0% found this document useful (0 votes)
495 views3 pages

Sub - Contract Agreement

This subcontract agreement is between a contractor and subcontractor to complete work on a construction project. The subcontractor agrees to furnish labor and materials to perform the work described in the project documents, including drawings, specifications, and addenda. The subcontractor must take out insurance, pay taxes, and acquire necessary permits. Payment will be made monthly based on completed work, with the final payment occurring within a set number of days after acceptance by the owner contingent upon submitting required documentation. The agreement also outlines special conditions that must be initialed by both parties.

Uploaded by

Ramon Sotta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
495 views3 pages

Sub - Contract Agreement

This subcontract agreement is between a contractor and subcontractor to complete work on a construction project. The subcontractor agrees to furnish labor and materials to perform the work described in the project documents, including drawings, specifications, and addenda. The subcontractor must take out insurance, pay taxes, and acquire necessary permits. Payment will be made monthly based on completed work, with the final payment occurring within a set number of days after acceptance by the owner contingent upon submitting required documentation. The agreement also outlines special conditions that must be initialed by both parties.

Uploaded by

Ramon Sotta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

SUBCONTRACT AGREEMENT

THIS AGREEMENT, made this _____________ day of ________________________, 20__, by


and between ________________________________________ of ___________________________
hereinafter called the Contractor and
_______________________________________________________ of
______________________________________________ hereinafter called the Subcontractor.
Witnesseth, That for the consideration hereinafter named, the said Subcontractor agrees with said
Contractor, as follows:
SECTION 1: The Subcontractor agrees to furnish all labor, material, necessary to perform and
complete all the work for (Project Description)

As described in Section 2 hereof, and in accordance with the drawings, General Conditions of the Contract,
Supplementary General Conditions, specifications and addenda Nos. ___________________ to
________________, inclusive, prepared by
_________________________________________________.
SECTION 2: Scope of Work: The Subcontractor agrees to promptly begin said work within ____
days, after notification by said Contractor, and complete all work as follows: ________________________
__________________________________________________________________________________
____ in accordance with this Agreement.
(Work Description)

SECTION 3: The Subcontractor shall take out and pay for Employers’ Liability Insurance and
Public Liability and Property Damage Insurance, certificates of same to be deposited with the Contractor
before any work is started; also pay for all state and/or federal taxes, assessments, Unemployment
Compensation Contributions or other charges, and acquire and pay for necessary permits and/or licenses to
do business as required by law.

SECTION 4: No extra work, back charges or changes under this contract will be recognized or paid
for, unless agreed to in writing by the Contractor and Subcontractor before the work is done or the changes
made. No oral agreements will be made by either party.

SECTION 5: This contract shall not be assigned by the Subcontractor without first obtaining
permission in writing from the Contractor. The Subcontractor shall be responsible for performance of work
by his employees, agents or his Subcontractors, and the Subcontractor agrees to bind his Subcontractors to
all provisions of this agreement.

SECTION 6: Subcontractor agrees to be bound by all terms and conditions of all provisions of the
General Conditions of the Contract (AIA A201 latest edition unless otherwise specified).

Insofar as the provisions of the General Contract do not conflict with specific provisions herein
contained, they, and each of them, are hereby incorporated into this Subcontract as fully as if completely
rewritten herein. The Subcontractor agrees to be bound to the Contractor by all terms of the General
Contract applicable to this Subcontract, and to assume toward Contractor, with respect to the work and all
operations of Subcontractor on this construction project, all the obligations and responsibilities that
Contractor by the General Contract assumes toward Owner. The Subcontractor agrees that it will so perform
this subcontract as not to violate any terms, covenants or conditions of the General Contract. The
relationships of the Subcontractor hereunder toward Contractor shall be the same as that of Contractor
toward the Owner under the General Contract, and the relationship of the Contractor hereunder to the
Subcontractor shall be the same as that of the Contractor under the General Contract.

SECTION 7: The Subcontractor and Contractor agree to observe and comply with all applicable
federal, state, and local laws, ordinances, rules, and regulations, including but not limited to the
Occupational Safety and Health Act of 1970 effective where the work under this Subcontract is to be
performed.

SECTION 8: The Subcontractor agrees to indemnify and save harmless the Contractor from any
and all loss or damage (including, without limiting the generality of the foregoing, legal fees, and
disbursements paid or incurred by the Contractor to enforce the provisions of this paragraph), occasioned
wholly or in part by any negligent act or omissions of the Subcontractor or that of anyone directly or
indirectly employed by them or performing the work of this Subcontract under the direction of the
Subcontractor or anyone for whom acts any of them may be liable in carrying out the provisions of the
general contract and of this Subcontract regardless of whether or not it is caused in part by a party
indemnified hereunder.

SECTION 9: Special Conditions: (Insert the word “None” OR the Special Conditions.) Note: All
Special Conditions must be INITIALED by both parties.

IN CONSIDERATION WHEREOF, the said Contractor agrees that he will pay to the said Subcontractor, in
_____ payments, the sum of _____________________________ Dollars ($ _________) for the said
materials and work, said amount to be paid as follows: __________________ percent (________%) of the
value of labor and materials incorporated by Subcontractor in the work and of materials stored on the job
site in an acceptable manner, to be paid on the _____________ of the following month, except the final
payment which the said Contractor shall pay to the said Subcontractor within __________________ days
after the final acceptance of the Subcontractors work by the Architect-Engineer-Contractor-Owner (circle
which one is applicable) and said Subcontractor shall have submitted satisfactory evidence that all
obligations have been paid, and said Subcontractor has filed all necessary Sales and Use Tax report forms
and any other required reports.

The Contractor and the Subcontractor for themselves, their successors, executors, administrators and
assigns, hereby agree to the full performance of the covenants of this agreement.

IN WITNESS WHEREOF, they have executed this agreement the day and date written above.

__________________________________
Contractor
By________________________________

__________________________________
Subcontractor
By________________________________

You might also like