0% found this document useful (0 votes)
40 views18 pages

Booster Italy

This Operating and Maintenance Manual provides essential information for the safe operation, maintenance, and dismantling of standard and configured pressure booster sets designed for civil, industrial, and agricultural use. It includes sections on safety warnings, technical data, installation, and warranty information, emphasizing the importance of following the instructions to avoid injury and damage. Users are advised to keep the manual accessible and consult it for proper handling and maintenance procedures.

Uploaded by

Vu Dang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views18 pages

Booster Italy

This Operating and Maintenance Manual provides essential information for the safe operation, maintenance, and dismantling of standard and configured pressure booster sets designed for civil, industrial, and agricultural use. It includes sections on safety warnings, technical data, installation, and warranty information, emphasizing the importance of following the instructions to avoid injury and damage. Users are advised to keep the manual accessible and consult it for proper handling and maintenance procedures.

Uploaded by

Vu Dang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

OPERATING AND MAINTENANCE MANUAL  personnel assigned to operating the set, personnel

TO BE STORED CAREFULLY BY THE USER assigned to operating, cleaning and performing ordinary
maintenance;
CONTENTS  personnel assigned to set dismantling.

CONTENTS 2 This manual must be kept in an area where it can be stored as


1. INTRODUCTION 2 well as easily consulted. The company reserves the right to
2. IDENTIFICATION DATA 2 change the supplied technical documentation, if necessary,
3. WARRANTY AND TECHNICAL SUPPORT 2 without updating previously issued documentation.
4. GENERAL SAFETY WARNINGS 3 The instructions were prepared in compliance with Machine
5. TECHNICAL CONSTRUCTION CHARACTERISTICS 3 Directive 2006/42/EC, Annex I, paragraph 1.7.4.
6. TECHNICAL DATA 4
7. HANDLING AND STORAGE 5 THE REPRODUCTION, EVEN PARTIAL, OF THE
8. INSTALLATION 5 ILLUSTRATIONS AND/OR TEXT IS PROHIBITED.
9. ELECTRICAL CONNECTION 6
10. STARTING THE SYSTEM 6 When preparing the instruction manual, the following general
11. MAINTENANCE 7 symbols were used to point out the consequences of failure to
12. DISPOSAL 9 follow the instructions. PAY PARTICULAR ATTENTION TO
13. ATTACHED DIAGRAMS 10 THE SAFETY INSTRUCTIONS.
14. MODEL IDENTIFICATION CODE 18
15. DATA PLATE 19 Risk of damaging the set or the system
16. DECLARATION OF CONFORMITY' 20

1. INTRODUCTION Risk of personal injury or property damage


This manual refers to:

 the following standard pressure booster sets:


Risk of an electrical nature
GP GPE GPS/GPES GPJ/GPEJ

1 1 2. IDENTIFICATION DATA
2 2 2 2
2.1. MANUFACTURER
3 3 3 3 EBARA Pumps Europe S.p.A.
4 4 4 4 Plant management:
Via Torri di confine, 2/1 int. C – 36053 Gambellara (VI),
ITALY
 to the following configured pressure booster sets: 2/3/4 Tel: 0444/706811 - Fax: 0444/405811
pumps. Registered office:
Via Campo Sportivo, 30 - 38023 Cles (TN), ITALY
The sets were designed for civil, industrial and agricultural use. Tel: 0463/660411 - Fax: 0444/405930
The manual contains all the information required to safely
interact with the set over the entire product lifespan (transport, 2.2. DATA PLATE
installation, use, maintenance, dismantling). The instructions See the DATA PLATE chapter.
are completed by the following documentation:
 manuals containing specific information concerning the 3. WARRANTY AND TECHNICAL SUPPORT
electric pumps;
 manual for the control panel (EP/EP-E/SP-EFC/SP-MFC)
FAILURE TO OBSERVE THE INSTRUCTIONS PROVIDED
or the control device (E-DRIVE/E-SPD) and the protection IN THIS INSTRUCTION MANUAL AND/OR ANY WORK ON
panel. THE PRODUCT THAT WAS NOT PERFORMED BY OUR
Carefully read all the documents before starting up the set and
SERVICE CENTRES INVALIDATES THE WARRANTY AND
follow the instructions provided for the correct operation and RELIEVES THE MANUFACTURER FROM ANY LIABILITY
optimal efficiency of the product. For further information, or if IN THE CASE OF ACCIDENTS INVOLVING PERSONNEL
there are questions concerning the correct interpretation of the OR DAMAGE TO PROPERTY AND/OR THE PRODUCT
instructions, contact your closest authorised reseller or service
ITSELF.
centre, specifying the data identifying the set located on the
DATA PLATE.
Once the product is received, check that the outside of the
packaging was not damaged and that there are no significant
This manual is intended for:
dents, otherwise immediately inform the person who made the
 personnel assigned by the manufacturer/distributor delivery. Then, after removing the product from the packaging,
to install the set and perform extraordinary check that it was not damaged during transport; if it was
maintenance, specialised and qualified personnel 1 for damaged, inform the reseller within 8 days of delivery. Then
transport, installation, first start-up and extraordinary check the product plate to make sure that the characteristics
maintenance operations; stated are those you requested.
The warranty shall be voided if:
1
Based on CEI EN 82079-1: “qualified person: an individual with education,
training and/or technical experience that is relevant to the argument that permit
them to understand the risks and avoid hazards that occur while using a product.”

ENGLISH 2
 disassembly or repair operations were performed by Before starting the system, check that
operators not authorised by EBARA Pumps Europe all the electric devices and components,
S.p.A.; including the cables, are correct.
 faulty operation derives from the incorrect installation Do not start up the set with bare feet or,
and/or electrical connection, tampering, improper use or even worse, when standing in water or
use beyond the limits indicated in this manual; with wet hands.
 corrosive liquids, sandy water, chemically or physically The device is not intended to be used by
aggressive liquids were pumped without prior verification people (children included) with reduced
and authorisation by EBARA Pumps Europe S.p.A.; physical, sensory or mental capabilities,
or lack of experience and knowledge
 if alleged defects were reported more than two months unless they have been given instruction
after discovery; concerning the safe use of the
 the alleged defect depends on normal wear following use. equipment and have been made aware
of the hazards connected with it by a
The following parts, which are normally subject to wear, are
person responsible for their safety, or if
covered by a limited warranty: bearings, mechanical seal, seal
they use it under his or her supervision.
rings, condensers, adjustable pressure switch. For the
Children must not play with the device.
warranty covering the various components, refer also to the
relative documents (electric pump, electric panel/control
device/protection panel). 4.2. PROTECTIONS AND SIGNIFICANT PRECAUTIONS
All of the set components have been
For technical support operations on the set, refer to the designed such that the moving parts
MAINTENANCE chapter. have been made harmless through the
use of protective casings. The
4. GENERAL SAFETY WARNINGS manufacturer declines all liability if
damaged is caused as a result of
Before starting up the product, it is very important for the user tampering with these devices. Do not
to know how perform all the operations as described in this repair and/or adjust mechanical
manual and in the other manuals listed in the INTRODUCTION components while the machine is
chapter. operating.
Each conductor or energised part is
4.1.
PREVENTIVE MEASURES BY THE USER electrically isolated from the ground;
Installation, maintenance and repairs there is however a supplementary safety
(mechanical and electric) must be mechanism through which the
performed by specialised and qualified conductive parts are connected to an
ATTENTION
personnel (refer to the definition of earth conductor to ensure that accessible
qualified personnel in the parts do not become hazardous if the
INTRODUCTION chapter). main insulation is damaged.
It is prohibited to tamper with, alter or
modify the set, even partially. 4.3. RESIDUAL RISKS
It is prohibited to use the set in While maintenance is being performed,
conditions or for purposes other than there is the risk of working on moving
those indicated in this manual. parts while the set is operating. Make
sure to disconnect the electrical power
The instructions located on the set that supply before performing any work.
identify hazardous zones and operations While maintenance is being performed,
must not be removed, covered or there is the risk of working on live parts
damaged. while the set is operating. Make sure to
Strictly comply with the accident disconnect the electrical power supply
prevention regulations in force in the before performing any work.
respective countries of installation. Also
carefully observe the regulations
regarding the personal protective 5. TECHNICAL CONSTRUCTION
equipment necessary for the various
operations on the set, referred to in this
CHARACTERISTICS
manual and in the attached documents
relative to the set components. 5.1. DESCRIPTION

Before handling, servicing or repairing Pressure booster sets are automatic systems for supplying
the set or any of its parts, disconnect the water to 1 or more pumps in parallel, for connection to
electrical power supply in order to diaphragm pressure vessels, to tanks with an air cushion, or to
prevent its accidental start-up which a normal water mains. They are used whenever it is necessary
could injure personnel and/or cause to increase pressure or it is necessary to keep a water mains
property damage. pressurised. Drawing water from the connected system, when
the pumps are stopped, causes the pressure to decrease and
Every maintenance, installation or the resulting start of the first pump (or pilot pump for the
handling operation performed on the set GPJ/GPEJ sets). If the pressure drop continues or restoring is
or any of its parts with the electrical not sufficient, the second pump will start, and so on if the set
system energised could cause serious has a second, third and fourth pump (main pumps for the
accidents, also fatal. GPJ/GPEJ sets). The restoration of the pressure in the system
causes the staggered stopping of the pumps. An electronic

ENGLISH 3
device activates the automatic rotation of the starting order of  cooling;
the electric pumps so as to ensure uniform distribution of the  heating;
starting operations, and therefore of the working hours (in sets  irrigation;
with more than one pump).  washing systems.

The standard pressure booster sets are divided into: The treated liquid must be:
 GP: sets that operate with fixed speed pumps;  potable, clean water, rainwater or groundwater, or a
 GPE: sets that operate with variable speed pumps; mixture;
 GPJ/GPEJ: sets that operate with fixed (GPJ) or variable  free of solid or fibre bodies in suspension;
(GPEJ) speed pumps. These differ from the GP/GPE sets  free of aggressive chemical substances;
due to the presence of a pilot pump that starts as the first  at a temperature between 0 and 50°C (EP, EP-E, SP-
pump to take care of small pressure losses from the EFC, SP-MFC, E-Drive, E-SPD control system).
system, therefore preventing the start of the main pumps
(which are generally larger with a greater consumption The installation environment must:
than the pilot pump);  be covered and protected against the adverse weather
 GPS/GPES: sets that can operate with fixed (GPS) or conditions and frost;
variable (GPES) speed pumps. These sets can have  have an ambient operating temperature between 0 and
dimensioned conductors to have a system pump that is 40°C;
inactive (in stand-by).  be at a maximum altitude of 1000 m above sea level;
 have a max. relative humidity of 50% at +40°C.
Similar to these are the configured pressure booster sets with
2/3/4 pumps that have the same control system and pumps as
NB: The sets are designed to operate with a positive head.
the standard ones mentioned above.
If you decide to operate the set with a negative head,
remember that the suction height decreases as the altitude
The control systems for the sets are divided based on if there
and temperature increase. These characteristics, in function
is an inverter or not, i.e. a frequency variator that makes it
of the NPSH of the set, must be kept in consideration when
possible to vary the pump speed, and on the type of inverter.
dimensioning a system in order to avoid cavitation or
They are:
insufficient performance: The NPSH available for the system
must be greater than the NPSH required by the set.
 EP control panel: for the actuation of the single-phase or
three-phase pumps at a fixed speed, controlled by Given the set's inlet pressure and the maximum pump head,
pressure switches; make sure not to exceed the maximum outlet pressure
 EP-E control panel: for the actuation of the single-phase permitted for the relative pump.
or three-phase pumps at a fixed speed controlled by a
transducer (one transducer for the entire set); 5.4. UNINTENDED USE
 SP-EFC control panel: for the actuation of the three- Improper product use could cause
phase pump with the first pump at a variable speed, and hazardous conditions as well as
the others, cascading, at a fixed speed; personal injury and/or property damage.
 SP-MFC control panel: for the actuation of the three- Unintended product use can invalidate
phase pump at a variable speed; the warranty.
 E-Drive inverter: installed on the motor for the actuation The sets cannot be used for:
of the three-phase pump at a variable speed;  pumping dirty water;
 E-SPD inverter: installed on the motor for the actuation of  pumping water with solid particles in suspension;
the three-phase pump at a variable speed.  pumping corrosive liquids or liquids with acid substances;
 pumping liquids at a temperature above 50°C;
For details concerning the operation of each panel/device, see  pumping seawater;
the dedicated supplementary manual.  pumping inflammable/explosive liquids;
 installation outside without protection against atmospheric
Note: sets with an E-drive and E-SPD control device have a agents or frost;
MASTER pump (the first pump to the left when viewing the set  operating without liquid;
from the panel side), whose inverter controls the activation  operating in ATEX environments.
sequence of all pumps.
For special applications that are not included in the Intended
The sets can be equipped with the following types of pump: use chapter, contact our technical office.
AGA/CDX/2CDX/2CD/CDA/CMA/CMB/COMPACT
/CVM/MATRIX/MD/MMD/EVM/EVML/EVMG/EVMS/EVMSL/E
VMSG/3M/3LM/3S/3LS/3D/3DS/3P/3LP/3DP/GS.
6. TECHNICAL DATA
5.2. COMPONENTS
The pressure booster sets are shown in the diagrams in fig. A The manufacturer reserves the right to
in the ATTACHED DIAGRAMS chapter. make changes to the technical data to
ATTENTION
The code identifying the models is described in the MODEL make improvements and updates,
IDENTIFICATION CODE chapter. without prior notice.

5.3. INTENDED USE 6.1. SET DATA PLATE


The sets are intended for civil, industrial and agricultural For the data plate, see the DATA PLATE chapter.
applications in particular for:
 lifting or pumping water;

ENGLISH 4
6.2. COMPONENT TECHNICAL DATA use pipes with a section suitable for lifting and to pay
For the technical data for the single components (electric attention when fastening the lifting belts to prevent the set
pumps, control panels or control devices and protection panel) from falling. For their movement, take the weight indicated
see the relative attached documents. on the pallet into account. Do not anchor on pumps,
motors, manifolds or other accessories. Make sure that
6.3. INFORMATION ABOUT AIRBORNE NOISE the set is firmly fixed to the provided lifting points before
performing the lifting and moving operations.
The noise levels of the pressure booster set are obtained Blows, falls or swinging must be avoided, which could cause
starting from the sound levels emitted by the single main non apparent damage. Do not stand near the set while lifting,
electric pump, which can be found in its operating and handling or setting it down.
maintenance manual, adding the values indicated in the
following table (applicable for 50 and 60Hz): 7.2. STORAGE
By sound pressure level is meant the mean value of the To maintain the full efficiency of the set:
measurements taken at a distance of 1 m from the set in a free  store the product in a covered and dry location away from
field. For the noise value tolerance, refer to the manual of the heat sources and protected against impacts, dirt and
single main electric pump, as it is the main source of noise. vibrations;
 do not place heavy objects on the packaging;
Standard set
Configured LpA LWA  store the product at an ambient temperature between
set dB(A) dB(A) +5°C and +40°C (41°F and 104°F) with a relative humidity
of 60%.
1GP/1GPE/2GPS/2GPES - 2 13
2GP/2GPE/3GPS/3GPES 2-pump sets 4 15 8. INSTALLATION
2GPJ/2GPEJ - 5 16
3GP/3GPE/4GPS/4GPES 3-pump sets 6 17
3GPJ/3GPEJ - 6,5 17,5 ATTENTION Installation must be performed by
specialised and qualified personnel
4GP/4GPE 4-pump sets 7 18
(refer to the definition of qualified
4GPJ/4GPEJ - 7,5 18,5 personnel in the INTRODUCTION
chapter).
6.4. TESTING
100% of the pressure booster sets are subjected to routine 8.1. MECHANICAL FASTENING (see the attached
hydraulic, mechanical and electrical tests before being diagrams fig. C)
packaged. In particular, the operation of the set and each
individual pump is checked, a seal test is performed with the  The set must be positioned on a flat surface (refer also to
delivery outlet closed and the rated head is checked. the TECHNICAL CONSTRUCTION CHARACTERISTICS
chapter for the characteristics required for the installation
environment).
7. HANDLING AND STORAGE  The set must be positioned in a protected area with
reserved access where there is sufficient space for
7.1. HANDLING (see the attached diagrams fig. B)
maintenance and removal. It is recommended to maintain
Observe the current accident prevention at least three sides free, i.e. the side of the electric control
regulations. panel or protection panel (minimum 100 cm of free
Possible risk of crushing. space), the side opposite of the panel and the side with
Use safety footwear. the connections to the delivery and intake lines (minimum
Only use the procedures specified 50 cm of free space).
below and the lifting points provided for  If the set is provided with feet, the set must be placed on
ATTENTION
handling the package and the set after the ground.
the packaging has been removed.
The set arrives with the feet
The pressure booster sets are sent packaged on wooden disassembled. The feet must be
pallets and in a cardboard box for smaller sizes; in the case of assembled with the set lifted off the
larger sets, in addition to the pallet also a wooden crate is used ground. Therefore pay utmost attention
and additionally covered with nylon film. In the case of obvious during this operation to keep the set
dimensional problems, the intake manifold can be supplied from falling.
disassembled. Various packaging systems (by sea or other) Use safety footwear.
will be used based on specific customer request.
 If the set does not have feet, it can be fixed to the ground
The set must be handled with utmost caution during handling by means of anchors using the provided holes.
and transport. Particular attention must be paid when lifting 8.2. CONNECTION TO THE HYDRAULIC SYSTEM (see
and putting down the set: the attached diagrams fig. D)
 when the set is on a pallet, move it using a lifting carriage.
Pay attention to the weight indicated directly on the pallet. Refer to the images to identify the referenced points (“a”,”b”…).
Check the stability of the pallet on the lifting carriage The pipes must be sized to support the
before performing lifting or moving operations; maximum operating pressure of the set
 after the pallet and packaging have been removed, only (CHECK THE PUMP PRESSURE ON
use the specific hooking points provided on the base for THE PUMP PLATE TO DETERMINE
movement (note: to lift the set off the pallet, remove the THE MAXIMUM PRESSURE AT
fastening screws that anchor the set to the pallet itself). WHICH THE SET CAN OPERATE)
For larger sets, there are 4 eyebolts on the base. For
smaller sets, there are 4 holes on the base for lifting using
pipes (not supplied with the set). It is recommended to

ENGLISH 5
 If the set arrives with the intake manifold disassembled, ATTENTION The electrical connection must be
make the connection using a pipe union (“f”). performed by specialised and qualified
 Connect the set's intake (“a”) and delivery (“b”) lines to personnel (refer to the definition of
the system. The unit is supplied with threaded flanges or qualified personnel in the
flanged connections and with closing caps/flanges for the INTRODUCTION chapter).
manifold side not used for the connection. The dimension The set power supply must be supplied
of the connection pipes must be equal to or greater than by means of a permanent connection to
the set's intake and delivery manifolds; they must be as the system's electrical panel. The
short and straight as possible, and with a path that always connection must include a switch, fuses
ascends towards the pumps (intake), using as few elbows and a thermal circuit-breaker adjusted to
as possible, avoiding minimum number of elbows, the current absorbed by the set. Make
avoiding goosenecks that could cause siphons or air sure that the characteristics of the
pockets. Please note that in sets with 1 pump, the electrical panel are compatible with
manifold is not present and the connection is made those of the set. Use connection cables
directly to the intake (“a”) and delivery (“b”) lines of the with a section suitable for set absorption
single pump. (refer to the attached electrical panel
 All the threaded or flanged connections must be well manual for technical absorption data).
sealed to prevent air infiltration.
 Supports, anchors, unions, pipes and other system Check that the mains to which the set is
components must be independent of the set to prevent being connected has a functional
creating additional loads or stress. If there are support earthing system according to the
brackets (“e”) on the manifold, use them to fasten the electrical regulations applicable in the
manifold to a structure in order to reduce the load on the country. Perform the earthing
pumps. connection before performing any other
 It is recommended to install an isolating valve work on the panel.
immediately downstream of the set.
 To avoid transmitting vibrations to the system pipes, it is The sets can be equipped with electrical panels and single-
recommended to install antivibration joints on the set's phase or three-phase control devices with a thermoplastic or
intake and delivery lines. metal enclosure, depending on the size, the cable gland
 Always install a foot valve when installing above-head. output, and the different degree of protection depending on the
 In order to test the set, install a union tee downstream of it control device. The electrical components that protect the
with an isolating valve and the relative recirculation pipe auxiliaries operate with very low voltage, are easy to replace
connected to the intake tank or towards the discharge. and find commercially.

8.3. CONNECTION TO PRESSURE TANKS (see the For connecting the set to the electrical mains, refer to the
attached drawings fig. D) attached manuals and the instructions provided on the control
It is possible to assemble diaphragm tanks with a capacity of panel (sets with EP/EP-E/SP-EFC/SP-MFC control system) or
up to 24 litres on the delivery manifold, depending on the on the protection panel (sets with E-drive, E-SPD control
number of pumps. It is recommended to only install tanks type- system).
approved according to Directive 2014/68/EU. They must only
be installed on specific G 1 pipe sections (“c”). If using larger For the set's wiring diagram for connecting the electric pumps
sized diaphragm pressure tanks (precharged or supplied by a to the panel or the control device, refer to the ATTACHED
compressor), the connection must be made to the end of the DIAGRAMS chapter (fig. G).
delivery manifold not used for the connection to the system (for For the characteristics and wiring diagram for the panel/control
sets with more than 1 pump). For air cushion type pressure device, see the attached manual for the electrical panel or
tanks, the automatic supply must be connected with the G 1/2 control device provided with the set.
intake located on the pump intake line (“d”), which is only For the electrical characteristics of the panel/control device,
present in sets with an EP electrical panel. In any case, refer to see the attached manual for the electric pumps.
the tank's instruction manual. If connecting pressure switches and transducers, see the
information provided on the devices themselves.
8.4. PRIMING (see the attached diagrams fig. E) For further information, or if there are questions concerning the
 Set with positive head (priming tank with a level correct connection, contact the closest authorised reseller or
service centre, specifying the data identifying the set located
higher than the pump intake opening): open the set's
on the DATA PLATE.
intake isolating valves (“i”), and close the delivery
isolating valves (“h”), remove the filling cap located on the
Note: for sets with a three-phase connection, after making the
top of the pumps (“g”) (see the manual for the specific
connection to the terminal board, immediately check the
pump for additional information) and wait until water exits.
rotation direction of the motor cooling fan, which must be
If there is no leakage (e.g. horizontal priming) from the
compatible with the instructions provided on the fan cover and
stop valve, fill through the pump filling hole until it
in the pump manual. If the rotation is incorrect, completely
overflows, then reclose using the relative cap.
disconnect the voltage from the panel and invert the
 Set with negative head. (priming tank with a level
connection of two of the three phases on the board, then check
lower than the pump intake opening): open the set's
again. For sets with an inverter on the motor, use the keypad
intake isolating valves (“i”), remove the filling cap from the
to invert the rotation direction.
pumps (“g”) and fill until it overflows. Then reclose using
the relative cap.
10. STARTING THE SYSTEM
9. ELECTRICAL CONNECTION
For the first start-up of the set, follow the described procedure
(see the attached diagrams fig. F):

ENGLISH 6
 make sure that the set is full of water; frequency of the checks is indicated in detail for each
 open the pump intake (“i”) and delivery (“h”) isolating operation.
valves;
 close the valve downstream of the system;  Check the state of wear of the set's electrical cables and
 provide voltage to the electrical panel or the protection the electrical connections. If breakage or deterioration is
panel (“m”); found in the cable's protective sheaths, in the case of
insecure connections or any faults, contact your closest
For versions with the EP/EP-E/SP-EFC/SP-MFC control panel service centre or distributor. (EVERY 6 MONTHS).
 Check that the set is operating efficiency by opening the
 start the first pump in the set manually. For the procedure valve downstream of the set itself to check that the pumps
to follow, see the attached manual for the electrical panel. start, following the procedure described in the
After checking that it starts, stop the pump manually; “STARTING THE SYSTEM” chapter. If problems are
 manually start the other pumps in the set one at a time (if found when starting the pumps, contact your closest
present). For the procedure to follow, see the attached service centre or distributor. (MONTHLY).
manual for the electrical panel. After checking that each  Check that the hydraulic connections upstream and
single pump starts, stop each manually before proceeding downstream of the pressure booster system do not leak
with the next one; while the system is operating. Check that the system
 switch the set's operating mode to "automatic”. For the isolating and stop valves are not clogged. If necessary,
procedure to follow, see the attached manual for the restore the line to its original state. (EVERY 6 MONTHS).
electrical panel;
11.2. EXTRAORDINARY MAINTENANCE
 slowly open the isolating valve downstream of the system.
the unit will activate automatically. Check the activation of Extraordinary maintenance, just like the repair operations, may
the pumps, when starting and stopping, manoeuvring the only be performed by qualified personnel (refer to the definition
downstream valve; if the pressure switches need of qualified personnel in the INTRODUCTION chapter).
adjusting, proceed as indicated in the MAINTENANCE If faults are found during operation and ordinary maintenance
AND REPAIR chapter. (see what is described in the ordinary maintenance chapter) or
if abnormal noises or vibrations are detected, stop the set and
For versions with an E-Drive/E-SPD control device immediately contact your closest service centre or distributor
 slowly open the isolating valve downstream of the system. (the complete list of resellers and service centres can be
the set will activate automatically. Check the operation of viewed at www.ebara.it) for the suitable extraordinary
the pumps, when starting and when stopping, maintenance operations.
manoeuvring the downstream valve.
11.3. FAULT AND INTERVENTION TABLE
NB: avoid prolonged operation with the isolating valve
downstream of the system closed, to prevent damaging the Fault Probable causes Interventions
pump (internal overheating). The set Interruption of the Contact your electric
does not electrical power energy supplier
11. MAINTENANCE start Power supply cable Correctly restore the
not connected connection
properly or
Extraordinary maintenance and repair interrupted
operations must be performed by Electrical Correctly restore the
ATTENTION qualified personnel (refer to the
connections between connections
definition of qualified personnel in the set components
INTRODUCTION chapter). Failure to interrupted
observe this rule voids the warranty and Problem related to Check the fault and
puts the health of workers and the the control intervention in the
efficiency of the set at serious risk. panel/control attached control
Every maintenance and repair operation device/protection panel/control device/
must be performed with the set panel protection panel
disconnected from the electrical power manual
supply.
Pressure booster sets do not require any particular Faulty Friction between Check the impellers,
maintenance. The operations to perform are divided between operation of rotating parts and shafts and seals
ordinary and extraordinary maintenance operations depending the unit with fixed parts
on the skills required for the relative operation. Also refer to the vibrations Defective bearings Replace the
instruction manual for the electric pump, the electric panel or and noise bearings
the control device. Any problems can be solved by consulting The set operates Adjust the work
the table below. It is recommended in case of a problem not outside the curve conditions
indicated in the table, for operations indicated in the table that
require the intervention of qualified personnel (refer to the
definition of qualified personnel in the INTRODUCTION
Pumps Pressure switches Recalibrate the
chapter) or for other requirements, to contact your closest
continuously not calibrated pressure switches or
service centre or distributor.
operating correctly (if present) replace them
11.1. ORDINARY MAINTENANCE
Ordinary maintenance consists of simple control operations
that can be performed by the operator who uses the set. The

ENGLISH 7
System Isolating valves or Open or check the NB: depending on the characteristics of certain types of pumps
design stop valves partially valves (with flat curve), the pressure switch for pump no.1 (or pilot)
pressure not closed or obstructed may be calibrated at a stopping pressure P1= P0 – 0.3 bar Any
reached diaphragm tanks must be calibrated by the user at a pressure
0.3-0.5 bar lower than the starting pressure of the pressure
Excessive intake Reduce the pressure switch of the last pump (minimum pressure).
and/or delivery losses
pressure loss Check for clogging in Regulating range:
the pipes

Presence of air in Check the flanged or MINIMUM


the intake threaded MAXIMUM
PUMP P DIFFERENTI
connections and the PRESSURE DIFFERENTI
STOP AL
SWITCH TYPE AL P2
gaskets for any liquid PRESSURE P
leaks or air [bar]
[bar] [bar]
infiltrations, install air
bleed valves on the PY06 1.5 - 4.5 0.8 - 1.2 -
delivery line if PY12 4.5 - 10.3 1.2 - 2.1 -
necessary XMP A06 1-6 0.8 - 1.2 0.8 - 4.2
The three-phase Invert the two XMP A12 1.3 - 12 1 - 1.7 1 - 8.4
pumps rotate in the phases on the panel XMX A25 3.5 - 25 3.4 - 4.5 3.4 - 20
inverse direction FSG 2NE – 9NE 1.4 - 4.6 1 - 1.2 1.2 - 2.3
Pressure switches Recalibrate the FYG 22NE 2.8 - 7 1.2 - 1.6 2.3 - 2.7
not calibrated pressure switches or
correctly (if present) replace them
Triggering of the Check the valves Note: check directly on the installed pressure switches for the
minimum pressure upstream of the identification code of the assembled model.
switch (if present) intake manifold or
due to a low level or check for leaks. Adjustment procedure (see image fig. H):
lack of liquid in the Restore the liquid
intake manifold level  completely loosen the regulating nut or screw “B” of
Triggering of the Check or restore the pressure switch 1 of pump no. 1 (in this you have the
float switches. level in the tanks and minimum differential ∆P)
correctly adjust the  start pump no. 1 by means of the manual control (or the
floats pilot pump when the set is provided with one);
 slowly close the isolating valve downstream of the set
11.4. CALIBRATING THE PRESSURE SWITCHES until obtaining the desired stop pressure (reading on the
The pressure switches are only present in sets with an EP, SP- pressure gauge), adjust pressure switch no. 1 by rotating
EFC or SP-MFC control panel. the nut or screw “A” until the contact clicks open, this
The pressure switches are calibrated (at ambient temperature) operation will stop the pump;
according to the following standard table:  slowly open the isolating valve downstream of the set,
which causes a loss of system pressure until the contact
clicks shut for pressure switch no. 1(which is already set
Pressure switch calibration table: with minimum  P), this operation will start the pump.
Pump Type of Calibrating Sets Check the adjustment by increasing and decreasing the
sequence operation pressures pressure downstream of the system, always using the
[bar] isolating valve;
Pump no. 1  perform the same operations for the set’s remaining
Stop P1=P0-10% Sets with 1 pressure switches. To adjust the start and stop of the
(or pilot pump) pump
Pressure switch pumps, use the information provided above in the
Start P2=P1-Pmin
no. 1 “Pressure switch calibration table”. Pay particular
Pump no. 2 Stop P3=P1-0.5 Sets with 2 attention to set the starting values for the pumps following
Pressure switch the first one, with decreasing pressure values to prevent
pumps
no. 2 the simultaneous start of the pumps;
Start P4=P3-Pmin
 discharge the downstream pressure, set automatic
Pump no. 3 operation on the control panel, slowly open the isolating
Stop P5=P3-0.5 Sets with 3
Pressure switch pumps valve downstream of the set, check the sequential
no. 3
Start P6=P5-Pmin intervention calibration of the pumps at least twice to
Pump no. 4 further check the inversion of the starting order of the
Stop P7=P5-0.5 Sets with 4 pumps.
Pressure switch pumps
no. 4
Start P8=P7-Pmin

With:

P0 = max pressure in bar of pump no. 1 (or pilot pump) with


the opening closed
P1 - P8 = calibrating pressures in bar (see the following table)
ΔP = minimum differential in bar (see the following table)

ENGLISH 8

12. DISPOSAL

When discontinuing operation, the pressure booster set, or any


of its components, must be disposed of in a separated manner
according to what is set forth by the regulations in force in the
country where the set is installed.
For components such as the pump inverter panels and
pressure switches, see the specific component manuals

In particular, this symbol on the product indicates that it cannot


be disposed of together with domestic waste. This provision
concerns only the disposal of equipment in the territory of the
European Union (2012/19 EU).

ENGLISH 9
13. ATTACHED DIAGRAMS
A – SHOT-PEENED SETS

SET TYPE WITH


SET 1 PUMP WITH E-DRIVE CONTROL
EP/EP-E/SP-EFC/SP-MFC CONTROL

SET TYPE WITH SET TYPE WITH


E-DRIVE CONTROL E-SPD CONTROL

1- electric pumps;
2- pressure gauge;
3- pressure switches (EP/SP-EFC/SP-MFC);
4- pressure transducer (EP-E/SP-EFC/SP-MFC/E-DRIVE/E-SPD);
5- intake manifold (or intake connection for sets with 1 pump);
6- delivery manifold (or delivery connection for sets with 1 pump);
7- intake and delivery isolating valves;
8- stop valve;
9- intake nipples with G 1/2 UNI ISO 228/1 connection for connection to the air supply (EP/EP-E);
10- electric control panel (EP/EP-E/SP-EFC/SP-MFC);
11- control device (E-DRIVE/E-SPD);
12- protection panel (E-DRIVE/E-SPD);
13- base (with feet if made of folded metal sheet);
14- vertical diaphragm type vessels on the delivery line (upon request and separately);
15- pressure switch kit for minimum pressure (upon request);
16- various fittings.

ENGLISH 10
B - LIFTING

1-Pallet lifting with the lifting carriage


2-Lifting with pipes
3-Lifting with eyebolts

C – MECHANICAL FASTENING

1-Feet fastening on the base


2-Fastening points for anchoring to the ground using anchors

ENGLISH 11
D – HYDRAULIC CONNECTIONS

1-Group with threaded connections a-Intake line d-G1/2 intake


2-Group with flanged connections b-Delivery line e-Manifold support bracket
3-Group with 1 pump c-G1 pipe section f-Pipe union

E – PRIMING

g-Filling cap
h-Delivery isolating valves
i- Intake isolating valves

F – STARTING THE SYSTEM

h-Delivery isolating valves


i-Intake isolating valves
m-Electrical panel or protection panel

ENGLISH 12
G – WIRING DIAGRAMS

MAIN DIAGRAM

VERSION WITH CONTROL PANEL (EP/EP-E/SP-EFC/SP-MFC)

POWER SUPPLY

QE = Control panel
P1(2,3,4) = Electric pump 1(2,3,4)
PR1(2,3,4) = Pressure switch 1(2,3,4) (NO connection) (EP-E excluded)
PRM = Minimum pressure switch - optional
TR = Transducer (EP excluded)
Notes:
- for connecting the panel to the power supply line, see the attached control panel manual
- The connections with dash lines are the responsibility of the installer

VERSION WITH ON-BOARD PUMP INVERTER (E-DRIVE)

POWER SUPPLY

QP = Protection panel
P1(2,3,4) = Electric pump 1(2,3,4)
TR1(2,3,4) = Transducer 1(2,3,4)
INV1(2,3,4) = Inverter 1(2,3,4)
Notes:
- for connecting the protection panel to the power supply line, see the attached panel manual
- The connections with dash lines are the responsibility of the installer

ENGLISH 13
VERSION WITH ON-BOARD PUMP INVERTER (E-SPD)

QP = Protection panel
P1(2,3,4) = Electric pump 1(2,3,4)
TR1(2,3,4) = Transducer 1(2,3,4)
INV1(2,3,4) = Inverter 1(2,3,4)
*Lm1(2.3) = Ferrite, only for MV models
*Lt1(2.3) = Ferrite, only for TT models

Notes:
- for connecting the protection panel to the power supply line, see the attached panel manual
- The connections with dash lines are the responsibility of the installer

Note: “Lm” ferrite application (E-SPD MV models)


For single-phase models (E-SPD MV), the ferrite is positioned close to the inverter, encasing the power cable, as shown in the
inverter's specific instruction manual.

Note: “Lt” ferrite application (E-SPD TT models)


For three-phase models (E-SPD TT), the ferrite is positioned encasing the 4 motor power connecting cables, therefore close
to the “MOTOR OUTPUT” terminal block of the inverter internal board.

FERRITE APPLICATION TT

ENGLISH 14
MOTOR CONNECTION DIAGRAMS

SINGLE-PHASE MOTOR CONNECTION

YELLOW/GREEN

MOTOR PROTECTOR IN MOTOR PROTECTOR IN


TERMINAL BOX TERMINAL BOX
CAPACITOR

CAPACITOR
PANL PANEL

ENGLISH 15
THREE-PHASE MOTOR CONNECTION WITH CONTROL PANEL (EP/EP-E/SP-EFC/SP-MFC)

TRIANGLE CONNECTION
With three-phase power supply
 EP-E (≥ 5.5 kW*)
 EFC-T (≥ 5.5 kW*)
 MFC (≥ 5.5 kW*)

YELLOW/GREEN
BROWN
BLACK

GREY
PANEL CABLE

STAR CONNECTION
With three-phase power supply
 EP-E (≤ 4 kW*)
 EFC-T (≤ 4 kW*)
 MFC (≤ 4 kW*)

YELLOW/GREEN
BROWN
BLACK

PANEL CABLE GREY

SD CONNECTION
With three-phase power supply
BLACK

BROWN

GREY

 EP-SD
 EFC-SD
YELLOW/GREEN
BROWN

GREY
BLACK

PANEL CABLE

*Motor power indicated, check the type of panel (EP-T, MFC, etc.) on the plate and in the panel manual.

ENGLISH 16
THREE-PHASE MOTOR CONNECTION WITH ON-BOARD PUMP INVERTER (E-DRIVE/E-SPD)

TRIANGLE CONNECTION
With single-phase power supply
 E-DRIVE (from 1.5 to 3 kW*)
 E-SPD (≤ 2.2 kW*)

With three-phase power supply

YELLOW/GREEN
 E-DRIVE (from 5.5 to 45 kW*)

BROWN
BLACK

GRAY
INVERTER CABLE

STAR CONNECTION
With three-phase power supply
 E-DRIVE (≤ 4 kW*)
 E-SPD (≤ 4 kW*)

YELLOW/GREEN
BROWN

GREY
BLACK

INVERTER CABLE

*Motor power indicated, check the type of control device (E-DRIVE, E-SPD, etc.) in the device manual.

H – PUMP STARTING PRESSURE SWITCH

ENGLISH 17
14. MODEL IDENTIFICATION CODE

STANDARD PRESSURE BOOSTER SET TYPE KEY


3 GPE S J MATRIX 5-6/1.3I MFC 304 H P25 XXX

Variant codes for special products

PN standard (10÷16)
Nominal set pressure P25 PN25
P40 PN40

M Only manifolds
Special material conf. H Hydraulic
F Complete (H+base)
O Brass valves

OT Galvanised manifold + brass valves


Special material 304 AISI 304
316 AISI 316

- EP/EP-E control panel


EFC Single inverter SP-EFC
MFC Multi inverter SP-MFC
EDM E-Drive MT
Type of control EDT E-Drive TT
ESPM E-SPD MT
ESPT E-SPD TT
EPW E-Power
HYD Hydrocontroller

Main pump model

Presence of pilot pump


J With pilot pump

Presence of pump(s) in stand-by


S Dimensioned with pump(s) in stand-by

Type of pressure boost set GP Fixed speed


GPE Variable speed

No. of total main pumps (including any pumps in stand-by)

CONFIGURED PRESSURE BOOSTER SET TYPE KEY

3 x MATRIX 5-6/1.3I x EPT

EPM Control panel for fixed speed with single-phase power supply (EP/EP-E)
EPT Control panel for fixed speed with three-phase power supply (EP/EP-E)
SP-EFC Control panel with single inverter SP-EFC
SP-MFC Control panel with multi inverter SP-MFC
Type of control E-DriveControl
MT device with E-Drive inverter with single-phase power supply
E-DriveControl
TT device with E-Drive inverter with three-phase power supply
E-SPDControl
MT device with E-SPD inverter with single-phase power supply
E-SPDControl
TT device with E-SPD inverter with three-phase power supply
E-PowerControl device with E-Power inverter
Hydrocontroller
Control device with hydrocontroller inverter

Pump model

No. of pumps

ENGLISH 18
15. DATA PLATE

STANDARD PRESSURE BOOSTER SETS GP/GPE/GPS/GPES/GPJ/GPEJ

1-“TYPE”: Type key


2-“P/N“: Part number
3-“S/N”: Serial number

CONFIGURED PRESSURE BOOSTER SETS

1-“TYPE”: Type key


2-“I/C”: Identification code
3-“P/N“: Part number
4-“S/N”: Serial number

ENGLISH 19

You might also like