MAJOR HAZARD STANDARD
ISOLATION & LOCKOUT
(ISOLASI DAN PENGUNCIAN)
(MHS 04)
This Major Hazard Standard has been approved for use by:
Mike Sylvestre
Acting
Senior Vice President and Chief Executive Officer PT Inco
st
11 January 2006
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 1 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
ABOUT THE PT INCO MAJOR HAZARD STANDARDS
These Standards are designed to address the major safety hazards at PT Inco. For each major
hazard they define the full range of available controls that could be implemented to address all
aspects of the hazard in the context of industry best-practice.
Compliance with these Standards comprises a long-term management goal for the site, as does our
commitment to zero injury for all workers. It is not expected that all areas of operation could be in
complete compliance with all aspects of each Standard, just as it is not expected that all risk can be
eliminated from any mining and processing operation.
However, the concept of best practice includes a commitment to ongoing improvement, and these
Standards provide a means of measuring and guiding that progress. A baseline audit will be
conducted in 2006 to measure compliance with all 18 Major hazard Standards, and this in turn will
form the basis for improvement plans in all Departments that will result in progressive reduction of risk
of injury from accidents.
Standar ini dirancang untuk mengatur bahaya keselamatan utama di PT Inco. Untuk tiap bahaya
utama yang sudah mempunyai pengendalian dengan jangkauan penuh yang dapat diterapkan untuk
mengatur semua aspek bahaya dalam konteks praktek-praktek terbaik dalam industri.
Pematuhan terhadap standar ini terdiri dari tujuan manajemen jangka panjang di lokasi, sebagaimana
halnya komitmen kami untuk menuju nihil cidera bagi pekerja. Tidaklah diharapkan bahwa semua
area operasi dapat seluruhnya mematuhi semua aspek dari setiap standar, sebagaimana yang tak
diharapkan bahwa semua risiko dapat dieliminasi dari setiap operasi penambangan dan pengolahan.
Namun demikian, konsep tentang praktek-praktek terbaik termasuk merupakan suatu komitmen
untuk terus menerus mengupayakan peningkatan, dan Standar ini memberikan suatu cara untuk
mengukur dan memberikan pedoman kemajuan itu. Suatu audit sebagai garis dasar akan dilakukan
pada tahun 2006 untuk mengukur kepatuhan terhadap seluruh 18 Standar Bahaya Utama, dan ini
pada gilirannya akan membentuk suatu basis dalam melakukan peningkatan yang bakal memberikan
hasil pengurangan secara progressiv terhadap risiko cedera yang terjadi akibat kecelakaan.
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 2 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
CONTENTS / DAFTAR ISI
About The PT Inco Major Hazard Standards ......................................................................................2
Contents / Daftar Isi ............................................................................................................................3
Purpose / Tujuan.................................................................................................................................4
Scope / Ruang Lingkup.......................................................................................................................4
Requirements / Persyaratan ...............................................................................................................4
1. Hazard Identification, Risk Assessment and Control / Identifikasi Bahaya, Penilaian Risiko dan Pengendaliannya
4
2. Selection, Training, Competency and Authorisation / Pemilihan, Pelatihan, Kompetensi, dan Wewenang ............ 5
3. Communication and Awareness / Komunikasi dan Kesadaran Bagi Karyawan..................................................... 10
4. Specifications / Spesifikasi ...................................................................................................................................... 10
5. Work Method and Condition Control / Metode Kerja dan Pengendalian Kondisi ................................................... 13
6. Maintenance / Pemeliharaan ................................................................................................................................... 17
7. Emergency Controls / Pengendalian Keadaan Darurat .......................................................................................... 18
8. Monitoring, Inspections and Audits / Permantauan, Inspeksi dan Audit................................................................. 18
9. Reporting, Assessment and Corrective Actions / Pelaporan, Penilaian Dan Tindakan Perbaikan........................ 20
Document Control / Kontrol Dokumen ..............................................................................................21
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 3 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
PURPOSE / TUJUAN
To ensure all work on equipment and machinery is conducted safely through the application of an isolation and lockout
system.
Meyakinkan bahwa semua pekerjaan pada peralatan atau permesinan yang dilaksanakan sudah aman dengan cara
menerapkan suatu sistem isolasi dan penguncian.
SCOPE / RUANG LINGKUP
This Standard applies to all installation, construction, inspection and maintenance work performed on equipment and
machinery at PT Inco.
Standar ini berlaku bagi seluruh pekerjaan instalasi, konstruksi, inspeksi dan pemeliharaan pada peralatan dan
permesinan di PT Inco.
REQUIREMENTS / PERSYARATAN
1. HAZARD IDENTIFICATION, RISK ASSESSMENT AND CONTROL / IDENTIFIKASI BAHAYA, PENILAIAN
RISIKO DAN PENGENDALIANNYA
Objectives
To ensure a risk management process is applied to identify and control hazardous energy sources before any
work is authorised on any equipment or machinery.
To ensure the PT Inco Change Management Process is applied.
Tujuan
Meyakinkan proses manajemen risiko diterapkan guna mengidentifikasi dan mengendalikan sumber energi
berbahaya sebelum setiap pekerjaan diijinkan dilaksanakan pada suatu peralatan atau permesinan.
Meyakinkan Proses Manajemen Perubahan PT Inco tersebut diterapkan.
Outcome Accountability Tool
1.1 Risk Assessment / Penilaian Risiko PTI General
Managers
Each Department must undertake a risk assessment on all equipment and
machinery on which installation, construction, inspection and/or maintenance
work is performed to determine where isolations are required to control
hazardous energy sources.
Any unacceptable risk of injury to personnel from hazardous energy associated
with equipment or machinery isolation must be controlled. As a minimum,
isolation controls shall be documented in accordance with Section 5.2 Isolation
Documents.
All documentation and records relating to risk assessments must be retained.
Setiap Departemen harus melakukan penilaian risiko pada semua peralatan dan
mesin yang akan menjalani instalasi, konstruksi, inspeksi dan/atau tugas
pemeliharaan, untuk menentukan di bagian mana saja yang memerlukan
pengisolasian untuk mengendalikan sumber energi berbahaya.
Setiap risiko cedera yang tak dapat diterima terhadap personil akibat dari energi
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 4 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
berbahaya yang berhubungan dengan pengisolasian peralatan atau mesin harus
dikendalikan. Minimal, kontrol pengisolasian harus didokumentasikan sesuai
dengan Dokumen Pengisolasian Bagian 5.2.
Semua dokumentasi dan catatan yang berkaitan dengan penilaian risiko harus
disimpan.
1.2 Change Management / Manajemen Perubahan PTI General PT Inco
Managers Change
The PT Inco Change Management Procedure must be followed to authorise Management
modifications to the Isolation and Lockout System. Procedure
Any modification likely to degrade the safety of personnel must trigger a risk
assessment.
Prosedur Manajemen Perubahan PT Inco harus dipatuhi ketika memberikan
wewenang untuk melakukan modifikasi terhadap Sistem Isolasi dan Lockout.
Setiap modifikasi yang menyebabkan menurunnya tingkat keselamatan orang
mengharuskan dilakukannya penilaian risiko.
2. SELECTION, TRAINING, COMPETENCY AND AUTHORISATION / PEMILIHAN, PELATIHAN,
KOMPETENSI, DAN WEWENANG
Objectives
To ensure personnel required to conduct risk assessments are competent.
To ensure all personnel required to work under the Isolation and Lockout System receive training and are
assessed as competent.
Tujuan
Meyakinkan bahwa semua orang yang diwajibkan melakukan penilaian risiko kompeten.
Meyakinkan bahwa semua orang yang diperintahkan bekerja di bawah Sistem Isolasi dan penguncian
menerima pelatihan dan dinilai sebagai orang yang kompeten.
Outcome Accountability Tool
2.1 Risk Assessment Competency / Kompetensi Penilaian Risiko. PTI General Training
Managers Records – Risk
Team or personnel conducting risk assessments must be recognised as Assessment
collectively:
1. Possessing relevant area, operational or system experience (eg competent
process technician or maintenance technician, process engineer).
2. Hold the relevant qualifications (eg appropriate equipment licenses,
mechanical or electrical trade’s certificate).
3. Having 2 or more people trained in PTI Risk Assessment (SP01) and
nominated by their general manager as competent in this role.
Semua orang atau tim yang melaksanakan penilaian risiko harus memiliki:
1. Memiliki Pengalaman tentang area yang sesuai, pengalaman operasional
atau system (misalnya: teknisi proses yang kompeten atau teknisi
pemeliharaan, engineer proses).
2. Mempunyai kualifikasi yang relevan (misalnya: lisensi peralatan yang
sesuai atau sertifikat pekerja perlistrikan), dan
3. Butuh 2 orang atau lebih yang akan diikutkan dalam training PTI Risk
Assessment (SP01). Nama-nama yang berkemampuan untuk tugas ini
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 5 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
diusulkan oleh manajer masing-masing.
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 6 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
2.2 Training and Competency / Pelatihan dan Kompetensi Director HR Fixed or
Mobile,
A training and competency system shall be implemented to ensure that all and Equipment and
persons at PT Inco have adequate knowledge and skills pertaining to the Machinery
risks being being addressed by the MHS and the associated controls. This shall Contractor Skills Matrix
include: Company
Managers
1. Mandatory training and licensing requirements for certain types of work
that may expose persons to the major hazards. This shall include:
General Inductions for all employees, and site specific
inductions for certain employee groups based on risk (that
include reference to the major hazards at PT Inco and the
MHS system and related controls).
A program of Basic Safety Training for persons involved in
working at heights, confined space, rigging (and other work
based on risk).
A program of mandatory licensing for certain types of work
requiring specialized skill sets (e.g. light vehicle operation).
2. Department-based training to meet specific needs based on risk.
3. Competency in these defined training requirements assessed by
qualified workplace assessors and recorded in a system that allows
ready verification and tracking of workplace competencies.
Isolation and Lockout System Training must be provided for all personnel
required to apply, or work under the Isolation and Lockout System before being
authorised to work under the system.
Isolation and Lockout System training must be based on SP09 Isolation &
Lockout.
Specific training shal be provided for personnel who:
¾ Isolate equipment or machinery.
¾ Supervise the isolation of equipment.
¾ Prepare equipment or machinery for maintenance.
¾ Conduct inspections on equipment or machinery.
¾ Conduct maintenance on equipment or machinery.
Workplace assessments for operator and maintainers shall be conducted.
Workplace assessments shall be conducted by Workplace Assessors who have
been trained in assessment techniques and either:
o Possess relevant equipment and machinery operation or
maintenance experience, or
o Utilise a specialist who possess the relevant technical
knowledge
Personnel shall be authorised in accordance with their differeing responsibilities
under the Isolation and Lockout System.
A register shall be maintained in each Department of all persons authorised to
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 7 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
work under the Isolation and Lockout System.
Harus dilaksanakan sistem pelatihan dan kompetensi untuk memastikan bahwa
semua orang di PT Inco mempunyai pengetahuan dan keahlian yang cukup
mengenai risiko yang ditangani oleh MHS dan tindakan pengendalian
terkait. Sistem dan pelatihan ini harus termasuk:
1. Pelatihan wajib dan persyaratan lisensi untuk jenis pekerjaan tertentu
yang dapat membahayakan seseorang. Pelatihan ini harus termasuk:
Induksi Umum untuk semua karyawan, dan induksi khusus
berdasarkan lokasi untuk kelompok karyawan tertentu
berdasarkan risiko (yang termasuk referensi terhadap bahaya-
bahaya utama di PT Inco dan sistem MHS dan kontrol-kontrol
terkait).
Program Pelatihan Keselamatan Dasar untuk orang yang
bekerja di ketinggian, ruang tertutup, rigging/tali-temali (dan
pekerjaan lain berdasarkan risiko).
Program pengaturan lisensi wajib untuk jenis pekerjaan
tertentu yang memerlukan serangkaian keahlian khusus
(misalnya operasi kendaraan ringan).
2. Pelatihan berdasarkan departemen untuk memenuhi kebutuhan
tertentu (berdasarkan risiko).
3. Kompetensi dalam persyaratan pelatihan tertentu ini dinilai oleh penilai
tempat kerja yang berkualifikasi, dan dicatat dalam sistem yang
memungkinkan verifikasi kesiapan dan pelacakan kompetensi di tempat
kerja.
Pelatihan Sistem Pengisolasian dan Penguncian harus diberikan bagi semua
personil yang harus menerapkan, atau bekerja di bawah Sistem Pengisolasian
dan Penguncian, sebelum diizinkan atau mendapat otorisasi bekerja di bawah
sistem tersebut.
Pelatihan Sistem Pengisolasian dan Penguncian harus berdasarkan SP09
Isolasi & Penguncian.
Harus diberikan pelatihan spesifik bagi personil yang:
¾ Mengisolasi peralatan atau mesin.
¾ Mengawasi pengisolasian peralatan.
¾ Mempersiapkan peralatan atau mesin untuk tugas pemeliharaan.
¾ Melakukan inspeksi pada peralatan atau mesin.
¾ Melakukan pemeliharaan pada peralatan atau mesin.
Penilaian tempat kerja bagi operator dan petugas pemelihara juga harus
dilakukan.
Penilaian tempat kerja harus dilakukan oleh Penilai Tempat Kerja Workplace
Assessors yang telah terlatih dalam teknik penilaian dan:
o Memiliki pengalaman dalam pemeliharaan atau operasi
peralatan dan mesin yang relevan, atau
o Menggunakan spesialis yang memiliki pengetahuan teknis
yang relevan
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 8 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
Personil harus diberi izin atau otorisasi yang sesuai dengan tanggung jawab
mereka masing-masing menurut Sistem Pengisolasian dan Penguncian.
Setiap Departemen harus membuat daftar atau register, terhadap semua orang
yang diizinkan bekerja menurut Sistem Pengisolasian dan Penguncian.
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 9 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
3. COMMUNICATION AND AWARENESS / KOMUNIKASI DAN KESADARAN BAGI KARYAWAN
Objectives
To ensure all personnel are provided with awareness information regularly on the PT Inco Isolation and Lockout
System.
To ensure regular communication of requirements of the isolation and lockout system is developed and applied
in all Departments.
Tujuan
Meyakinkan bahwa semua orang sudah mendapatkan informasi pemahaman secara reguler mengenai Sistem
Isolasi dan Lockout PT Inco.
Meyakinkan komunikasi reguler mengenai persyaratan sistem isolasi dan lockout sudah dibuat dan diterapkan
di seluruh Departemen.
Outcome Accountability Tool
3.1 General Induction / Induksi Umum PTI EHS
General
All personnel must receive awareness material during their general induction on Manager
the isolation and lockout system utilised at PT Inco.
Semua orang harus mendapat pelatihan pemahaman ketika menerima induksi
umum (GIP) mengenai sistem isolasi dan lockout yang diberlakukan di PT Inco.
3.2 Communication of Isolation and Lockout System Requirements / PTI General
Persyaratan Komunikasi Sistem Isolasi dan Lockout Managers
Communication of Isolation and Lockout System requirements must be provided
on a regular basis to personnel who install, construct, inspect or maintain
equipment and machinery.
The topics must include information on:
1. Critical aspects of isolation and lockout (eg decontamination, release of
stored energy, testing of isolations, isolation points and method).
2. Applicable Isolation Procedures.
Komunikasi mengenai persyaratan Sistem Isolasi dan penguncian harus
diberikan secara berkala kepada semua orang yang memasang instalasi,
konstruksi, nspeksi atau memelihara peralatan dan permesinan.
Topiknya harus mencakup informasi tentang:
1. Aspek penting mengenai isolasi dan penguncian (misalnya: membuang
gas/bahan kontaminasi, melepaskan energi yang tersimpan, test isolasi,
titik isolasi dan metoda pengisolasian).
2. Prosedur Isolasi yang berlaku.
4. SPECIFICATIONS / SPESIFIKASI
Objectives
To define requirements for the creation and maintenance of an Equipment Isolation Procedures Register in each
Department.
To define the design and purchasing specifications for all equipment and machinery to meet isolation system
requirements.
To define the purchasing specifications for isolation system devices and aids.
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 10 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
To require adherence to the Minister of Mines and Energy Decree Kep\men\555 article 188.
Tujuan
Menjabarkan persyaratan bagi pembuatan dan pemeliharaan Register Prosedur Isolasi Peralatan di setiap
Departemen.
Menjabarkan spesifikasi design dan pembelian peralatan dan permesinan agar memenuhi persyaratan sistem
isolasi.
Menjabarkan spesifikasi pembelian alat dan alat bantu sistem isolasi.
Mempersyaratkan ditaatinya Keputusan Menteri Pertambangan dan Energi Kep\men\555 pasal 188.
Outcome Accountability Tool
4.1 Isolation Documents Register / Daftar Dokumen Pengisolasian PTI General PT Inco
Managers Department
All Isolation Checklists and/or Procedures for equipment and machinery shall be Equipment
recorded in an Isolation Documents Register in each Department that shall be Isolation
kept up to date and accessible. Procedure
Register
Semua Prosedur dan/atau Daftar Pengisolasian untuk peralatan dan mesin
harus dicatat dalam Daftar Dokumen Pengisolasian di setiap Departemen, dan
harus selalu diperbarui dan dapat diakses.
4.2 Design and Purchasing Specifications / Spesifikasi Design dan General
Pembelian Manager SES
Design and/or purchasing specifications must be available for all installations,
equipment and machinery that will require isolation and lockout.
Spesifikasi desain dan/atau pembelian harus tersedia untuk semua instalasi,
peralatan dan mesin yang akan memerlukan pengisolasian dan penguncian.
4.3 Purchasing Specifications for Isolation Locks / Spesifikasi General
Pembelian Kunci untuk Isolasi Manager SCM
Purchasing specifications for isolation locks must ensure:
1. The master series lock has series keys available.
2. Personal locks are designed so that they can only be unlocked by the key
that is issued with that lock.
Spesifikasi pembelian untuk kunci-kunci isolasi harus mampu meyakinkan:
1. Seri Kunci Master memiliki seri kunci-kunci yang tersedia.
2. Kunci personal dirancang sedemikian sehingga hanya dapat dibuka oleh
anak kunci yang dibeli bersama-sama kuncitersebut.
4.4 Purchasing Specifications for Tags / Spesifikasi Pembelian untuk General
Label Manager SCM
Purchasing specifications for tags must ensure:
1. All tags can be attached directly to the lock by means of a reinforced
eyelet and by string or other form of temporary attachment aid.
2. All tags are made with the following qualities;
¾ Fade resistant.
¾ Chemical resistant.
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 11 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
¾ Ability to be written on, or
¾ Ability to have a photo included to identify owner (personal danger tag).
¾ Created with all writing in Bahasa Indonesian on the front and English
on the reverse side.
3. All tags must be durable, not less than 60 x 120 mm in size and be
provided with a reliable means of attachment either via a padlock or string,
cord or other connector.
Purchasing specifications for isolation tags must comply with EHS Standard
Procedure SP09 – Isolation and Lockout - Section 4.
Spesifikasi pembelian label pengisolasian harus mengikuti Prosedur Standar
EHS SP09 – Isolasi dan Penguncian - Bagian 4.
4.5 Purchasing Specifications for Isolation Devices / Spesifikasi General
Pembelian Alat Isolasi Manager SCM
Purchasing specifications for isolation devices must ensure:
1. That availability for an adjustable physical barrier on all isolations is
provided.
2. Lock boxes and Permit Control Boards are designed fit for purpose.
3. All Isolation Devices are made with the following qualities;
¾ Fade resistance.
¾ Chemical resistance.
¾ Ability to accept attachment of a lock.
¾ Ability to adjust to fit various isolation needs for differing valves,
switches etc.
Purchasing specifications for isolation devices must comply with EHS Standard
Procedure SP09 – Isolation and Lockout – Sections 5 and 6.
Spesifikasi pembelian alat isolasi harus mampu meyakinkan:
1. Ketersediaan suatu perlindungan fisik yang dapat disetel pada isolasi
yang tersedia.
2. Kotak kunci dan Papan Kendali Permit dirancang cocok untuk tujuan itu.
3. Alat Isolasi harus terbuat dari bahan dengan kualitas sebagai berikut:
¾ Tahan terhadap pemudaran.
¾ Tahan terhadap bahan kimia.
¾ Dapat diikatkan pada kunci.
¾ Dapat di-setel agar cocok dengan berbagai kebutuhan isolasi,
valve/katup yang berbeda-beda, sakelar (switch) yang berbeda-beda.
Spesifikasi pembelian alat pengisolasian harus mengikuti Prosedur Standar EHS
SP09 – Isolasi dan Penguncian – Bagian 5 dan 6.
4.6 Minister of Mines and Energy Regulations / Peraturan Menetri PTI General
Pertambangan dan Energi Managers
The design and/or purchasing specifications relating to Isolation and Lockout
system requirements of equipment and machinery meet the requirements of the
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 12 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
Mines and Energy Ministers Decree:
Kep\men\555 – Decree of Mines Article 188;
(1) Appropriate equipment shall be provided to cut off the electrical circuit
current to and from any electrical equipment which will ensure the
separation of any electrical equipment form the source of electricity, and
shall include appropriate methods of identifying circuits.
(2) The requirements of paragraph (1) shall not apply to electrical equipment
which is itself a source of electrical energy, however adequate safety
measures shall be taken to prevent any danger.
(3) Apart from circuit breaker switches, each electrical appliance shall have a
local means of isolating all parts of the circuit of that appliance. The high
and low voltage sides of a transformer shall be equipped with its own
independent means of isolation.
(4) Any branch of an electrical system shall be fitted with isolating switches in
order that the branch can be isolated from the main system.
Spesifikasi design dan pembelian yang berkaitan dengan persyaratan Sistem
Isolasi dan Lockout bagi peralatan dan permesinan harus memenuhi
persyaratan yang dinyatakan dalam Keputusan Menteri Pertambangan dan
Energi:
Kep\men\555 – Keputusan Menteri Pasal 188;
(1) Alat yang sesuai harus tersedia, untuk pemutus arus listrik ke dan dari
setiap peralatan listrik yang dapat memutuskan hubungan peralatan
listrik dari setiap sumber tenaga listrik, termasuk cara kerja yang sesuai
untuk mengidentifikasi sirkuit listrik tersebut.
(2) Ketentuan sebagaimana dimaksud dalam ayat (1) tidak berlaku untuk
peralatan listrik yang juga menjadi sumber tenaga Iistrik, namun harus
diambil tindakan pengamanan yang sesuai untuk mencegah bahaya.
(3) Selain sakelar pemutus arus, setiap peralatan listrik harus dilengkapi
dengan alat pemisah arus sendiri yang lokasinya dekat dengan
peralatan tersebut. Pada sisi tegangan tinggi maupun tegangan rendah
dari transformer harus mempunyai alat pemisah arus tersendiri.
(4) Di setiap pencabangan pada sistem kelistrikan, sakelar pemisah harus
dipasang sehingga bagian cabang dapat dipisahkan tersendiri dari sistem
sakelar pemisah utama (main switch).
5. WORK METHOD AND CONDITION CONTROL / METODE KERJA DAN PENGENDALIAN KONDISI
Objectives
To define the Isolation System to be applied at PT Inco.
To define the isolation documents that are used at PT Inco.
To ensure all isolations are positive (physical break or barrier to the release of energy).
To define the application of isolation and lockout at PT Inco.
To require adherence to the Minister of Mines and Energy Decree Kep\men\555 article 190.
Tujuan
Translate
Translate
Translate
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 13 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
Translate
Mempersyaratkan dipatuhinya Keputusan Menteri Pertambangan dan Energi Kep\men\555 pasal 190.
Outcome Accountability Tool
5.1 Isolation and Lockout System / Sistem Isolasi dan Lockout General EHS Standard
Manager EHS Procedure 09
The Isolation and Lockout System at PT Inco shall be defined in the EHS – Isolation and
Standard Procedure SP09 – Isolation and Lockout, and shall include the Lockout
following types of isolation:
1. Simple Isolation: This is performed as per EHS Standard Procedure 09 –
Isolation and Lockout – Section 8 – Simple Isolation
2. Complex Isolation: This is performed as per EHS Standard Procedure 09
– Isolation and Lockout - Section 9 – Complex Isolation.
NOTE: Each type of isolation has different requirements and a competent and
authorised person shall determine which type is appropriate to each task for
work performed on all equipment and machinery.
Sistem Pengisolasian dan Penguncian di PT Inco harus ditetapkan dalam
Prosedur Standar EHS SP09 – Isolasi dan Penguncian, dan harus memasukkan
jenis pengisolasian berikut:
1. Pengisolasian Sederhana: Pengisolasian ini dilakukan menurut Prosedur
Standar EHS 09 – Isolasi dan Penguncian– Bagian 8 – Pengisolasian
Sederhana
2. Pengisolasian Kompleks: Pengisolasian ini dilakukan menurut Prosedur
Standar EHS 09 – Isolasi dan Penguncian– Bagian 9 – Pengisolasian
Kompleks.
CATATAN: Setiap jenis pengisolasian mempunyai persyaratan yang berbeda
dan orang yang berkompeten dan telah mendapat otorisasi harus menentukan
jenis mana yang tepat untuk setiap tugas untuk pekerjaan yang dilakukan, pada
setiap peralatan dan mesin.
5.2 Isolation Documents / Dokumen Pengisolasian PTI General EHS Standard
Managers Procedure 09
Isolation requirements shall be determined based on the risk assessment (See – Isolation and
Section 1.1) and documented within the required Isolation Documents. This shall Lockout
be done in accordance with Section 7 - Isolation Documents of SP09 Isolation &
Lockout, including:
1. Isolation Procedures
¾ Department based Isolation Procedures that may contain a checklist to
define and record correct isolation procedures have been applied.
2. Isolation Checklists
¾ An Isolation Checklist is used to detail and control the isolations that need
to be implemented when a Complex Isolation is conducted.
3. Approved Work Procedures
¾ Refers to a documented work procedure that has been approved to guide
persons to undertake hazardous work safely, including all relevant risk
controls identified within the corresponding risk assessment.
¾ Includes Standard Operating Procedures (SOPs), Work Instructions (WIs)
and Job Safety Analyses (JSAs).
Where generic equipment exists (eg mobile equipment) a generic Isolation
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 14 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
Documents for the equipment type shall be recorded, however where generic
equipment is fixed as part of a broader process (eg screening station conveyors)
the individual Isolation Documents for the equipment shall be recorded.
The relevant Isolation Documents must be made available to all personnel who
are required to perform isolations.
Persyaratan pengisolasian harus ditentukan berdasarkan penilaian risiko (Lihat
Bagian 1.1) dan harus didokumentasikan dalam Dokumen Pengisolasian yang
ditetapkan. Hal ini harus dilakukan sesuai dengan Bagian 7 - Dokumen
Pengisolasian SP09 Isolasi & Penguncian, termasuk:
1. Prosedur Pengisolasian
¾ Prosedur Pengisolasian per departemen, yang berisi daftar untuk
menentukan dan mencatat prosedur pengisolasian yang benar dan yang
telah diterapkan.
2. Daftar Pengisolasian
¾ Daftar Pengisolasian digunakan untuk memperinci dan mengontrol
pengisolasian yang perlu dilaksanakan ketika Pengisolasian Kompleks
dilakukan.
3. Prosedur Kerja yang Telah Disetujui
¾ Lihatlah prosedur kerja yang telah disetujui dan yang telah
didokumentasikan, untuk memandu orang dalam melakukan pekerjaan
berbahaya dengan aman, termasuk semua tindakan pengendalian risiko
yang relevan, yang telah teridentifikasikan dalam penilaian risiko.
¾ Termasuk Standard Operating Procedures (SOP/Prosedur Kerja
Standar), Work Instructions (WI/Instruksi Kerja) dan Job Safety Analyses
(JSA/Analisis Keselamatan Kerja).
Jika terdapat peralatan generik (misalnya alat berat) maka Dokumen
Pengisolasian generik untuk jenis peralatan tersebut harus dicatat, namun jika
peralatan generik itu ditentukan sebagai bagian dari proses yang lebih luas
(misalnya konveyor stasiun penyaringan) maka Dokumen Pengisolasian khusus
untuk peralatan tersebutlah yang harus dicatat.
Dokumen Pengisolasian yang relevan harus disediakan bagi semua personil
yang harus melakukan pengisolasian.
5.3 Achieving and Securing Positive Isolations/ Mewujudkan dan PTI General
Mengamankan Pengisolasian yang Positif Managers
All isolations at PT Inco must be positive (physical break or barrier to the release
of energy), locked, tagged and tested in accordance with the EHS Standard
Procedure SP09 – Isolation and Lockout.
Semua pengisolasian di PT Inco harus bersifat positif (penghalang fisik atau
penahan pelepasan energi), dikunci, diberi label dan diuji sesuai dengan
Prosedur Standar EHS SP09 – Isolasi dan Penguncian.
5.4 Application of Isolation and Lockout / Aplikasi Isolasi dan PTI General PT Inco
Penguncian Managers Department
Equipment
For equipment isolation EHS Standard Procedure SP09 – Isolation and Lockout, Isolation
shall be followed, as well as, the relevant Isolation Documents. Register.
In particular:
¾ Isolation shall always be applied to the energy sources and not rely on
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 15 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
control circuitry.
¾ Push buttons, stop switches, interlocks, emergency stops, pilot circuitry
lanyards etc shall not be used as a means of isolation.
¾ The Permit Control Board shall be used to house the permits and
associated documentation and provide a means to secure the isolation
key(s) in a lockable box.
¾ Appropriate Isolation Devices shall be used to secure isolation points
such that they can not be re-energised whilst isolated and locked out.
¾ Isolation Tags shall be applied in accordance with Section 4 – Isolation
Tags of EHS SP09 – Isolation and Lockout.
¾ Isolation Locks shall be applied in accordance with Section 5 – Isolation
Locks of EHS SP09 – Isolation and Lockout.
¾ If equipment that has energies isolated requires testing, jogging or re-
positioning during the progress of the work, the process will be followed
as outlined in Section 10 – Testing Program of EHS SP09 – Isolation and
Lockout.
Dalam hal pengisolasian peralatan, Prosedur Standar EHS SP09 – Isolasi dan
Penguncian, harus diikuti bersama dengan Dokumen Pengisolasian lain yang
relevan.
Khususnya:
¾ Pengisolasian harus selalu diterapkan pada sumber energi dan tidak
tergantung pada komponen sirkuit kontrol.
¾ Tombol tekan, saklar penghenti, kunci interlock, penghenti darurat,
lanyard komponen sirkuit pengemudi, dll tidak boleh digunakan sebagai
alat pengisolasian.
¾ Papan Kontrol Surat Izin harus digunakan untuk menempatkan surat ijin
dan dokumentasi terkait dan menyediakan alat untuk mengamankan
kunci pengisolasi dalam kotak yang dapat dikunci.
¾ Alat Pengisolasi yang tepat harus digunakan untuk mengamankan titik
pengisolasian sehingga tidak dapat terisi energi kembali saat diisolasi
dan dikunci.
¾ Label Pengisolasian harus digunakan sesuai dengan Bagian 4 – Label
Pengisolasian EHS SP09 – Isolasi dan Penguncian.
¾ Kunci Pengisolasian harus digunakan sesuai dengan Bagian 5 – Kunci
Pengisolasian EHS SP09 – Isolasi dan Penguncian.
¾ Apabila peralatan yang telah terisolasi dari energi memerlukan pengujian,
atau perubahan posisi selama perkembangan pekerjaan, prosesnya akan
mengikuti seperti yang dijabarkan dalam Bagian 10 – Program Pengujian
EHS SP09 – Isolasi dan Penguncian.
5.5 Decree of the Minister of Mines and Energy / Keputusan Menteri PTI General
Pertambangan dan Energi Managers
All work method controls relating to the isolation and lockout of equipment and
machinery must meet the following requirements from the Indonesian Mines and
Energy regulations.
Kep\men\555 – Decree of Mines Article 190 Precautionary Measures Prior to
Working on Deactivated Equipment.
“Prior to working on or working close to any electrical equipment that has been
turned off (deactivated), precautionary measures shall be taken such as locking
the main switch and following the stipulations laid down by the electrical
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 16 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
technician”.
Semua metoda kerja yang dipergunakan untuk mengendalikan isolasi dan
penguncian suatu peralatan dan permesinan harus memenuhi persyaratan yang
tertulis dalam peraturan perundang-undangan Pertambangan dan Energi
Republik Indonesia.
Kep\men\555 – Keputusan Menteri Pertambangan Pasal 190 Tindakan
Pencegahan Sebelum Mengerjakan Peralatan Listrik Yang Telah Dimatikan.
Sebelum mengerjakan atau bekerja di dekat peralatan listrik yang sudah
dimatikan, tindakan pencegahan harus dilakukan dengan mengunci sakelar
utama dan memperhatikan ketentuan yang ditetapkan oleh teknisi listrik.
6. MAINTENANCE / PEMELIHARAAN
Objectives
To require that a maintenance program is established in all Departments to ensure the ability to isolation and
lockout all equipment and machinery is maintained.
Tujuan
Mempersyaratkan bahwa program pemeliharaan sudah ditetapkan di semua Departemen untuk meyakinkan
kemampuan isolasi dan lockout terhadap seluruh peralatan dan permesinan tersebut dipelihara.
Outcome Accountability Tool
6.1 Maintenance Program / Program Pemeliharaan PTI General
Managers
The PT Inco maintenance program in all departments shall ensure that:
1. All fixed and mobile, equipment and machinery identified in the risk
assessment have lockable isolation points installed, or a physical means
to prevent an uncontrolled release of energy.
2. All isolation and lockout test equipment is maintained according to the
manufacturer’s specifications.
Isolation and lockout equipment shall be maintained in a fit for purpose condition
which includes;
¾ Isolation points, switches, valves or circuit breakers,
¾ Locks, keys, multiple lockout devices (scissor locks and lock boxes).
Program pemeliharaan PT Inco di semua Departemen harus mampu
meyakinkan:
1. Semua peralatan dan permesinan yang dipasang tetap atau berpindah-
pindah tempat yang teridentifikasi dalam penilaian risiko sudah
mempunyai titik isolasi yang dapat dikunci, atau sarana fisik untuk
mencegah pelepasan energi secara tidak terkendali.
2. Semua alat isolasi dan lockout test dipelihara sesuai dengan spesifikasi
pabrik pembuatnya.
Peralatan pengisolasian dan penguncian harus dipelihara dalam kondisi sesuai
untuk tujuannya yang termasuk;
¾ Titik pengisolasian, saklar, katup atau pemutus sirkuit.
¾ Gembok, kunci, alat penguncian majemuk (gembok gunting dan kotak
gembok).
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 17 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
7. EMERGENCY CONTROLS / PENGENDALIAN KEADAAN DARURAT
Objectives
1. To require all work under permits to be suspended during an emergency evacuation.
2. To define the authority of the Fire and Emergency Services personnel outside the PT Inco Isolation System
during an emergency.
Tujuan
Mempersyaratkan semua pekerjaan dibawah permit harus ditunda selama evakuasi darurat.
Menjabarkan kewenangan petugas Fire and Emergency Services di luar Sistem Isolasi PT Inco selama situasi
darurat.
Outcome Accountability Tool
7.1 Emergency Evacuation / Evakuasi Darurat PTI General
Managers
Should a general emergency evacuation occur during the normal process of
work, all work shall cease and work permits shall be suspended.
The Permit Authoriser must perform a complete check of all isolations and permit
conditions to ensure the work is safe to continue after the emergency.
Seandainya terjadi evakuasi darurat umum selama proses normal suatu
pekerjaan, maka semua pekerjaan harus dihentikan dan work permit harus
ditangguhkan/ditunda.
Permit Authoriser harus melakukan pemeriksaan menyeluruh terhadap semua
isolasi dan kondisi permit untuk meyakinkan bahwa pekerjaan itu sudah aman
dilanjutkan setelah situasi darurat berakhir.
7.2 Fire and Emergency Services / Pelayanan Darurat Kebakaran General
Manager EHS
In the event of an emergency where access to equipment
1. Controlled by a permit is required,
2. No current isolation or other control is in place,
The Fire and Emergency Services (FES) shall apply a FES Emergency Isolation
Tag.
Refer to EHS Standard Procedure 09 – Isolation and Lockout – Section 4.5 FES
Emergency Isolation Tags.
Dalam keadaan darurat dimana akses ke suatu peralatan:
1. Dikendalikan oleh permit tersebut menjadi keharusan.
2. Tidak ada isolasi atau kendali lain yang berlaku.
Fire and Emergency Services (FES) harus memasang label FES Isolasi Darurat
(FES Emergency Isolation Tag).
Lihatlah Prosedur Standard EHS 09 – Isolasi dan Penguncian – Label
Pengisolasian Darurat FES Bagian 4.5.
8. MONITORING, INSPECTIONS AND AUDITS / PERMANTAUAN, INSPEKSI DAN AUDIT
Objectives
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 18 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
To require the auditing of compliance to this Standard.
To ensure equipment and machinery isolation surveys are reviewed on a regular basis.
To require a routine audit and inspection program to be conducted in all departments to establish the level of
compliance to the PT Inco Isolation System.
Tujuan
Meyakinkan audit terhadap dipatuhinya standar ini.
Meyakinkan survey terhadap isolasi peralatan dan permesinan dikaji ulang secara berkala.
Mempersyaratkan suatu program audit rutin dan inspeksi rutin dilaksanakan di semua departemen untuk
menentukan level pematuhan terhadap Sistem Isolasi PT Inco ini.
Outcome Accountability Tool
8.1 Auditing / Audit General Major Hazard
Manager EHS Standard Audit
Audits must be performed to assess compliance with this Standard as per an Schedule
approved audit schedule.
Audit harus dilakukan untuk menilai ditaatinya Standar ini sesuai dengan jadwal
audit yang sudah disetujui.
8.2 Equipment and Machinery Surveys / Pemeriksaan Peralatan dan PTI Area PT Inco
Mesin General Department
Managers Equipment
All isolations for equipment and machinery shall be audited on an annual basis Register
to determine the status of all isolation devices and to ensure that all installations
have lockable isolation points.
Semua isolasi untuk peralatan harus diaudit setiap tahun untuk menentukan
status dari seluruh alat isolasi dan untuk meyakinkan bahwa semua instalasi
sudah mempunyai titik isolasi yang dapat dikunci.
8.3 Audits of Isolation System Application / Audit terhadap Penerapan PTI Area Monthly EHS
Sistem Isolasi General Reporting
Managers
All departments shall conduct routine checks and audits to establish compliance
to the isolation system requirements within their Department.
The isolation system checks and audits shall include:
1. Checking of Simple Isolations conducted under a SOP by a Senior
Supervisor monthly
2. Checking of Complex Isolations conducted under approved
documentation (Isolation Procedure, SOP, etc) by Superintendent
monthly
All checks and audits shall be recorded and deficiencies reported to the General
Manager. Corrective actions shall be recorded and closed out as a matter of
priority with all records kept for 12 months minimum.
Semua departemen harus melaksanakan pemeriksaan dan audit rutin untuk
membangun kepatuhan terhadap persyaratan sistem pengisolasian dalam
Departemen mereka sendiri.
Pemeriksaan dan audit sistem pengisolasian harus termasuk:
1. Pemeriksaan Pengisolasian Sederhana yang dilaksanakan menurut SOP
oleh Pengawas Senior (Senior Supervisor) setiap bulan.
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 19 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
2. Pemeriksaan Pengisolasian Kompleks yang dilaksanakan menurut
dokumentasi yang tleah disetujui (Prosedur Pengisolasian, SOP, dll) oleh
Superintendent setiap bulan.
Semua pemeriksaan dan audit harus dicatat dan penyimpangannya dilaporkan
kepada General Manager. Tindakan perbaikan harus dicatat dan diselesaikan
sebagai suatu prioritas, dan semua catatan disimpan minimal selama 12 bulan.
9. REPORTING, ASSESSMENT AND CORRECTIVE ACTIONS / PELAPORAN, PENILAIAN DAN
TINDAKAN PERBAIKAN
Objectives
To require all personnel authorised to isolate equipment and machinery to identify, report, correct and record
equipment hazards.
Tujuan
Mempersyaratkan bahwa semua personil yang berwenang melakukan isolasi terhadap suatu peralatan dan
permesinan harus mengidentifikasi, melaporkan, mengoreksi dan mencatat bahaya-bahaya dari suatu
peralatan.
Outcome Accountability Tool
9.1 Hazards and Defects / Bahaya dan Cacat PTI Area
General
All hazards or defects identified on fixed or mobile, equipment and machinery Managers
must be reported.
If a defect renders the fixed or mobile equipment or machinery unsafe for
operation, it must be put Out of Service by use of a PT Inco - Out of Service Tag
(to prevent unsafe use) placed on the isolation / ignition switch as per the
requirements in section 5.9 of this standard.
Semua bahaya atau kerusakan yang teridentifikasi pada peralatan atau
permesinan yang dipasang tetap atau berpindah-pindah tempat, harus
dilaporkan.
Apabila kerusakan tersebut menyebabkan peralatan tetap atau bergerak
tersebut menjadi tidak aman dioperasikan, maka peralatan tersebut harus
dinyatakan sebagai Tidak Berfungsi (Out of Service) dengan menggunakan
Label Out of Service PT Inco (untuk mencegah pemakaian secara tidak aman)
dan dipasang pada sakelar isolasi / penyalaan sesuai dengan persyaratan
dalam seksi 5.9 standar ini.
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 20 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED
DOCUMENT CONTROL / KONTROL DOKUMEN
Version: Date: Reason for Change:
Versi: Tanggal: Alasan perubahan:
1.1 14/01/2006 Section 9.1 - Changed accountability from “All Personnel” to “PTI Area Managers”
Rationalised inconsistent descriptors for accountabilities. (eg. All Managers, All PTI
1.2 19/05/2006 Managers and Relevant Managers were changed to PTI Managers to be consistent
descriptors in all standards) Note: No actual accountability was changed.
Revised to include reference to EHS Standard Procedure 09 - Isolation and Lockout,
1.3 14/04/2007 remove duplication in Standard Procedure and MHS and update Attachements.
Revision in section 2.2
Relevant operational experience was changed to Possessing relevant area, operational or
system experience.
1.4 01/08/2007
Successfully completed a recognised risk assessment training course was changed to
Having 2 or more people trained in PTI Risk Assessment (SP01) and nominated by their
manager as competent in this role.
Section 6.1: “In addition, all isolation and lockout equipment shall be maintained in a fit for
1.5 06/11/2007 purpose condition” – re-worded to now show that this equipment does not have to be part
of a maintenance program.
Section 1.1 reworded to highlight the scope of the MHS – risk assessments on equipment
that is being maintained, inspected, etc, not all equipment.
Extensive review and revision to remove procedural items after release of EHS Standard
Procedure 09 – Isolation and Lockout. There was extensive revision of Elements 3, 4 and
5 with rewording of objectives based on the SP and removal of procedural requirements
(and objectives) where required. 7.2.
2 August 2008 Section 6.1 reworded to highlight that isolation devices must be maintained fit for use, and
not necessarily part of a formal maintenance system.
Section 8.3 reworded to reflect realistic criteria for auditing and inspections.
Section 2.3 revised to reflect new training and competency requirements.
Sections 2.4 and 2.1 incorporated into section 2.3 (now 2.2) and revised to reflect new
workplace assessor requirements
EHS Standard Originator Date Published
Title: Isolation System PTI EHS August 2008
Page 21 of 21
Ref: EHS/12/STD/MHS/MHS04 Approved by To be reviewed
EHS Management Version: 2 Michael Winship August 2010
System
UNCONTROLLED DOCUMENT WHEN PRINTED