JOB SAFETY ANALYSIS Job Task: Jack Hammer Operations Date: Analysis Performed
By: Penn Township
SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARDS RECOMMENDED ACTION
1. Lift jackhammer from Lower back, arm, and 2 people needed to lift
compartment inside of compressor. shoulder strain jackhammer
Pinched hand on side of Use lighter jackhammer 60 lbs
compartment instead of 90lbs
Use optional way of storing
jackhammer
2.Carry jackhammer over to Back and arm strain Use lighter jackhammer if
designated start point. Possible hernia possible
Have 2 people to carry
jackhammer
3. Connect hoses to hammer and Pinched finger when Wear gloves when connecting
compressor. connecting hoses hoses
to compressor
4. Position jackhammer at starting Possible hearing loss or Wearing ear plugs and safety
point. Start compressor and squeeze particles in eye glasses at all times
trigger to begin. Jackhammer hitting feet Position feet apart keeping a
safe distance from blade of
hammer
5. Shut off compressor, bleed air Stay clear of moving parts on Wear safety glasses and gloves
from lines, disconnect hoses, and put motor Use 2 people to carry
jackhammer back in compartment. Dust blown into eyes jackhammer
Pinched finger Backup to compartment
Lower back, arm, and
shoulder strain
/conversion/tmp/scratch/517272538.doc