General Data and Information

The document outlines a testing assessment conducted by United Engineering for a project on December 8, 2014. It includes sections on general data, mechanical checks, relay settings, measurement accuracy, functional checks, LED checks, and instruments used. The assessment is signed off by Baskar Palani, indicating that the tests were conducted, witnessed, and approved.

Uploaded by

deltavijayakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views4 pages

General Data and Information

The document outlines a testing assessment conducted by United Engineering for a project on December 8, 2014. It includes sections on general data, mechanical checks, relay settings, measurement accuracy, functional checks, LED checks, and instruments used. The assessment is signed off by Baskar Palani, indicating that the tests were conducted, witnessed, and approved.

Uploaded by

deltavijayakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

TESTING

CONTRACTO UNITED ENGINEERING DATE: 08-12-


ENGINEER Page 1 of 4
R PROJECTS CO LLC 2014
ASSESSMENT

1. GENERAL DATA AND INFORMATION:


Make Serial No.
Dwg No. Model No.
Designation Version
Rated Current Aux. Voltage
Rated Frequency Rated Voltage

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


Item Description Checked
1 Inspect for any physical damage or defects.
2 Verify connections as per approved drawings.
3 Check that serial no. of relay matching with serial no. of case.
4 Case earth installed.
3. OPTO INPUTS:-
INPUT FUNCTION INPUT FUNCTION

4. OUTPUT RELAYS:-
RELAY FUNCTION RELAY FUNCTION

Tested: Witnessed Approved

BASKAR PALANI

Signature Signature Signature

Name Name Name


TESTING
CONTRACTO UNITED ENGINEERING DATE: 08-12-
ENGINEER Page 2 of 4
R PROJECTS CO LLC 2014
ASSESSMENT

5. RELAY SETTING:
DESCRIPTION VALUE DESCRIPTION VALUE DESCRIPTION VALUE

6. MEASUREMENT ACCURACY CHECKS:-


Displayed Voltage (Primary / Secondary) Primary

Input VT Expected Displayed Voltage(KV)


Voltage(KV) R Y B N
R
Y
B
R-Y
Y-B
B-R
R-Y-B
Displayed current (Primary / Secondary) Primary

Input CT Expected Current In Displayed Current(A)

Tested: Witnessed Approved

BASKAR PALANI

Signature Signature Signature

Name Name Name


TESTING
CONTRACTO UNITED ENGINEERING DATE: 08-12-
ENGINEER Page 3 of 4
R PROJECTS CO LLC 2014
ASSESSMENT

Amps R Y B N
R
Y
B
R-Y
Y-B
B-R
R-Y-B

7. OMICRON ADVANCE DISTANCE PROTECTION TEST RESULTS ATTACHED:

8. Functional Checks:

Function Checked
Events
Fault recorder
Watchdog Contact

9. LED Checks:
LED NAME LED NAME

10. Instruments Used:

Sl.No Description Make Sl No. Calib. date Calib. due date


1.

Tested: Witnessed Approved

BASKAR PALANI

Signature Signature Signature

Name Name Name


TESTING
CONTRACTO UNITED ENGINEERING DATE: 08-12-
ENGINEER Page 4 of 4
R PROJECTS CO LLC 2014
ASSESSMENT

2.
3.

Tested: Witnessed Approved

BASKAR PALANI

Signature Signature Signature

Name Name Name