Appendix No.
1
INSTALLTION DETAILS FOR TEAMTEC (GOLAR) INCINERATOR
OG 200 CSW OG 400 CSW
Power supply 380/440V:
Required fuse sizes on supply cable 32 A 32 A
Power consumption in operation 15 kW 15 kW
Power supply cable size 3×10 mm2 3×10 mm2
Cable panel/incinerator-size/Nos. ** N. A. N. A.
Cable panel/flue gas fan –size 3×4 mm2 3×4 mm2
Cable panel/flue gas damper 3×1.5 mm2 3×1.5 mm2
Cable panel/flue gas fan (transmitter on flue gas
fan ) 2×1.0mm2 2×1.0mm2
w/screen w/screen
Oil supply/return :
Diesel oil supply line 12 mm 12 mm
Diesel oil return line 12 mm 12 mm
Max .diesel oil supply pressure/suction lift 1.5 bar/0.35 bar 1.5 bar/0.35 bar
Max .diesel oil back pressure 1.5bar 1.5 bar
Recommended min. diesel oil tank size 400 l 400 l
Flue gas system:
Flue gas duct diam. min. (after flue gas fan) 300 mm 350 mm
Heat resistant flue gas duct diam. 400 mm 400 mm
(between incinerator and damper)
Material in flue gas duct Mild carbon Mild carbon
steel steel
*Length of "heat resistant“ ductwork, min. 2.5 m 2.5 m
Air consumption:
Necessary air supply for combustion/cooling 4,200Nm3/h 4,750Nm3/h
* The heat resistant ductwork should be capable to withstand a temperature at 800℃ (Stainless
steel quality AISI 304 may be used.)
** One or more cables can be used having min.13 conductor plus ground.
8
Appendix No. 2
INSTALLATION DETAILS FOR TEAMTEC (GOLAR) INCINERATOR
OG 200 CSW OG 400 CSW
Diesel oil supply/return:
Diesel oil supply to incinerator DN 15 DN 15
Diesel oil return from incinerator DN 15 DN 15
Drain pipe from spill collector: DN25 DN25