Spiro-Gills
Simei ad
‘Sralbene Road Std S63
Preparation for Shipping Storage &
Erection of Air Cooled Heat Exchangers
SGL Contract No:
Document Ref No:
Customer:
Purchase Order No:
Project Title:
Item Ref:
rdmenis:
1705680
1705680 GP 13
Prepatation for Shipping, Storage &
Erection of Aie Cooled Heat Exchangers
Influit
PO140970
Rundown
BI-HC-21-1074/B
Tssucd for elfen review Fappeoval
Orsi
Chest
Approved
DateSY Procedure G/P 13 ‘Comet 17-45650
Preparation for Shipping Storage & | Poxutuc Gi) Revd
Spiro-Gills | Erection of Air Cooled Heat Exchangers Redes
Lube Bundle Assembles
9) Srte Coating
trials wil have suis costing as specified nthe contact refer to FOSS9-131-D120-001-01-PM-
oat
1 Pes Testing & Presraton (0388 35.F120-SPC-002 Rev RI):
1) Shop preset areced oi tthe apeoved procedure PS59-131-D120-00-01-04-001
1} Niuogsn Purging sof Oxygen Pee Nios inode to apeosinataly 0 burg. & small al
‘ag indicates the pressure eines
Nous:
"AT Norze cvs ote openings are banked af As minimum lange faces re preted witha
ust preventive ruber plist or wood cover & sealed wih wero tpe.
Ste cave canbe sed & ket tel eovers whee the ntnas have Bee le wth ner zs
Export Peking
"The ube bundle queso further poking othe san the Wiopen Pure inetd above,
Pa work
2) Structural steelworks lt dipped yavanised to BS 14612008,
5) Boltng pan savaned
©} Loose scemork will bebanded onto stable nb sing handing saps (pe para 8.1.10 & amd
ks ented agaist th master Packing List
‘S=Mesanials
1) Flere Motors:
Motor baie are costed tothe manuf std
Motor bearings ae pote for tanepr bythe manufacturer but fal commissioning checks,
Facing ressing of earings tbe performed nine With the manufatrersinsuctons before
startup.
Entei machined sraes (shaft extension wil be ame with ust preventative & Terminal ens
Motors wl be supple mounted within the fan bid,
ans:
Fans wil be rmoved fom he an ngs foc transport, Hubs wil main ited.
©) Louvers Pants:
‘Parc fe aluminium wih pln besrlags. Paes ae supple ited to buds excep where
“dal wine we removed oat ing orev ube are upp lose for Siting at st
Noung breckes wn pane connectors ae packed wih seluarsuansdue.
1 Spares:
‘Commisioning spars comprising phigs and gaskets are spied boxed and polythene wrapped
Anvivse
1 =Damage:
‘Any damage o missing ems must reported ammedel t Spills Thermal Products Li or
‘eating:
2) Banas & Modules ar provide with suitable iting points
1} Dono tempt to it wodatarsed hes exchangers using the bundle Ming po
‘Waring noe te seniled athe bade ing pons,
‘When lifting buds othe Module use the iting quprent supped withthe entre, Se ing
Parameters envi 7568020.
Petes packs se st fr iting by FLT
C:Storage at Site (deere ection
Generale
1) Equipment mst be stron ve round, lowing adequate i cireaation rund he ites
HTnmenary the stomge ren shoul be reid with bcc to preven growth of vegetation in tube
fing o loo stel work
1 is impotat that both bus & module seins ae handle, sored & always hep evel 0 peven
Adsoton
«Al prs should be ingecte on eet & regularly thereat fr signs of sto does
‘Rests be nade god by cating epi, ob rappin of rst preventative 3 appropriate
Fin drags prt mst Be made good
aot
1) Damage to fis shold be made good
1b) lang covers should sn ple at
ies, & should ot he etoved uti piping is come
©) Where bundles have bee ill wih ret as, check gape for gs presse & top UP as Hes fo
spproxinatly 0.3 bar at)
Store wih adegut shor ng sid sper to ensue adequate irclation of i abun
pus
‘S-Mechanicas
‘Asters ae a side lt ined ont the mak sings. motor sas arable tbe tated in ie
‘pits oes roaion on 3 to month eeeProcedure G/P 13 commce: 48680
Preparation for Shipping Storage & | Prosi GPI3 Revo
Spiro-Gills | _ rrection of Air Cooled Heat Exchangers Puedes
Dz After Erection (bor somissosins)
Contin programe oie above Areva a Ste.
1 Contin programs afr short term storage wp 06 mons.
1) Check nitrogen gs reste a aston every 30 days top upto approx 0 args necessary.
«Inspect surfs cotingot headers & state a east once every 80 dys or sins of corsion.
‘Make yond ar equ Check exposed machined races (an shal & ear box hats & pls)
Torri Clean off st reapply nt preventive a ele
& nisin
General,
1) fie sarap, al equipment must be cesked in accrdance with Spoils Thermal Prodvets
{id drawings a proces submited.
') Aer omnssoning ll pas shouldbe regularly iagpeted visually. The whole mechanical
System sould be nese and fas tan at spec for 3 hous every 30 day.Procedure G/P 13 Contac 1.05600
Preparation for Shipping Storage & | Proce P13 Revo
Spiro-Gills | Erection of Air Cooled Heat Exchangers pense
Di: Lifting & Handling
A=Tube ands:
1) Refer fo Spiros Ld iin rams deawing CLS-FC-MENO-CO6-000, se sestinn Be 2