Activity Duration Cost C D C/D Days Shortened: Over Headed Cost /day

The document outlines a cost analysis for project management, detailing overhead costs per day associated with different project activities. It includes variables such as duration, normal and crash costs, and the impact of shortening project days on direct and total costs. The focus is on understanding how changes in project duration affect overall financials.

Uploaded by

Tariq Qaisrani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Activity Duration Cost C D C/D Days Shortened: Over Headed Cost /day

The document outlines a cost analysis for project management, detailing overhead costs per day associated with different project activities. It includes variables such as duration, normal and crash costs, and the impact of shortening project days on direct and total costs. The focus is on understanding how changes in project duration affect overall financials.

Uploaded by

Tariq Qaisrani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Over headed Cost= /day

Activity Duration Cost ∆ ∆D ∆C/D Days Shortened


Normal Crash Normal Crash C

Days Cut
Project Duration
Increases C/D
Direct Cost
Over headed Cost
Total Cost