0% found this document useful (0 votes)
381 views5 pages

Erection of Air Cooler

Erection of Air cooler

Uploaded by

Yusuf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
381 views5 pages

Erection of Air Cooler

Erection of Air cooler

Uploaded by

Yusuf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 5
3 Spiro-Gills Simei ad ‘Sralbene Road Std S63 Preparation for Shipping Storage & Erection of Air Cooled Heat Exchangers SGL Contract No: Document Ref No: Customer: Purchase Order No: Project Title: Item Ref: rdmenis: 1705680 1705680 GP 13 Prepatation for Shipping, Storage & Erection of Aie Cooled Heat Exchangers Influit PO140970 Rundown BI-HC-21-1074/B Tssucd for elfen review Fappeoval Orsi Chest Approved Date SY Procedure G/P 13 ‘Comet 17-45650 Preparation for Shipping Storage & | Poxutuc Gi) Revd Spiro-Gills | Erection of Air Cooled Heat Exchangers Redes Lube Bundle Assembles 9) Srte Coating trials wil have suis costing as specified nthe contact refer to FOSS9-131-D120-001-01-PM- oat 1 Pes Testing & Presraton (0388 35.F120-SPC-002 Rev RI): 1) Shop preset areced oi tthe apeoved procedure PS59-131-D120-00-01-04-001 1} Niuogsn Purging sof Oxygen Pee Nios inode to apeosinataly 0 burg. & small al ‘ag indicates the pressure eines Nous: "AT Norze cvs ote openings are banked af As minimum lange faces re preted witha ust preventive ruber plist or wood cover & sealed wih wero tpe. Ste cave canbe sed & ket tel eovers whee the ntnas have Bee le wth ner zs Export Peking "The ube bundle queso further poking othe san the Wiopen Pure inetd above, Pa work 2) Structural steelworks lt dipped yavanised to BS 14612008, 5) Boltng pan savaned ©} Loose scemork will bebanded onto stable nb sing handing saps (pe para 8.1.10 & amd ks ented agaist th master Packing List ‘S=Mesanials 1) Flere Motors: Motor baie are costed tothe manuf std Motor bearings ae pote for tanepr bythe manufacturer but fal commissioning checks, Facing ressing of earings tbe performed nine With the manufatrersinsuctons before startup. Entei machined sraes (shaft extension wil be ame with ust preventative & Terminal ens Motors wl be supple mounted within the fan bid, ans: Fans wil be rmoved fom he an ngs foc transport, Hubs wil main ited. ©) Louvers Pants: ‘Parc fe aluminium wih pln besrlags. Paes ae supple ited to buds excep where “dal wine we removed oat ing orev ube are upp lose for Siting at st Noung breckes wn pane connectors ae packed wih seluarsuansdue. 1 Spares: ‘Commisioning spars comprising phigs and gaskets are spied boxed and polythene wrapped Anviv se 1 =Damage: ‘Any damage o missing ems must reported ammedel t Spills Thermal Products Li or ‘eating: 2) Banas & Modules ar provide with suitable iting points 1} Dono tempt to it wodatarsed hes exchangers using the bundle Ming po ‘Waring noe te seniled athe bade ing pons, ‘When lifting buds othe Module use the iting quprent supped withthe entre, Se ing Parameters envi 7568020. Petes packs se st fr iting by FLT C:Storage at Site (deere ection Generale 1) Equipment mst be stron ve round, lowing adequate i cireaation rund he ites HTnmenary the stomge ren shoul be reid with bcc to preven growth of vegetation in tube fing o loo stel work 1 is impotat that both bus & module seins ae handle, sored & always hep evel 0 peven Adsoton «Al prs should be ingecte on eet & regularly thereat fr signs of sto does ‘Rests be nade god by cating epi, ob rappin of rst preventative 3 appropriate Fin drags prt mst Be made good aot 1) Damage to fis shold be made good 1b) lang covers should sn ple at ies, & should ot he etoved uti piping is come ©) Where bundles have bee ill wih ret as, check gape for gs presse & top UP as Hes fo spproxinatly 0.3 bar at) Store wih adegut shor ng sid sper to ensue adequate irclation of i abun pus ‘S-Mechanicas ‘Asters ae a side lt ined ont the mak sings. motor sas arable tbe tated in ie ‘pits oes roaion on 3 to month eee Procedure G/P 13 commce: 48680 Preparation for Shipping Storage & | Prosi GPI3 Revo Spiro-Gills | _ rrection of Air Cooled Heat Exchangers Puedes Dz After Erection (bor somissosins) Contin programe oie above Areva a Ste. 1 Contin programs afr short term storage wp 06 mons. 1) Check nitrogen gs reste a aston every 30 days top upto approx 0 args necessary. «Inspect surfs cotingot headers & state a east once every 80 dys or sins of corsion. ‘Make yond ar equ Check exposed machined races (an shal & ear box hats & pls) Torri Clean off st reapply nt preventive a ele & nisin General, 1) fie sarap, al equipment must be cesked in accrdance with Spoils Thermal Prodvets {id drawings a proces submited. ') Aer omnssoning ll pas shouldbe regularly iagpeted visually. The whole mechanical System sould be nese and fas tan at spec for 3 hous every 30 day. Procedure G/P 13 Contac 1.05600 Preparation for Shipping Storage & | Proce P13 Revo Spiro-Gills | Erection of Air Cooled Heat Exchangers pense Di: Lifting & Handling A=Tube ands: 1) Refer fo Spiros Ld iin rams deawing CLS-FC-MENO-CO6-000, se sestinn Be 2

You might also like