0% found this document useful (0 votes)
94 views2 pages

Installation Details

This document provides installation details for two models of Teamtec incinerators: the OG 200 CSW and OG 400 CSW. It specifies requirements for power supply, oil supply and return lines, flue gas system ductwork, and air consumption. Key specifications include requiring a 32A fuse, 15kW power consumption, 400L minimum diesel oil tank, 300/350mm minimum flue gas duct diameter, and 4,200/4,750Nm3/h air supply for combustion/cooling. Diesel oil, drain, and electrical connection sizes are also listed.

Uploaded by

AlexDor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views2 pages

Installation Details

This document provides installation details for two models of Teamtec incinerators: the OG 200 CSW and OG 400 CSW. It specifies requirements for power supply, oil supply and return lines, flue gas system ductwork, and air consumption. Key specifications include requiring a 32A fuse, 15kW power consumption, 400L minimum diesel oil tank, 300/350mm minimum flue gas duct diameter, and 4,200/4,750Nm3/h air supply for combustion/cooling. Diesel oil, drain, and electrical connection sizes are also listed.

Uploaded by

AlexDor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Appendix No.

1
INSTALLTION DETAILS FOR TEAMTEC (GOLAR) INCINERATOR
OG 200 CSW OG 400 CSW
Power supply 380/440V:
Required fuse sizes on supply cable 32 A 32 A
Power consumption in operation 15 kW 15 kW
Power supply cable size 3×10 mm2 3×10 mm2
Cable panel/incinerator-size/Nos. ** N. A. N. A.
Cable panel/flue gas fan –size 3×4 mm2 3×4 mm2
Cable panel/flue gas damper 3×1.5 mm2 3×1.5 mm2
Cable panel/flue gas fan (transmitter on flue gas
fan ) 2×1.0mm2 2×1.0mm2
w/screen w/screen
Oil supply/return :
Diesel oil supply line 12 mm 12 mm
Diesel oil return line 12 mm 12 mm
Max .diesel oil supply pressure/suction lift 1.5 bar/0.35 bar 1.5 bar/0.35 bar
Max .diesel oil back pressure 1.5bar 1.5 bar
Recommended min. diesel oil tank size 400 l 400 l
Flue gas system:
Flue gas duct diam. min. (after flue gas fan) 300 mm 350 mm
Heat resistant flue gas duct diam. 400 mm 400 mm
(between incinerator and damper)
Material in flue gas duct Mild carbon Mild carbon
steel steel
*Length of "heat resistant“ ductwork, min. 2.5 m 2.5 m
Air consumption:
Necessary air supply for combustion/cooling 4,200Nm3/h 4,750Nm3/h

* The heat resistant ductwork should be capable to withstand a temperature at 800℃ (Stainless
steel quality AISI 304 may be used.)
** One or more cables can be used having min.13 conductor plus ground.

8
Appendix No. 2

INSTALLATION DETAILS FOR TEAMTEC (GOLAR) INCINERATOR


OG 200 CSW OG 400 CSW

Diesel oil supply/return:


Diesel oil supply to incinerator DN 15 DN 15
Diesel oil return from incinerator DN 15 DN 15

Drain pipe from spill collector: DN25 DN25

You might also like