river area for the barge. Concrete sheetpile work involved procuring sheetpile material. Reinforcing bar work was conducted to make frames and assemble trays for a 12,000x1,400x240 concrete wall. Land clearing of 10,000 square meters was also performed for the loading yard preparation, with 700 square meters cleared that day. Manpower and equipment usage is also documented.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

COMPANY LOGO

Date : October 23, 2019

DAILY WORK REPORT


Riau GFPP 275 MW IPP Project Prepared by Project Control Project Manager

Discipline : Temporary Jetti


October 23,2019 October 23,2019

1. Major Work Status 1. EXCAVATION & DREGGING WORK

1. EXCAVATION & DREGGING WORK 1.A Soil Cutting Work

1.A Soil Cutting Work Pendalaman sungai pada area Barge

Pendalaman sungai pada area Barge 1.B Disposal

1.B Disposal 2.CONCRETE SHEETPILING WORK

2.CONCRETE SHEETPILING WORK 2.A Sheet pile w350

2.A Sheet pile w350 Pengadaan material sheetpile

Pengadaan material sheetpile 3. CONCRETE WALL

3. CONCRETE WALL 1.A Re-Bar

1.A Re-Bar Membuat sekang 1400x240 berikut merangkai tray pembesian dinding 12000x1400x240

Membuat sekang 1400x240 berikut merangkai tray pembesian dinding 12000x1400x240 4. LOADING YARD PREPARATION

4. LOADING YARD PREPARATION 1.A Land Clearing

1.A Land Clearing

SAFETY ISSUE MATERIAL

- Quantity
Item Unit
Total Contract Actual at Site Today Accum (%)

Soil Cutting m³ 1,278 4,275 160 3,587 10.45%

Disposal m³ 1,278 4,275 150 3,343 4.19%

Sheetpile w350 m² 1,645 1,645 96 544 10.33%

Re-Bar Ton 5.25 5.25 2.50 5.00 1.50%

Land Clearing m² 10,000 10,000 700 7,200 1.44%

OUTSTANDING ITEMS WEATHER

- No outstanding item to be discussed. Time Condition Remarks

07:00 ~ 12:00 Clear

13:00 ~ 18:00 Clear


Date : October 23, 2019
2. Manpower & Equipment Mobilization Status
Manpower Manhours Equipment
Description Unit Previous Today Accum. Unit Previous Today Accum. Desctription Size Previous Today Accum.

Indirect Car ( Avanza) 1

Project Manager M/D 1 M/H 10 - 10 Ford Ranger 1

Admin Manager M/D M/H - - - Truck/Elf 2

Site Manager M/D 1 M/H 10 - 10 Excavator Short arm PC200 20 Ton 1

Electrical Supervisor M/D 1 M/H 10 - 10 Excavator Long arm PC200B 20 Ton 1

QA/QC M/D M/H - - - Snei Machine(Asada) 2"~ 6"

Admin QC M/D M/H - - - Hand Pallet 3 Ton

Instrument Supervisor M/D M/H - - - Genset 40 KVA 1

Instrument Connection M/D M/H - - - Snei Machine (ASADA) 1"-2"

Engineer M/D 1 M/H 10 - 10 Snei Machine (ASADA) 2"-3"

Material Control M/D M/H - - - Drilling Machine

Schedule Control M/D M/H - - - Cutting whell 14" 1

HSE Coordinator M/D M/H - - - Standing drill machine

HSE Admin M/D M/H - - - Grinding machine 4"

Safety Man M/D M/H - - - Boom Truck 5 Ton

Admin / Accounting M/D 2 M/H 20 - 20 Crane 55 Ton

Warehouse M/D M/H - - - Chainsaw machine

Driver M/D 2 M/H 20 - 20 40' Trailer

Office Girl / Boy M/D M/H - - - hydraulic press scun

Jack cable

Hand Pallet 5 Ton

Crane 35 Ton

Boom Truck 3 Ton

Water Pump 2"

Water Pump 3"

Portable Generator 5 KW 1

Hand Pallet 3 Ton

Snei Machine (ASADA) 100 2"-4"

In-Direct Total M/D 8 - - M/H 80 - 80 Hydraulic Pipe Bender 3/4" -4"

Direct Grider 1

Foreman M/D 2 M/H 20 - 20 Compact soil 1

Skill 1 M/D 2 M/H 20 - 20

Skill 2 M/D 5 M/H 50 - 50

Helper M/D 3 M/H 30 - 30

Scaffolder M/D M/H - - -

Rigger M/D M/H - - -

Carpenter M/D M/H - - -

Digger M/D M/H - - -

Welder M/D M/H - - -

Excavator Operator M/D 2 M/H 20 - 20

Security M/D 2 M/H 20 - 20

Dump Truck M/D 2 M/H 20 - 20

Crew Crane M/D M/H - - -

Grider Operator M/D 1 M/H 10 - 10

Compact soil Operator M/D 1 M/H 10 - 10

Direct Total M/D 20 - - M/H 200 - 200

Grand Total M/D 28 - - M/H 280 - 280 Grand Total 11 - -


Date : October 23, 2019

3. Photography

Date 23-Oct-19 Description PHOTO DESCRIPTION AREA

Pek.Concrete
Stock pile Warehouse Wika
Sheetpiling Work

Date 23-Oct-19 Description PHOTO DESCRIPTION AREA

Pek.Re-Bar
Fabrikasi sekang Concrete Wall
dan Merangkai